SHAREhub home

Supplier and hired-equipment acceptance checklist

BOUK-CHK-SUB-02 · v1.0 · Blank editable master · DOCX

Verify specifications, operating instructions, inspection evidence and support.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Verify specifications, operating instructions, inspection evidence and support. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Hired MEWP with maintenance and examination information. Hold appointment, delivery or work when necessary competence, safeguards, technical information or coordinated arrangements cannot be demonstrated.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Does the supplied product or hired equipment match the accepted specification?Yes No N/A
C02* Is it suitable for the intended task environment and configuration?Yes No N/A
C03* Are instructions limitations and relevant safety information supplied?Yes No N/A
C04Are condition safeguards accessories and compatibility verified at receipt?Yes No N/A
C05Are required inspection maintenance or examination records applicable and current?Yes No N/A
C06Are competent user familiarisation maintenance and defect routes agreed?Yes No N/A
C07Are delivery installation storage and handover interfaces controlled?Yes No N/A
C08* Is unsuitable or unsupported supply quarantined rather than accepted into use?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

How should contractors and supply chains be managed safely?

Provision and Use of Work Equipment (PUWER)

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.