BOUK-PTW-PTW-01 | Version 1.0 | 23 October 2026 | GB baseline
BLANK EDITABLE MASTER. Record actual facts, evidence and decisions. Operational entries, signatures and approvals are blank.
Document work boundary, prerequisites, controls, time validity and accountable release.
| Record identity | Actual entry |
|---|---|
| Record reference and project | |
| Exact location task and date | |
| Recorder role and competence |
Scope facts and prerequisites
| Required information | Actual evidence or decision |
|---|---|
| Exact task system area and permit type | |
| Current assessment method and interface map | |
| Required isolations tests and competent evidence | |
| Protective measures rescue access and restrictions | |
| Authorised issuer and performing team |
Decisions handover and verification
Suspend the permit when the scope, operating state, isolation or other prerequisite changes or fails. Restart requires revalidation by the authorised roles.
| Required information | Actual evidence or decision |
|---|---|
| Validity duration shift and linked permits | |
| Acceptance and required monitoring | |
| Suspension change and revalidation | |
| Safe completion inspection and residual hazards | |
| Operating-authority acceptance and cancellation |
| Finding or action | Owner and due date | Evidence and effectiveness |
|---|---|---|
| Review and acceptance | Actual entry |
|---|---|
| Reviewer name role and date | |
| Required signatures and date | |
| Remaining restrictions and restart authority |
Retain factual evidence and limitations. A signature, permit or tick does not establish that the physical controls work. Use the separate procedure and the completed decision example for guidance; never copy an example as an actual result.