Housekeeping, access and storage inspection

BOUK-CHK-WEL-02 · v1.0 · Blank editable master · DOCX

Control slips, trips, waste, stacking and blocked routes.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Control slips, trips, waste, stacking and blocked routes. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Trailing leads and stored plasterboard on a fit-out floor. Do not mobilise or continue an affected phase without required usable welfare, safe access, essential fire arrangements or effective separation from occupants and the public.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Are walking working and escape routes clear of stored items and trailing services?Yes No N/A
C02* Are surfaces lighting and changes of level safe for current use?Yes No N/A
C03* Are materials stacked supported and restrained within assessed limits?Yes No N/A
C04Are storage loads openings and falling-object risks controlled?Yes No N/A
C05Are waste and combustible accumulations removed through safe routes?Yes No N/A
C06Are hazardous products segregated labelled and stored under the assessment?Yes No N/A
C07Are public and vehicle interfaces protected during deliveries and layout changes?Yes No N/A
C08* Are defects and unsafe storage restricted assigned and rechecked before continued use?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

Health, Welfare and Work Environment

What should a construction phase plan include?

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.