Manual handling assessment and task planning procedure

BOUK-PRO-MAN · v1.0 · Completed fictional example · DOCX

Assess load, task, individual and environment; plan delivery/storage and team coordination.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

BOUK-PRO-MAN | Version 1.0 | 23 October 2026 | GB baseline

COMPLETED FICTIONAL EXAMPLE. BuildOut UK Ltd is an illustrative construction business. The arrangements and cases below are examples for adaptation; no actual work, approval or signature is represented.

Assess load, task, individual and environment; plan delivery/storage and team coordination.

Scope and operating responsibility

We apply this procedure to Plasterboard, glazing, bagged materials and awkward plant parts. Evidence includes Delivery and handling plan; task assessment; aid selection and inspection; worker consultation; modified-task review. The role controlling the task checks applicability before mobilisation and whenever the scope changes.

RoleRequired action
Site managerOwn this arrangement, confirm competent support and maintain its evidence trail.
Project manager and Site managerCoordinate the actual package, provide resources and verify prerequisites before release; resolve occupied and subcontractor interfaces.
Trade supervisor and workersUse the accepted current method, demonstrate understanding, report changes and stop when critical safeguards are uncertain.
Competent specialist and H&S adviserProvide technical advice within competence; challenge evidence and identify limitations. Management retains the operating decision.

Inputs before using the procedure

Use the current project risk register, relevant survey and design revisions, equipment or product information, worker consultation and the task-specific records listed below. Resolve conflicting or missing information before relying on it. Do not fill missing technical values from an example.

How we carry out the arrangement

1 Plan and obtain reliable information

Avoid hazardous handling of plasterboard, glazing, bagged materials and plant parts by delivery planning, suitable packaging, mechanical aids and design changes where practicable.

2 Verify capability and prerequisites

Assess the load, person, task, environment, grip, repetition, carrying route and installation position. A team lift or a weight label does not establish that the work is safe.

3 Control work and interfaces

The supervisor verifies access, storage, lifting aids, coordinated movement and the final placement step before starting. Changes to material size or route reopen the assessment.

4 Review change and safe handback

Workers help test workable arrangements and report discomfort early. Occupational-health or individual capability advice is used confidentially to adjust work.

Stop restrict and restart

Stop a handling task when the agreed aid, route, grip, staffing or placement control is missing, or the load or worker cannot be managed as assessed.

The person controlling the work makes the affected area safe and notifies the Site Manager. Restart requires the competent technical decision for the actual control, the authorised work-release decision and a fresh briefing of affected people. Record unresolved limits; an updated date or a completed form does not remove a hold.

Practical control detail

Delivery at the point of use, suitable mechanisation and a better route can remove handling. The remaining work includes picking, carrying, pushing and placing, not only one lift.

Check the whole movement with the intended aid, including delivery, storage, turns, thresholds and final placement. Confirm the equipment is suitable for the load and route, keep hands clear of trapping points and revise the method if the worker reports difficulty.

Evidence follow up and learning

Worked decision trail

Fictional situationDecision and evidence
What changesA plasterboard delivery is left beyond a narrow stair route.
ResponseThe supervisor postpones movement and reviews delivery position, mechanical aids and final placement with the team.
VerificationTrial the revised route safely with the intended aid and check the installation step, not only the initial lift.

Supporting arrangement documents

ReferenceHow the document is used
BOUK-RA-MAN-01
Manual handling task assessment
Evaluate task/load/environment/individual factors and practical alternatives.
BOUK-RAMS-MAN-01
Mechanical-aid and team-handling RAMS
Define aids, routes, communications, limits and safe staging.
BOUK-CHK-MAN-01
Storage, delivery and handling-route check
Reduce double handling, height/reach demands and poor access.
BOUK-FRM-MAN-01
Handling adjustment and discomfort follow-up
Record task changes and support after difficulty or symptoms.
BOUK-RAMS-MAN-02
Bricklaying and blockwork RAMS
Access platforms, load storage, handling, cutting dust and wet cement contact.

Retain the record ID, task, location, competent author, revision, date, decision, restrictions, action owner and separate effectiveness evidence. Restrict personal and health information and apply the relevant retention rule. File genuine results separately from teaching examples.

Guidance Manual handling

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.