Determine whether additional building-safety appointments, controls and approvals require specialist review.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Determine whether additional building-safety appointments, controls and approvals require specialist review. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Residential refurbishment with possible higher-risk-building status. Hold procurement, fabrication or construction when a design assumption, capacity, support condition, lifting point or significant residual risk is unresolved. Site convenience does not authorise a design alteration.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Have project nation premises and building scope been confirmed?Yes No N/A
C02* Has a competent person identified applicable building-control duties?Yes No N/A
C03* Have higher-risk-building criteria been assessed using current official guidance?Yes No N/A
C04Are dutyholder appointments and competence routes confirmed?Yes No N/A
C05Are required submissions approvals and evidence available before the affected stage?Yes No N/A
C06Are design changes and safety-critical information controlled?Yes No N/A
C07Are occupied-building fire and information interfaces coordinated?Yes No N/A
C08* Are unresolved regulatory or design prerequisites recorded as work holds?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

What are the Construction Design and Management Regulations?

Foundations of Construction Health and Safety Management

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.