233 editable BuildOut arrangement documents support the 35 policy examples in the management-system overview. Procedures and plans contain completed fictional arrangements. Checklists, assessments, RAMS, permits and recording forms are blank masters. Each Excel register includes a separate worked example and guide.
These documents describe arrangements and recording tools. They do not represent approved company issues or completed operational records.
233 documents
Leadership and document control policy · 8 arrangements
- Governance, document change and review procedure
Approve documents, assign owners, control versions and evaluate management performance.
- Legal and other requirements register
A detailed GB construction legal baseline with 142 requirement entries, environmental permits and consents, national overlays and eight completed fictional decisions, plus a blank live register.
- Document and records control register
Control IDs, revisions, approvals, access, retention and withdrawn copies.
- Annual health and safety objectives and resources plan
Set measurable objectives, owners and resources based on risks and performance.
- Management review and improvement decision record
Record review inputs, decisions, resources, actions and follow-up.
- Management-of-change assessment
Assess new work, equipment, workforce or sequencing before approval.
- Dutyholder and responsibility appointment record
Make role, competence, authority, interfaces and acceptance explicit.
- Employers liability insurance and statutory information register
Track insurance cover/certificate accessibility and required health and safety information for employees.
CDM project delivery policy · 7 arrangements
- CDM project mobilisation and coordination procedure
Confirm dutyholders, information, time/resources, construction phase plan, site rules and handover.
- Project CDM applicability and dutyholder checklist
Check project definition, client type, contractor count, appointments and notification threshold.
- Pre-construction information and gap register
Track asbestos, services, design, client and existing-structure information gaps.
- Construction phase plan
Set project health and safety arrangements, site rules and specific high-risk measures before construction starts.
- F10 notification decision and submission record
Record threshold assessment, responsible dutyholder and update/submission evidence when required.
- Coordination meeting and interface action record
Record trade sequencing, shared risks, access and responsibilities.
- Health and safety file and handover checklist
Gather proportionate residual-risk information and agree file responsibilities and delivery.
Design risk management policy · 6 arrangements
- Design review and residual-risk communication procedure
Record design decisions, interfaces, change control and safety-critical information.
- Design hazard and residual-risk register
Track design elimination/reduction decisions and residual risks requiring communication.
- Design risk review and change approval record
Review buildability, temporary stability, use and maintenance interfaces.
- Designer capability and appointment checklist
Confirm role, skills, knowledge, experience and organisational capability.
- Safety-critical design information transmittal
Record issue and acknowledgement of significant residual risks.
- Building-control and higher-risk-building interface screen
Determine whether additional building-safety appointments, controls and approvals require specialist review.
Risk assessment and RAMS policy · 7 arrangements
- Assess, review, brief and authorise work procedure
Identify hazards and affected people, select controls, verify competence and reassess changing conditions.
- Project baseline risk assessment
Assess project-wide interfaces and prioritise further task assessments.
- Task RAMS preparation and authorisation template
Document task sequence, hazards, controls, competence, hold points and emergency arrangements.
- Subcontractor RAMS technical review checklist
Test site specificity, practicality, hierarchy of controls and interface completeness.
- Point-of-work change and stop-work review
Record changed conditions, suspension, reassessment and safe restart authority.
- Young-person, pregnancy and other individual-risk assessment
Identify additional risks and suitable adjustments while protecting personal information.
- RAMS briefing and understanding record
Confirm relevant workers understand the task and controls in an accessible language/format.
People and competence policy · 7 arrangements
- Competence verification and induction procedure
Check role-specific evidence and practical capability; identify training needs and supervision.
- Role competence and training matrix
Match actual work and expiry dates to verified competence and supervision needs.
- Worker competence verification and authorisation
Check evidence and practical capability before allocating higher-risk tasks.
- Project and visitor induction checklist
Explain site rules, hazards, welfare, emergency routes and reporting.
- Training, familiarisation and supervision record
Record learning, assessment, limitations and supervisor follow-up.
- Training-needs and refresher programme
Prioritise competence gaps and mandatory/specialist training by actual activities.
- Apprentice and inexperienced-worker supervision plan
Specify restricted tasks, competent supervision and progressive authorisation.
Worker consultation policy · 5 arrangements
- Consultation, toolbox briefing and feedback procedure
Plan consultation, record worker input and close out concerns with accessible communications.
- Worker consultation and safety-meeting plan
Choose consultation routes and opportunities that reach employees and subcontractors.
- Safety representative and consultation meeting minutes
Record suggestions, decisions, unresolved concerns and agreed actions.
- Toolbox talk and worker-feedback record
Capture topic, attendance, understanding and feedback without equating attendance with competence.
- Hazard, good-catch and improvement suggestion report
Enable workers to raise practical issues and receive feedback.
Contractors and procurement policy · 6 arrangements
- Contractor selection, onboarding and coordination procedure
Evaluate capability, agree responsibilities and RAMS, monitor performance and change subcontractors safely.
- Contractor prequalification and capability review
Assess competence, resources, previous performance and scope-specific controls.
- Subcontractor scope and safety-interface agreement
Define supplied information, shared facilities, supervision and emergency responsibilities.
- Supplier and hired-equipment acceptance checklist
Verify specifications, operating instructions, inspection evidence and support.
- Contractor performance and escalation review
Record performance, recurring concerns and corrective actions.
- Material/product substitution safety review
Check changed hazards, installation method and compatibility before substitution.
Site establishment and welfare policy · 7 arrangements
- Site setup, welfare and housekeeping procedure
Plan boundaries, temporary accommodation, welfare servicing and routes before mobilisation.
- Site establishment, welfare and access plan
Lay out boundaries, welfare, accommodation, storage and emergency routes.
- Welfare readiness and daily condition check
Verify toilets, washing, drinking water, changing and rest facilities are suitable and maintained.
- Housekeeping, access and storage inspection
Control slips, trips, waste, stacking and blocked routes.
- Occupied premises and vulnerable-person interface assessment
Coordinate safe separation, access, dust/noise/fire controls and communication.
- Site security, visitors and signage check
Prevent unauthorised access and keep visitors supervised and informed.
- Snagging, cleaning and handover in occupied areas RAMS
Public segregation, cleaning substances, access, isolated tasks and final reinstatement.
Work at height policy · 11 arrangements
- Work-at-height planning, authorisation and inspection procedure
Select suitable collective protection/access equipment, verify competence and plan rescue.
- Work-at-height selection and rescue assessment
Evaluate avoidance, collective protection, access suitability and rescue needs.
- Roof, fragile surface and edge work RAMS
Set access, fall/falling-object prevention, weather limits and emergency controls.
- Scaffold, tower and MEWP work RAMS
Set erection/use limits, ground/access checks, competence and exclusion controls.
- Work-at-height equipment inspection report
Record required inspections, defects, restrictions and release of access equipment.
- Ladder and short-duration access justification/check
Demonstrate suitability for low-risk work and check condition and positioning.
- Suspended-person and MEWP rescue plan
Define competent rescue actions, equipment, communication and rehearsal.
- Scaffold design, assembly, use and dismantling plan
Confirm recognised configuration or competent calculations/design and a suitable assembly/use/dismantling plan.
- Roof covering and rooflight replacement RAMS
Fragile surfaces, edges, material loading, weather and rescue.
- Facade and cladding installation RAMS
Access, panel lifting, falling objects, temporary stability and public exclusion.
- Drylining and suspended ceilings RAMS
Suitable access, overhead work, sharp edges, handling and trade interfaces.
Lifting operations policy · 9 arrangements
- Lift planning, equipment acceptance and examination procedure
Categorise lifts, plan load/path/ground/interface controls and verify examination evidence.
- Lifting operation plan
Define load, equipment, configuration, ground support, people, communications and exclusion zones.
- Lifting interface and ground-bearing assessment
Assess overturn, suspended loads, public interfaces, weather and adjacent structures.
- Lifting equipment and accessory examination register
Track identification, examination reports, intervals and defects.
- Lift readiness and pre-use equipment check
Verify the agreed plan, competent team, load path and equipment before lifting.
- Lift briefing, deviation and completion record
Record authorisation, unexpected changes and handback.
- Structural steel erection and bolting RAMS
Lift sequence, stability, temporary bracing, work at height and falling objects.
- Glazing, windows and large doors RAMS
Fragile loads, mechanical handling, suction equipment, cuts and falling objects.
- Mechanical plant and HVAC installation RAMS
Load movement, supports, overhead work, manual handling and commissioning interfaces.
Plant and work equipment policy · 8 arrangements
- Plant acceptance, use, maintenance and isolation procedure
Check equipment before use, maintain protective devices and quarantine unsafe plant.
- Plant, tools and maintenance register
Track asset ownership, suitability, inspections, servicing and defects.
- Plant and powered-tool pre-use inspection
Identify damage, failed guards, interlocks, leaks and unsafe attachments.
- Machine guarding and entanglement assessment
Assess access to moving parts and select protective measures.
- Plant maintenance and stored-energy isolation RAMS
Control electrical, hydraulic, pneumatic, gravity and thermal energy.
- Defect, quarantine and return-to-service record
Prevent unsafe reuse until competent repair and verification.
- Carpentry, joinery and timber-frame installation RAMS
Guarded cutting, wood dust, nail guns, handling, support and access.
- Pressure testing and commissioning RAMS
Stored energy, safe test boundaries, rated components and controlled depressurisation.
Electrical safety policy · 7 arrangements
- Electrical installation, safe isolation and tool inspection procedure
Plan temporary distribution, verify installation integrity, control energisation and prevent unauthorised work.
- Temporary electrical installation and distribution plan
Define suitable supply, protection, cable routes, checks and controlled alterations.
- Electrical isolation and re-energisation permit
Identify isolation points, prove dead, lock off and control reinstatement.
- Electrical tools, leads and distribution inspection
Set risk-based user checks and inspection/testing arrangements.
- Overhead-line and live-service proximity assessment
Plan avoidance, exclusion, utility coordination and safe work methods.
- Electrical installation verification and defect closeout
Retain competent test/verification and restoration evidence.
- Electrical first/second fix and commissioning RAMS
Safe isolation, competence, temporary power, access and controlled energisation.
Temporary works and stability policy · 7 arrangements
- Temporary works coordination and permit procedure
Maintain a register and design briefs, confirm checks and release hold points before loading or striking.
- Temporary works register and design-category record
Identify each temporary works item, design/check needs and status.
- Temporary works design brief and check certificate
Capture loads, assumptions, interfaces, design/check responsibilities and approval.
- Temporary works erection/conformance inspection
Verify constructed work matches design and required inspections.
- Temporary works permit to load / bring into use
Record competent release after prerequisites and hold points are satisfied.
- Temporary works permit to strike / dismantle
Confirm strength/stability, sequencing and authority before removal.
- Concrete placement, pumping and formwork RAMS
Temporary support, hose-whip/pressure, cement contact, access and concrete placement sequence.
Excavations and buried services policy · 9 arrangements
- Ground-breaking, service verification and excavation inspection procedure
Plan survey and trial holes, support/batter excavations, inspect and coordinate permits.
- Excavation, ground and service-strike assessment
Evaluate ground stability, services, water, access, plant loads and adjacent structures.
- Permit to dig and break ground
Confirm plans, locating/survey, trial holes, isolation/interfaces and work limits.
- Excavation support, access and backfill RAMS
Set sequence, shoring/battering, edge protection, inspections and safe reinstatement.
- Excavation inspection and defect report
Record competent inspections, defects and safe-work restrictions.
- Utility detection, trial-hole and as-built record
Capture verified service position, limitations, markings and communicated changes.
- Site clearance and shallow groundworks RAMS
Service discovery, vegetation, plant/public separation and changing ground conditions.
- Piling and ground-improvement works RAMS
Ground-bearing platforms, rig stability, services, noise/vibration and exclusion interfaces.
- Drainage and sanitary installation RAMS
Ground/services, biological exposure, handling, testing and confined-space screening.
Demolition and structural alteration policy · 7 arrangements
- Demolition survey, sequence and exclusion procedure
Obtain engineering/asbestos/service information, agree written arrangements and supervise sequence.
- Demolition / dismantling written arrangements
Set competent method, sequence, stability, exclusion, services, dust and emergency controls.
- Pre-demolition survey and services-isolation checklist
Verify structural, asbestos, hazardous materials and utility information before release.
- Structural alteration and temporary-support RAMS
Control staged openings, propping, load paths and interface hold points.
- Demolition exclusion and stability inspection
Check boundaries, changing stability, debris and unplanned exposures.
- Demolition hold-point release and change record
Record engineer approval and re-assessment of unexpected conditions.
- Soft strip and internal dismantling RAMS
Asbestos/service checks, stability, dust, sharps, handling and waste routes.
Asbestos policy · 6 arrangements
- Asbestos information, work classification and discovery procedure
Verify surveys and sampling, scope works, appoint suitable specialists and stop on unexpected materials.
- Asbestos survey, information and work-area register
Link suitable survey coverage to work scope and unresolved exclusions.
- Asbestos work-classification and contractor checklist
Confirm licensing/notification route, competence, controls and required medical surveillance.
- Asbestos plan-of-work review record
Verify scope-specific plan and specialist controls before work.
- Unexpected asbestos discovery and stop-work record
Record stop, secure, communicate, investigate and controlled restart decisions.
- Asbestos exposure, health-record and clearance evidence index
Index relevant exposure/health records, air/clearance evidence and waste documents with restricted access.
Hazardous substances and dust policy · 11 arrangements
- Substance assessment, exposure control and monitoring procedure
Use task-specific COSHH assessments, competent RPE selection/fit testing and effective control verification.
- Task-specific COSHH assessment
Assess actual exposure routes and select effective controls beyond the safety data sheet.
- Silica and construction-dust control RAMS
Specify cutting method, water/extraction, RPE, cleaning and exclusion controls.
- RPE selection and face-fit record
Record compatible RPE, face-fit result, training and limitations.
- LEV and exposure-monitoring evidence register
Track control checks, thorough examinations/tests, monitoring and remedial actions.
- Biological agents, water hygiene and contaminated-ground assessment
Assess sewage, animal contamination, standing water and welfare water-system risks.
- Hazardous-substance storage, spill and waste check
Verify labelling, segregation, containers, spill response and controlled disposal.
- Screeding, flooring and tiling RAMS
Wet materials, adhesives, dust, cutting, kneeling and occupied-area segregation.
- Painting, coating and spray application RAMS
Product substitution, ventilation, skin/respiratory exposure, fire and access.
- Drilling, chasing, core cutting and grinding RAMS
Hidden services, silica, noise, vibration, rotating equipment and slurry/waste control.
- Insulation and fire-stopping installation RAMS
Product exposure, access, confined areas and quality/safety-critical interfaces.
Occupational noise policy · 5 arrangements
- Noise assessment and hearing-conservation procedure
Assess realistic exposure, select quieter methods/equipment and verify controls and surveillance.
- Task and personal noise-exposure assessment
Determine representative exposure and the measures required.
- Noise reduction and hearing-protection zone plan
Identify quieter methods, isolation, maintenance, access controls and hearing protection.
- Noise-control and hearing-protection verification
Check control use, suitability and practical effectiveness.
- Noise health-surveillance referral and follow-up
Record exposure-based referral and fitness recommendations, with clinical privacy.
Hand-arm and whole-body vibration policy · 6 arrangements
- Vibration exposure assessment and control procedure
Select low-vibration methods, estimate realistic trigger times, maintain tools and refer symptoms.
- Hand-arm vibration task/exposure assessment
Use reliable task data and realistic trigger times to reduce exposure.
- Whole-body vibration and plant-route assessment
Evaluate vehicle, ground, seat, speed and duration influences.
- Vibration exposure-control and tool-use record
Verify planned controls and investigate unexpected task duration.
- Vibration symptom and health-surveillance referral
Escalate symptoms and arrange competent surveillance where risk indicates.
- Vibration-tool selection and maintenance check
Check suitable low-vibration equipment, consumables and maintenance.
Manual handling and ergonomics policy · 6 arrangements
- Manual handling assessment and task planning procedure
Assess load, task, individual and environment; plan delivery/storage and team coordination.
- Manual handling task assessment
Evaluate task/load/environment/individual factors and practical alternatives.
- Mechanical-aid and team-handling RAMS
Define aids, routes, communications, limits and safe staging.
- Storage, delivery and handling-route check
Reduce double handling, height/reach demands and poor access.
- Handling adjustment and discomfort follow-up
Record task changes and support after difficulty or symptoms.
- Bricklaying and blockwork RAMS
Access platforms, load storage, handling, cutting dust and wet cement contact.
Fire and hot work policy · 8 arrangements
- Fire risk assessment, hot-work and fire-watch procedure
Assess ignition/fuel/occupants, coordinate occupied premises, authorise hot work and inspect fire precautions.
- Site and occupied-interface fire risk assessment
Assess ignition/fuel, people at risk, escape, alarms, response and coordinated arrangements.
- Hot-work permit and fire-watch record
Control ignition, combustible removal, fire watch, checks and final handback.
- Fire precautions, escape routes and alarm checks
Inspect escape/access, fire doors, alarms, extinguishers and housekeeping.
- Construction fire and evacuation plan
Coordinate alarm, assembly, assistance, communication and emergency-service access.
- Flammable substances and explosive-atmosphere assessment
Assess dangerous substances, ventilation, ignition controls and hazardous-area needs.
- Occupied residential building fire-duty interface checklist
Identify responsible persons, building scope and information/evacuation interfaces before refurbishment.
- Welding, brazing and thermal cutting RAMS
Fume capture, optical radiation, fire control, gas cylinders and permit interfaces.
Confined spaces policy · 6 arrangements
- Confined-space assessment, entry and rescue procedure
Classify the space, isolate, test/control atmosphere, authorise entry and rehearse rescue.
- Confined-space identification and avoidance assessment
Determine confined-space status and specified risks; explore work without entry.
- Confined-space entry permit and handback
Confirm isolation, atmospheric testing, ventilation, entrants, standby and rescue readiness.
- Confined-space rescue and emergency plan
Provide suitable rescue arrangements and competent people before entry.
- Atmospheric test, equipment and entrant log
Record readings, test equipment status, entrants and changing conditions.
- Confined-space drill and readiness review
Test practical rescue communications, equipment and team readiness.
Permit to work and isolation policy · 6 arrangements
- Permit issue, suspension, handover and cancellation procedure
Identify permit interfaces, competence, isolations, simultaneous operations and restoration.
- Permit register and simultaneous-operations board
Coordinate active permits, isolations, interfaces and shift handovers.
- General high-risk work permit
Document work boundary, prerequisites, controls, time validity and accountable release.
- Isolation certificate and lock register
Record energy source, isolation point, lock owner, verification and restoration.
- Permit suspension, handover and cancellation record
Control temporary stop, personnel/shift change and final safe handback.
- Permit-system audit and field verification
Test whether permits match actual site conditions and controls.
Traffic, logistics and public protection policy · 7 arrangements
- Traffic planning, delivery and public-interface procedure
Set routes and exclusion zones, coordinate deliveries, safe reversing and changing public interfaces.
- Traffic management and delivery logistics plan
Separate pedestrians/vehicles, control reversing, loading and route changes.
- Vehicle-pedestrian and public-interface assessment
Assess blind spots, vehicle movements, unloading and vulnerable users.
- Delivery, loading/unloading and reversing check
Verify space, driver instructions, restraint, exclusion and competent assistance.
- Traffic-route change and briefing record
Approve changed routes and communicate them to all affected parties.
- Boundary, public protection and neighbour-interface inspection
Check hoarding, overhead protection, dust/noise controls and access.
- Delivery unloading and materials distribution RAMS
Vehicle positioning, stability, exclusion, lifting and pedestrian interfaces.
Occupational health policy · 7 arrangements
- Health-risk referral, surveillance and fitness procedure
Identify surveillance needs, use competent providers, manage fitness advice and protect confidentiality.
- Occupational health risk and surveillance-needs assessment
Link actual exposures to prevention and appropriate surveillance.
- Health-surveillance appointment and fitness-action register
Track required surveillance and fitness recommendations with restricted access.
- Stress, fatigue, hours and workload assessment
Assess foreseeable psychosocial and fatigue risks and agree work-design controls.
- Return-to-work and reasonable task-adjustment record
Record agreed work adjustments and review without unnecessary diagnosis details.
- Heat, cold, UV and wellbeing prevention plan
Plan hydration, rest, clothing, scheduling and symptom escalation.
- Confidential health concern and referral route
Provide a clear route to competent help and urgent action where needed.
Personal protective equipment policy · 5 arrangements
- PPE selection, issue, care and replacement procedure
Match equipment to hazards and wearer, arrange fit testing where needed and replace defective equipment.
- Task and role PPE selection matrix
Specify hazard-linked suitable/compatible equipment and limitations.
- PPE issue, instruction and replacement record
Record provision, training, checks and timely replacement.
- PPE condition, compatibility and use check
Check fit, damage, compatibility and whether higher-level controls are functioning.
- Specialist PPE examination and defect record
Track competent checks where equipment or risk requires them.
Emergency response and first aid policy · 6 arrangements
- Emergency planning, drills and first-aid procedure
Assess needs, communicate access/rescue arrangements, exercise plans and replenish resources.
- First-aid needs assessment
Assess workforce, hazards, remoteness, shift cover and access to emergency care.
- Project emergency response and contact plan
Define actions for fire, collapse, service strike, medical event and other relevant scenarios.
- First-aider, equipment and cover register
Maintain competent cover and stocked equipment for every shift/site.
- Emergency drill and lesson record
Record realistic exercise, response gaps and verified improvements.
- Emergency readiness and first-aid stock check
Check contacts, access, alarm, equipment, supplies and accessible instructions.
Monitoring, audit and review policy · 7 arrangements
- Inspection, audit and performance-review procedure
Plan risk-based monitoring, record evidence, track findings and evaluate recurring weaknesses.
- Risk-based inspection and audit programme
Schedule assurance by risk, change and performance; distinguish statutory inspections.
- Supervisor daily safe-start and close-down check
Verify work-front controls, welfare, access and safe shutdown.
- Site management-system and control-effectiveness audit
Test implementation through observation, worker discussion and evidence sampling.
- Director safety visit and worker-engagement record
Record site leadership observations, worker concerns and commitments.
- Corrective/preventive action and effectiveness register
Assign risk-based actions, deadlines, escalation and evidence of durable closure.
- Performance and management-review input pack
Use leading/lagging indicators with meaningful denominators and narrative.
Incident investigation policy · 6 arrangements
- Incident response, statutory reporting and learning procedure
Make safe, preserve evidence, assess reportability and timescales, identify causes and verify action effectiveness.
- Immediate incident and near-miss notification
Capture factual circumstances, affected people, immediate controls and escalation.
- RIDDOR reportability and deadline decision checklist
Determine responsible person, report category, timing and submission evidence.
- Proportionate incident investigation report
Capture evidence, chronology, immediate/underlying/root causes and preventive action.
- Incident and statutory-report evidence register
Index incidents, report references, dates, classifications and restricted evidence.
- Lessons learned, communication and effectiveness review
Share appropriate learning and test whether controls improved.
Work near water and weather policy · 5 arrangements
- Water-edge protection and adverse-weather procedure
Assess changing water/weather conditions, establish rescue/access controls and communicate suspension triggers.
- Work-near-water and drowning-risk assessment
Evaluate avoidance, barriers, flotation, rescue and changing water conditions.
- Water rescue and recovery plan
Define suitable equipment, trained people, access and emergency arrangements.
- Weather, flood and ground-condition check
Apply project-specific suspension/restart triggers and inspections.
- Weather stop-work and restart authorisation
Record changed conditions, checks and competent release.
Office, display-screen and lone work policy · 6 arrangements
- Office/DSE assessment and lone-worker contact procedure
Assess workstations and isolated work, provide adjustments and test escalation arrangements.
- DSE workstation assessment
Assess qualifying workstation use and identify appropriate changes.
- Lone-working and violence-risk assessment
Assess isolation, communication, vulnerable locations and foreseeable aggression.
- Office and home-work environment check
Review access, fire, electrical, storage and general welfare risks.
- Lone-worker check-in and missed-contact escalation
Record contacts and proportionate escalation without unnecessary surveillance.
- DSE adjustment and eye-test request record
Track agreed equipment/work changes and applicable eye-test provision.
Driving and travel for work policy · 5 arrangements
- Driver authorisation, journey planning and vehicle-check procedure
Check licence/fitness and vehicle suitability, plan realistic journeys and manage defects/incidents.
- Driver authorisation and vehicle suitability check
Confirm appropriate entitlement, fitness, business use and vehicle arrangements.
- Journey, fatigue and load-security assessment
Assess travel timing, rest, weather, route and transported equipment.
- Vehicle pre-use and defect check
Check roadworthiness indicators and report/resolve defects.
- Driving incident and journey-plan review
Capture incidents and near misses and improve planning.
Specialist and high-hazard interfaces policy · 9 arrangements
- Specialist-work screening and escalation procedure
Determine legal triggers and specialist appointments before bidding, mobilisation or scope change.
- Specialist regime and client-site applicability screen
Screen for COMAH/client emergency rules, dangerous-goods transport, explosives, pressure systems, lead and ionising radiation.
- Specialist contractor and interface control plan
Require competent specialists, permits, design approvals and client/operator coordination.
- Lead and contaminated-coating work assessment
Assess lead exposure and the need for specialist controls, monitoring and medical surveillance.
- Pressure-system written-scheme and examination evidence index
Verify system scope, competent advice and examinations where the regime applies.
- Dangerous-goods movement and storage interface check
Screen classification, quantities, exemptions, packaging and competent transport arrangements.
- Specialist-work authorisation and hold-point record
Record evidence that relevant permits, competent appointments and prerequisites exist.
- Artificial optical radiation and EMF screening assessment
Screen exposure sources and determine competent assessment and additional controls.
- Compressed-air, diving, rail, highways and specialist-site scope screen
Identify activities needing additional legal mapping, specialist competence and authorisations before acceptance.
Gas safety and combustion equipment policy · 5 arrangements
- Gas-work authorisation and isolation procedure
Verify competent/registered specialists where required, isolate safely and obtain commissioning/handover evidence.
- Gas specialist and work-scope authorisation check
Verify qualifications/registration scope, method and client interfaces.
- LPG, temporary heating and gas-cylinder assessment
Control leaks, ventilation, ignition, storage and emergency response.
- Gas isolation, testing and handover evidence index
Index competent isolation, testing, commissioning and handover evidence.
- Gas appliance and cylinder condition check
Verify safe siting, protection, hose/regulator condition and controls.