Plant and powered-tool pre-use inspection

BOUK-CHK-PLANT-01 · v1.0 · Blank editable master · DOCX

Identify damage, failed guards, interlocks, leaks and unsafe attachments.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Identify damage, failed guards, interlocks, leaks and unsafe attachments. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Guarded bench saw or excavator quick hitch. Withdraw equipment when a guard, safety device, attachment, inspection or operating condition is unsafe or uncertain; stop the affected task pending verification.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Is the asset attachment and accessory suitable for the actual task?Yes No N/A
C02* Is the user competent authorised and familiar with the equipment?Yes No N/A
C03* Are guards safety devices and permitted operating controls in their intended condition?Yes No N/A
C04Are visible structure connections cables hoses and attachments free of unsafe defects?Yes No N/A
C05Are required inspection maintenance and examination records applicable and current?Yes No N/A
C06Are dust noise vibration and nearby-person controls ready for use?Yes No N/A
C07Are isolation and safe access arrangements available for adjustment or maintenance?Yes No N/A
C08* Is safety-defective equipment withdrawn quarantined and prevented from use?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

Provision and Use of Work Equipment (PUWER)

Mobile plant and vehicles

Guards and Machinery Interlocks

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.