ROUTINE FIRST-LINE CHECK
Blank editable checklist. Screen for COMAH/client emergency rules, dangerous-goods transport, explosives, pressure systems, lead and ionising radiation. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.
| Location and task | Checker and date |
|---|---|
| Site: ___________________ Area / asset: ___________________ | Checker: ___________________ Date: ___________ Shift: ___________ |
| Scope / approved criteria |
|---|
| Construction inside a fuel terminal or specialist industrial facility. Stop when operator permission, isolation, atmosphere, hazardous-area suitability, credited protection or emergency coordination is uncertain or impaired beyond the accepted arrangement. |
Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.
| Ref | Closed control question | One response |
|---|---|---|
| C01 | * Has the proposed specialist scope been screened before acceptance? | Yes No N/A |
| C02 | * Have client operator and relevant specialist regime interfaces been identified? | Yes No N/A |
| C03 | * Has competent applicability advice addressed uncertain triggers? | Yes No N/A |
| C04 | Are required appointments competence and notifications resolved? | Yes No N/A |
| C05 | Are designs permits and technical prerequisites available? | Yes No N/A |
| C06 | Are simultaneous work and emergency arrangements coordinated? | Yes No N/A |
| C07 | Are scope limits and work holds explicit? | Yes No N/A |
| C08 | * Is competent specialist handback required before return to normal use? | Yes No N/A |
| Yes | No | N/A | Score % |
|---|---|---|---|
Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.
Findings actions and review
Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.
| Check | Finding / N/A reason / immediate control | Action owner / required action | Due / evidence |
|---|---|---|---|
| Review field | Auditor or verifier entry |
|---|---|
| Checker name / signature / date | |
| Supervisor or verifier / date | |
| Restrictions / escalation / restart authority | |
| Verification / evidence / effectiveness | |
| Next routine check date | |
| Deeper review needed | Yes No |
| Offline photograph or evidence reference |
|---|
| Insert image or record evidence details here |
Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.
Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.