BOUK-PRO-DEM | Version 1.0 | 23 October 2026 | GB baseline
COMPLETED FICTIONAL EXAMPLE. BuildOut UK Ltd is an illustrative construction business. The arrangements and cases below are examples for adaptation; no actual work, approval or signature is represented.
Obtain engineering/asbestos/service information, agree written arrangements and supervise sequence.
Scope and operating responsibility
We apply this procedure to Internal soft strip and structural wall removal. Evidence includes Survey and structural information; written sequence; temporary support; isolation; monitoring and exclusion checks; change and completion handover. The role controlling the task checks applicability before mobilisation and whenever the scope changes.
| Role | Required action |
|---|---|
| Project manager | Own this arrangement, confirm competent support and maintain its evidence trail. |
| Project manager and Site manager | Coordinate the actual package, provide resources and verify prerequisites before release; resolve occupied and subcontractor interfaces. |
| Trade supervisor and workers | Use the accepted current method, demonstrate understanding, report changes and stop when critical safeguards are uncertain. |
| Competent specialist and H&S adviser | Provide technical advice within competence; challenge evidence and identify limitations. Management retains the operating decision. |
Inputs before using the procedure
Use the current project risk register, relevant survey and design revisions, equipment or product information, worker consultation and the task-specific records listed below. Resolve conflicting or missing information before relying on it. Do not fill missing technical values from an example.
How we carry out the arrangement
1 Plan and obtain reliable information
The Project Manager obtains competent structural and services information, asbestos survey information and the required written demolition or alteration arrangements before disturbance.
2 Verify capability and prerequisites
The sequence maintains stability of the structure and adjacent areas, including temporary support, load paths and occupied boundaries. A removed wall or altered connection is not assumed non-structural.
3 Control work and interfaces
Isolation, dust control, waste handling, exclusion and access are coordinated through the work stages. Mechanical methods and plant are selected for the actual reach, loading and collapse conditions.
4 Review change and safe handback
An unexpected material, structural detail, live service or visible movement triggers withdrawal, restriction and competent redesign of the sequence.
Stop restrict and restart
Stop demolition or alteration at an unexplained structural condition, uncontrolled exposure, failed isolation, loss of exclusion or deviation from the accepted sequence.
The person controlling the work makes the affected area safe and notifies the Site Manager. Restart requires the competent technical decision for the actual control, the authorised work-release decision and a fresh briefing of affected people. Record unresolved limits; an updated date or a completed form does not remove a hold.
Practical control detail
A demolition stage can affect adjoining structures, debris loading and public access. A changed condition returns to competent review rather than an assumed next step.
Demolition should be planned as a construction project with competent duty holders, adequate information and a written safe system of work.
Evidence follow up and learning
Worked decision trail
| Fictional situation | Decision and evidence |
|---|---|
| What changes | Soft strip exposes an unexpected structural connection. |
| Response | Work stops at that stage; the structure is protected and competent structural advice revises the dismantling sequence. |
| Verification | Verify the revised support, isolation and exclusion before briefing and releasing the next stage. |
Supporting arrangement documents
| Reference | How the document is used |
|---|---|
| BOUK-PLN-DEM-01 Demolition / dismantling written arrangements | Set competent method, sequence, stability, exclusion, services, dust and emergency controls. |
| BOUK-CHK-DEM-01 Pre-demolition survey and services-isolation checklist | Verify structural, asbestos, hazardous materials and utility information before release. |
| BOUK-RAMS-DEM-01 Structural alteration and temporary-support RAMS | Control staged openings, propping, load paths and interface hold points. |
| BOUK-CHK-DEM-02 Demolition exclusion and stability inspection | Check boundaries, changing stability, debris and unplanned exposures. |
| BOUK-FRM-DEM-01 Demolition hold-point release and change record | Record engineer approval and re-assessment of unexpected conditions. |
| BOUK-RAMS-DEM-02 Soft strip and internal dismantling RAMS | Asbestos/service checks, stability, dust, sharps, handling and waste routes. |
Retain the record ID, task, location, competent author, revision, date, decision, restrictions, action owner and separate effectiveness evidence. Restrict personal and health information and apply the relevant retention rule. File genuine results separately from teaching examples.
Guidance Demolition and dismantling safety