BOUK-PTW-TW-01 | Version 1.0 | 23 October 2026 | GB baseline
BLANK EDITABLE MASTER. Record actual facts, evidence and decisions. Operational entries, signatures and approvals are blank.
Record competent release after prerequisites and hold points are satisfied.
| Record identity | Actual entry |
|---|---|
| Record reference and project | |
| Exact location task and date | |
| Recorder role and competence |
Scope facts and prerequisites
| Required information | Actual evidence or decision |
|---|---|
| Temporary works ID accepted design and revision | |
| Required design check and competent evidence | |
| Erection inspection and supporting ground | |
| Connections bracing loading and access conditions | |
| Outstanding defects and hold conditions |
Decisions handover and verification
Hold loading, alteration or dismantling when a design, check, foundation, bracing, connection or sequence requirement is uncertain or no longer met.
| Required information | Actual evidence or decision |
|---|---|
| Permitted loading use limits and sequence | |
| Competent release decision and user acceptance | |
| Inspection and change triggers | |
| Withdrawal or suspension and communication |
| Finding or action | Owner and due date | Evidence and effectiveness |
|---|---|---|
| Review and acceptance | Actual entry |
|---|---|
| Reviewer name role and date | |
| Required signatures and date | |
| Remaining restrictions and restart authority |
Retain factual evidence and limitations. A signature, permit or tick does not establish that the physical controls work. Use the separate procedure and the completed decision example for guidance; never copy an example as an actual result.