SHAREhub home

Welfare readiness and daily condition check

BOUK-CHK-WEL-01 · v1.0 · Blank editable master · DOCX

Verify toilets, washing, drinking water, changing and rest facilities are suitable and maintained.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Verify toilets, washing, drinking water, changing and rest facilities are suitable and maintained. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Running water, cleaning and drying facilities. Do not mobilise or continue an affected phase without required usable welfare, safe access, essential fire arrangements or effective separation from occupants and the public.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Are usable toilets sufficient for the actual workforce and shift?Yes No N/A
C02* Are suitable washing facilities water soap and drying supplies available?Yes No N/A
C03* Is drinking water accessible and maintained?Yes No N/A
C04Are required rest changing and drying arrangements usable?Yes No N/A
C05Are facilities cleaned serviced and supplied throughout work?Yes No N/A
C06Are safe lit accessible routes and relevant fire arrangements maintained?Yes No N/A
C07Are changed worker numbers occupation or welfare location reviewed?Yes No N/A
C08* Is affected work restricted when essential provision is absent or unusable?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

Health, Welfare and Work Environment

What should a construction phase plan include?

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.