BOUK-PRO-CONS | Version 1.0 | 23 October 2026 | GB baseline

COMPLETED FICTIONAL EXAMPLE. BuildOut UK Ltd is an illustrative construction business. The arrangements and cases below are examples for adaptation; no actual work, approval or signature is represented.

Plan consultation, record worker input and close out concerns with accessible communications.

Scope and operating responsibility

We apply this procedure to Monthly forum and daily trade coordination. Evidence includes Consultation plan; representative meetings; worker suggestions; response and feedback log; evidence that controls changed. The role controlling the task checks applicability before mobilisation and whenever the scope changes.

RoleRequired action
Competent health and safety adviserOwn this arrangement, confirm competent support and maintain its evidence trail.
Project manager and Site managerCoordinate the actual package, provide resources and verify prerequisites before release; resolve occupied and subcontractor interfaces.
Trade supervisor and workersUse the accepted current method, demonstrate understanding, report changes and stop when critical safeguards are uncertain.
Competent specialist and H&S adviserProvide technical advice within competence; challenge evidence and identify limitations. Management retains the operating decision.

Inputs before using the procedure

Use the current project risk register, relevant survey and design revisions, equipment or product information, worker consultation and the task-specific records listed below. Resolve conflicting or missing information before relying on it. Do not fill missing technical values from an example.

How we carry out the arrangement

1 Plan and obtain reliable information

The competent adviser and Site Manager provide meaningful consultation in good time on risk assessments, changed methods, equipment selection, welfare, training and major control decisions.

2 Verify capability and prerequisites

Daily briefings and trade coordination include direct employees, subcontractors and agency workers. Recognised representatives use the applicable consultation route, and workers can raise confidential concerns without adverse treatment.

3 Control work and interfaces

A supervisor records the issue, action owner, time for feedback and any immediate restriction. Urgent concerns are acted on at once, not deferred to the monthly forum.

4 Review change and safe handback

The manager checks whether the proposed control is practical with those doing the task and explains why a suggestion was adopted, modified or declined. Consultation does not transfer the employer’s duty to workers.

Stop restrict and restart

Stop affected work when a consultation report identifies an uncontrolled serious risk; resolve it before asking workers to continue.

The person controlling the work makes the affected area safe and notifies the Site Manager. Restart requires the competent technical decision for the actual control, the authorised work-release decision and a fresh briefing of affected people. Record unresolved limits; an updated date or a completed form does not remove a hold.

Practical control detail

Ask the people who do the job before approving a change, test the proposal at work and close the feedback loop.

Consultation needs a proposal people can understand, a usable representation route and a response that explains what changed. It is more than collecting attendance signatures.

Evidence follow up and learning

Worked decision trail

Fictional situationDecision and evidence
What changesA proposed delivery route crosses the break-area entrance.
ResponseWorkers identify the conflict before installation; the Site Manager changes the route and explains the decision to all shifts.
VerificationObserve a busy delivery and seek feedback from workers using the entrance.

Supporting arrangement documents

ReferenceHow the document is used
BOUK-PLN-CONS-01
Worker consultation and safety-meeting plan
Choose consultation routes and opportunities that reach employees and subcontractors.
BOUK-FRM-CONS-01
Safety representative and consultation meeting minutes
Record suggestions, decisions, unresolved concerns and agreed actions.
BOUK-FRM-CONS-02
Toolbox talk and worker-feedback record
Capture topic, attendance, understanding and feedback without equating attendance with competence.
BOUK-FRM-CONS-03
Hazard, good-catch and improvement suggestion report
Enable workers to raise practical issues and receive feedback.

Retain the record ID, task, location, competent author, revision, date, decision, restrictions, action owner and separate effectiveness evidence. Restrict personal and health information and apply the relevant retention rule. File genuine results separately from teaching examples.

Guidance How should workplaces consult and engage workers?

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.