Temporary works erection/conformance inspection

BOUK-CHK-TW-01 · v1.0 · Blank editable master · DOCX

Verify constructed work matches design and required inspections.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Verify constructed work matches design and required inspections. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Falsework and support foundations before concreting. Hold loading, alteration or dismantling when a design, check, foundation, bracing, connection or sequence requirement is uncertain or no longer met.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Is the actual temporary works item matched to the accepted design revision?Yes No N/A
C02* Are design assumptions ground and supporting conditions verified?Yes No N/A
C03* Do installed connections bracing dimensions and materials conform within the competent acceptance criteria?Yes No N/A
C04Are required design checks and competent inspections evidenced?Yes No N/A
C05Are loading access and exclusion restrictions implemented at the workface?Yes No N/A
C06Are imposed loads and adjacent work within the accepted basis?Yes No N/A
C07Are weather impact movement and alteration triggers monitored?Yes No N/A
C08* Is loading use alteration or dismantling held when the accepted condition is uncertain?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

Foundations of Construction Health and Safety Management

Scaffolding Safety

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.