BOUK-PRO-MAN | Version 1.0 | 23 October 2026 | GB baseline
COMPLETED FICTIONAL EXAMPLE. BuildOut UK Ltd is an illustrative construction business. The arrangements and cases below are examples for adaptation; no actual work, approval or signature is represented.
Assess load, task, individual and environment; plan delivery/storage and team coordination.
Scope and operating responsibility
We apply this procedure to Plasterboard, glazing, bagged materials and awkward plant parts. Evidence includes Delivery and handling plan; task assessment; aid selection and inspection; worker consultation; modified-task review. The role controlling the task checks applicability before mobilisation and whenever the scope changes.
| Role | Required action |
|---|---|
| Site manager | Own this arrangement, confirm competent support and maintain its evidence trail. |
| Project manager and Site manager | Coordinate the actual package, provide resources and verify prerequisites before release; resolve occupied and subcontractor interfaces. |
| Trade supervisor and workers | Use the accepted current method, demonstrate understanding, report changes and stop when critical safeguards are uncertain. |
| Competent specialist and H&S adviser | Provide technical advice within competence; challenge evidence and identify limitations. Management retains the operating decision. |
Inputs before using the procedure
Use the current project risk register, relevant survey and design revisions, equipment or product information, worker consultation and the task-specific records listed below. Resolve conflicting or missing information before relying on it. Do not fill missing technical values from an example.
How we carry out the arrangement
1 Plan and obtain reliable information
Avoid hazardous handling of plasterboard, glazing, bagged materials and plant parts by delivery planning, suitable packaging, mechanical aids and design changes where practicable.
2 Verify capability and prerequisites
Assess the load, person, task, environment, grip, repetition, carrying route and installation position. A team lift or a weight label does not establish that the work is safe.
3 Control work and interfaces
The supervisor verifies access, storage, lifting aids, coordinated movement and the final placement step before starting. Changes to material size or route reopen the assessment.
4 Review change and safe handback
Workers help test workable arrangements and report discomfort early. Occupational-health or individual capability advice is used confidentially to adjust work.
Stop restrict and restart
Stop a handling task when the agreed aid, route, grip, staffing or placement control is missing, or the load or worker cannot be managed as assessed.
The person controlling the work makes the affected area safe and notifies the Site Manager. Restart requires the competent technical decision for the actual control, the authorised work-release decision and a fresh briefing of affected people. Record unresolved limits; an updated date or a completed form does not remove a hold.
Practical control detail
Delivery at the point of use, suitable mechanisation and a better route can remove handling. The remaining work includes picking, carrying, pushing and placing, not only one lift.
Check the whole movement with the intended aid, including delivery, storage, turns, thresholds and final placement. Confirm the equipment is suitable for the load and route, keep hands clear of trapping points and revise the method if the worker reports difficulty.
Evidence follow up and learning
Worked decision trail
| Fictional situation | Decision and evidence |
|---|---|
| What changes | A plasterboard delivery is left beyond a narrow stair route. |
| Response | The supervisor postpones movement and reviews delivery position, mechanical aids and final placement with the team. |
| Verification | Trial the revised route safely with the intended aid and check the installation step, not only the initial lift. |
Supporting arrangement documents
| Reference | How the document is used |
|---|---|
| BOUK-RA-MAN-01 Manual handling task assessment | Evaluate task/load/environment/individual factors and practical alternatives. |
| BOUK-RAMS-MAN-01 Mechanical-aid and team-handling RAMS | Define aids, routes, communications, limits and safe staging. |
| BOUK-CHK-MAN-01 Storage, delivery and handling-route check | Reduce double handling, height/reach demands and poor access. |
| BOUK-FRM-MAN-01 Handling adjustment and discomfort follow-up | Record task changes and support after difficulty or symptoms. |
| BOUK-RAMS-MAN-02 Bricklaying and blockwork RAMS | Access platforms, load storage, handling, cutting dust and wet cement contact. |
Retain the record ID, task, location, competent author, revision, date, decision, restrictions, action owner and separate effectiveness evidence. Restrict personal and health information and apply the relevant retention rule. File genuine results separately from teaching examples.