ROUTINE FIRST-LINE CHECK
Blank editable checklist. Verify the agreed plan, competent team, load path and equipment before lifting. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.
| Location and task | Checker and date |
|---|---|
| Site: ___________________ Area / asset: ___________________ | Checker: ___________________ Date: ___________ Shift: ___________ |
| Scope / approved criteria |
|---|
| Tandem or blind lift hold-point check. Stop a lift when load information, ground capacity, accessory suitability, communication, exclusion or a critical condition differs from the accepted plan. |
Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.
| Ref | Closed control question | One response |
|---|---|---|
| C01 | * Does the competent lift plan match the actual load equipment and configuration? | Yes No N/A |
| C02 | * Are load mass lifting points and landing support verified? | Yes No N/A |
| C03 | * Is ground and supporting-structure capacity accepted for the installed position? | Yes No N/A |
| C04 | Are equipment accessories and examination or inspection evidence suitable and current? | Yes No N/A |
| C05 | Are competent roles signalling and communication agreed? | Yes No N/A |
| C06 | Are exclusion public interfaces access and adjacent services controlled? | Yes No N/A |
| C07 | Are weather and operating conditions within the accepted plan's limits? | Yes No N/A |
| C08 | * Is the lift held if any critical plan condition changes or cannot be verified? | Yes No N/A |
| Yes | No | N/A | Score % |
|---|---|---|---|
Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.
Findings actions and review
Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.
| Check | Finding / N/A reason / immediate control | Action owner / required action | Due / evidence |
|---|---|---|---|
| Review field | Auditor or verifier entry |
|---|---|
| Checker name / signature / date | |
| Supervisor or verifier / date | |
| Restrictions / escalation / restart authority | |
| Verification / evidence / effectiveness | |
| Next routine check date | |
| Deeper review needed | Yes No |
| Offline photograph or evidence reference |
|---|
| Insert image or record evidence details here |
Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.
Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.