Blank editable audit tool. Test implementation through observation, worker discussion and evidence sampling. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.
Complete this form against the actual work observed. Record samples, answers and evidence; assign each gap to a corrective action.
| Audit details and document control | |||
|---|---|---|---|
| Site or workplace | Click here to enter details | Audit reference | Enter local reference |
| Assessor | Enter name and role | Date | Enter date |
| Organisation or client | Enter organisation | Template version | 1.0 |
| Account context | Individual | Jurisdiction | Great Britain baseline; confirm the project nation and applicable requirements |
| Scope and criteria | RAMS practical use, isolation, excavation and dust controls. Escalate a failed critical control immediately and restrict affected work; an acceptable overall inspection score cannot overrule that failure. | Review status | Blank template for tailoring |
How to complete the offline audit
Tick or initial one response box for each check. Enter observations in the table and use the check reference when recording actions or evidence. Explain every not-applicable answer. Record the task, shift, asset or document sampled, sample size and limitations.
For offline use, double click the top of the page and insert your company logo in the header. Cells expand as you type. Add rows with Word table controls. Insert photographs inline in an observation cell or evidence sheet and keep each image inside the cell width. Duplicate the evidence and action sheets when more space is needed.
Yes = 2; partial = 1; no = 0. Not applicable is excluded with a reason. Unanswered questions remain incomplete. Scores are not certification of safety or legal compliance. Escalate immediate danger without waiting for the audit to finish.
Great Britain baseline. Confirm local fire, environmental and sector criteria. Northern Ireland has separate legislation.
Sampling and audit boundaries
| Field | Record details |
|---|---|
| Activities assets and shifts sampled | Click here to enter details |
| Documents and people consulted | Click here to enter details |
| Sample size and selection method | Click here to enter details |
| Excluded areas and limitations | Click here to enter details |
Checklist section index
28 checks across 7 sections. Use the heading navigation or check reference to return to a section.
Management and competence | C001 to C004
CDM planning and information | C005 to C008
Site and high-risk controls | C009 to C012
Construction health controls | C013 to C016
Audit planning, sampling and follow-up | C017 to C020
Contractor selection and work coordination | C021 to C024
Incident reporting, investigation and learning | C025 to C028
Management and competence
| Check and evidence to examine | Response | Observations and evidence references |
|---|---|---|
| C001 Are responsibilities and escalation routes clear for the activities being sampled? Evidence prompt: Interview a supervisor and compare the answer with current responsibilities. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C002 Do task risk assessments and safe working methods reflect work as it is actually carried out? Evidence prompt: Sample a current task, its assessment and the worker briefing. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C003 Can workers and contractors demonstrate the competence and induction needed for their tasks? Evidence prompt: Sample recent starters, contractors and a training record; do not rely on a card alone. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C004 Have previous findings been followed up and their controls checked for effectiveness? Evidence prompt: Trace a previous action from finding through implementation to verification. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
CDM planning and information
| Check and evidence to examine | Response | Observations and evidence references |
|---|---|---|
| C005 Are the applicable client, designer and contractor roles identified and appointments recorded where required? Evidence prompt: Review the project arrangements and confirm the actual dutyholder interfaces. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C006 Is pre-construction information relevant and available to those planning the work? Evidence prompt: Sample services, asbestos, ground, design and existing-structure information. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C007 Does the construction phase plan address current activities, changes and coordination? Evidence prompt: Compare the plan with work today, subcontractor interfaces and emergency arrangements. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C008 Are briefings, competence checks and notification requirements addressed for this project? Evidence prompt: Sample inductions and task briefings; check F10 applicability rather than assuming every project is notifiable. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
Site and high-risk controls
| Check and evidence to examine | Response | Observations and evidence references |
|---|---|---|
| C009 Are work-at-height risks avoided where possible and suitable protection and rescue arrangements in place? Evidence prompt: Observe the task, access equipment, edge protection, inspection and rescue arrangements. Critical control — contain and escalate failure immediately | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C010 Are excavations, buried services and ground conditions controlled before and during work? Evidence prompt: Sample service information, locating, excavation support, access and competent inspections. Critical control — contain and escalate failure immediately | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C011 Are lifting operations, mobile plant and pedestrian interfaces planned and controlled? Evidence prompt: Compare the lift or traffic plan with the live operation, people and equipment. Critical control — contain and escalate failure immediately | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C012 Are temporary works, structural changes and other high-risk interfaces managed by competent authorised people? Evidence prompt: Trace design information, checks, authorisation and changes for one applicable activity. Critical control — contain and escalate failure immediately | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
Construction health controls
| Check and evidence to examine | Response | Observations and evidence references |
|---|---|---|
| C013 Are dust and fume controls effective at the point of generation? Evidence prompt: Observe cutting, drilling or a relevant task; verify extraction or suppression and housekeeping. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C014 Are noise and vibration exposures assessed using representative work and controlled? Evidence prompt: Sample exposure estimates, tool choice, work duration and health surveillance arrangements. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C015 Are manual handling and repetitive work risks reduced through task design and suitable aids? Evidence prompt: Observe a handling task and discuss the practical method with workers. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C016 Are weather, lighting and shift conditions reflected in the current work plan? Evidence prompt: Check heat, cold, wind, wet conditions and adequate task lighting. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
Audit planning, sampling and follow-up
| Check and evidence to examine | Response | Observations and evidence references |
|---|---|---|
| C017 Is the audit scope explicit about locations, tasks, shifts, contractors and activities excluded? Evidence prompt: Record the boundaries, applicable GB or other jurisdiction and any specialist audits required; compare with the site activity list. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C018 Are the criteria current, applicable and linked to actual risk controls rather than a generic score? Evidence prompt: Sample legislation, risk assessments, manufacturer instructions and site standards; record document versions and explain conflicting criteria. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C019 Does the sampling plan cover routine work, maintenance, breakdowns and credible abnormal conditions? Evidence prompt: Select assets, tasks and shifts by risk; record sample size, identifiers and limitations rather than claiming full coverage. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C020 Is the assessor competent for the hazards and sufficiently independent of the activity being audited? Evidence prompt: Check relevant practical experience, technical support and any conflicts; arrange a specialist where the assessor cannot judge a critical control. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
Contractor selection and work coordination
| Check and evidence to examine | Response | Observations and evidence references |
|---|---|---|
| C021 Is contractor selection based on competence and capacity for the actual work? Evidence prompt: Sample tender or appointment evidence, relevant experience, resources and risk performance; avoid relying on accreditation alone. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C022 Are responsibilities, scope and interfaces agreed before work starts? Evidence prompt: Review contracts, dutyholder roles, supervision, shared equipment and emergency arrangements with the site and contractor. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C023 Is relevant site information provided in time to plan safe methods? Evidence prompt: Check services, asbestos, access, live operations and restricted areas against the contractor's method and risk assessment. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C024 Are contractor assessments and methods reviewed for site-specific hazards and practicability? Evidence prompt: Compare approved documents with the actual team, task and work area; challenge copied generic methods. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
Incident reporting, investigation and learning
| Check and evidence to examine | Response | Observations and evidence references |
|---|---|---|
| C025 Are injuries, ill health, near misses and dangerous occurrences reported through accessible routes? Evidence prompt: Sample workers and recent reports; check contractors, remote work and reporting without blame. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C026 Are immediate response and scene-control arrangements proportionate to the event? Evidence prompt: Review rescue, first aid, isolation, preservation of evidence and escalation while prioritising people's safety. Critical control — contain and escalate failure immediately | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C027 Are statutory reporting decisions made promptly using the applicable criteria? Evidence prompt: Sample relevant incidents and documented RIDDOR decisions, deadlines and responsible roles; do not assume every accident is reportable. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
| C028 Are investigations proportionate and conducted by competent people? Evidence prompt: Check independence, expertise, worker involvement and investigation terms for a recent significant event. | Yes Partial No N/A | Observation / N/A reason: Evidence or photo ref: Action ref: |
Findings and corrective actions
Link each finding to its check reference. Record containment, the required action, a named owner and due date. Closure requires evidence and an effectiveness check.
| Action A001 | |
|---|---|
| Check reference and finding | Check ref: Finding: |
| Immediate control | Enter containment and who authorised it |
| Required action | Enter action and intended outcome |
| Owner and contact | Name: Contact: |
| Due date priority and status | Due: Priority: Status: |
| Completion evidence | Evidence ref: Completed by / date: |
| Verification and effectiveness | Verifier: Date: Outcome / reopening: |
| Action A002 | |
|---|---|
| Check reference and finding | Check ref: Finding: |
| Immediate control | Enter containment and who authorised it |
| Required action | Enter action and intended outcome |
| Owner and contact | Name: Contact: |
| Due date priority and status | Due: Priority: Status: |
| Completion evidence | Evidence ref: Completed by / date: |
| Verification and effectiveness | Verifier: Date: Outcome / reopening: |
| Action A003 | |
|---|---|
| Check reference and finding | Check ref: Finding: |
| Immediate control | Enter containment and who authorised it |
| Required action | Enter action and intended outcome |
| Owner and contact | Name: Contact: |
| Due date priority and status | Due: Priority: Status: |
| Completion evidence | Evidence ref: Completed by / date: |
| Verification and effectiveness | Verifier: Date: Outcome / reopening: |
| Action A004 | |
|---|---|
| Check reference and finding | Check ref: Finding: |
| Immediate control | Enter containment and who authorised it |
| Required action | Enter action and intended outcome |
| Owner and contact | Name: Contact: |
| Due date priority and status | Due: Priority: Status: |
| Completion evidence | Evidence ref: Completed by / date: |
| Verification and effectiveness | Verifier: Date: Outcome / reopening: |
Photographic evidence and additional detail
Duplicate this sheet for each image or supporting record. Link the evidence to a check or action. Add a caption describing what the image shows and why it supports the finding. Keep photographs inline and proportional.
Evidence sheet 1
| Evidence sheet 1 | |
|---|---|
| Evidence and check reference | Evidence ref: Check / action ref: |
| Location asset and date | Location / asset: Taken by / date: |
| Insert photograph or supporting image here Select this cell then Insert > Pictures. Resize within the cell. | |
| Caption and factual observation | Enter what is visible and its relevance to the finding |
| Further detail or record reference | Enter measurements, document references and limitations |
Evidence sheet 2
| Evidence sheet 2 | |
|---|---|
| Evidence and check reference | Evidence ref: Check / action ref: |
| Location asset and date | Location / asset: Taken by / date: |
| Insert photograph or supporting image here Select this cell then Insert > Pictures. Resize within the cell. | |
| Caption and factual observation | Enter what is visible and its relevance to the finding |
| Further detail or record reference | Enter measurements, document references and limitations |
Review and sign off
| Review field | Review and approval record |
|---|---|
| Assessor review | Name: Signature: Date: |
| Outstanding critical controls | Record restrictions, escalation and authority for restart |
| Verifier and closure decision | Name: Signature: Date: Decision: |
| Follow up review | Review date: Scope and effectiveness checks: |