Project CDM applicability and dutyholder checklist

BOUK-CHK-CDM-01 · v1.0 · Blank editable master · DOCX

Check project definition, client type, contractor count, appointments and notification threshold.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Check project definition, client type, contractor count, appointments and notification threshold. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Retail fit-out with several trades. Do not start construction without an adequate project-specific plan, confirmed dutyholder arrangements and the information and resources necessary for safe delivery.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Has the project scope and applicable jurisdiction been established?Yes No N/A
C02* Has the client type and actual contractor arrangement been confirmed?Yes No N/A
C03* Are required dutyholder appointments in place for the actual project?Yes No N/A
C04Has the responsible person checked the current F10 notification criteria?Yes No N/A
C05Is pre-construction information adequate for the planned work?Yes No N/A
C06Is a proportionate construction phase plan ready before construction starts?Yes No N/A
C07Are competence resources welfare and emergency arrangements verified?Yes No N/A
C08* Are unresolved information gaps linked to specific work holds?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

What are the Construction Design and Management Regulations?

What should a construction phase plan include?