SHAREhub home

Project and visitor induction checklist

BOUK-CHK-COMP-02 · v1.0 · Blank editable master · DOCX

Explain site rules, hazards, welfare, emergency routes and reporting.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Explain site rules, hazards, welfare, emergency routes and reporting. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
New joiner on live refurbishment project. Do not allocate unsupervised work when competence or authority is uncertain; maintain a supervised learning arrangement or appoint a competent alternative.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Has the person received an induction suited to their actual role and visit?Yes No N/A
C02* Are current work boundaries public routes and prohibited areas explained?Yes No N/A
C03* Are welfare first-aid alarm and evacuation arrangements understood?Yes No N/A
C04Are significant site hazards and survey uncertainties communicated?Yes No N/A
C05Are permit reporting and stop-work routes clear?Yes No N/A
C06Are language literacy accessibility and individual support needs addressed?Yes No N/A
C07Has practical understanding been checked rather than attendance alone?Yes No N/A
C08* Are uninducted visitors accompanied and workers restricted from unbriefed tasks?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

How should competence, training, information and supervision be managed?

Young Worker

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.