BOUK-PRO-SUB | Version 1.0 | 23 October 2026 | GB baseline
COMPLETED FICTIONAL EXAMPLE. BuildOut UK Ltd is an illustrative construction business. The arrangements and cases below are examples for adaptation; no actual work, approval or signature is represented.
Evaluate capability, agree responsibilities and RAMS, monitor performance and change subcontractors safely.
Scope and operating responsibility
We apply this procedure to Scaffolding, asbestos or demolition subcontractor. Evidence includes Package scope; capability assessment; procurement specification; mobilisation checks; monitoring findings; technical hand-back. The role controlling the task checks applicability before mobilisation and whenever the scope changes.
| Role | Required action |
|---|---|
| Contracts / operations manager | Own this arrangement, confirm competent support and maintain its evidence trail. |
| Project manager and Site manager | Coordinate the actual package, provide resources and verify prerequisites before release; resolve occupied and subcontractor interfaces. |
| Trade supervisor and workers | Use the accepted current method, demonstrate understanding, report changes and stop when critical safeguards are uncertain. |
| Competent specialist and H&S adviser | Provide technical advice within competence; challenge evidence and identify limitations. Management retains the operating decision. |
Inputs before using the procedure
Use the current project risk register, relevant survey and design revisions, equipment or product information, worker consultation and the task-specific records listed below. Resolve conflicting or missing information before relying on it. Do not fill missing technical values from an example.
How we carry out the arrangement
1 Plan and obtain reliable information
Contracts Managers specify the actual package risks and assess a subcontractor’s competence, organisational capability, resources, supervision and relevant previous performance. Insurance or an accreditation alone is insufficient.
2 Verify capability and prerequisites
Design responsibility, RAMS, specialist licences where applicable, plant suitability, inspection evidence and emergency interfaces are agreed before mobilisation. Subcontracting onward requires equivalent checks.
3 Control work and interfaces
The Site Manager coordinates simultaneous work, occupied boundaries, deliveries, isolations and permits, and observes compliance at the work front. Selection does not transfer Build Out’s coordination duties.
4 Review change and safe handback
Purchasing considers safe use, maintenance access, compatibility, exposure information and lifecycle costs. A substitution or changed package is reviewed before acceptance.
Stop restrict and restart
Hold appointment, delivery or work when necessary competence, safeguards, technical information or coordinated arrangements cannot be demonstrated.
The person controlling the work makes the affected area safe and notifies the Site Manager. Restart requires the competent technical decision for the actual control, the authorised work-release decision and a fresh briefing of affected people. Record unresolved limits; an updated date or a completed form does not remove a hold.
Practical control detail
Scope, capability, shared hazards, site method, monitored work and hand-back are connected decisions. A change of scope or subcontractor can reopen an earlier gate.
Use the contractor RAMS and any required permits to coordinate a verified method. The Site Manager checks the actual isolation, barriers and competent team at the workface before release; a contractor signature alone does not demonstrate those controls.
Evidence follow up and learning
Worked decision trail
| Fictional situation | Decision and evidence |
|---|---|
| What changes | A contractor proposes a different subcontractor for a safety-critical package. |
| Response | The Contracts Manager holds mobilisation while capability, supervision, scope and interfaces are reassessed. |
| Verification | Match the personnel and method at the workface to the accepted package evidence. |
Supporting arrangement documents
| Reference | How the document is used |
|---|---|
| BOUK-CHK-SUB-01 Contractor prequalification and capability review | Assess competence, resources, previous performance and scope-specific controls. |
| BOUK-FRM-SUB-01 Subcontractor scope and safety-interface agreement | Define supplied information, shared facilities, supervision and emergency responsibilities. |
| BOUK-CHK-SUB-02 Supplier and hired-equipment acceptance checklist | Verify specifications, operating instructions, inspection evidence and support. |
| BOUK-FRM-SUB-02 Contractor performance and escalation review | Record performance, recurring concerns and corrective actions. |
| BOUK-CHK-SUB-03 Material/product substitution safety review | Check changed hazards, installation method and compatibility before substitution. |
Retain the record ID, task, location, competent author, revision, date, decision, restrictions, action owner and separate effectiveness evidence. Restrict personal and health information and apply the relevant retention rule. File genuine results separately from teaching examples.
Guidance How should contractors and supply chains be managed safely? · Provision and Use of Work Equipment (PUWER)