ROUTINE FIRST-LINE CHECK
Blank editable checklist. Prevent unauthorised access and keep visitors supervised and informed. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.
| Location and task | Checker and date |
|---|---|
| Site: ___________________ Area / asset: ___________________ | Checker: ___________________ Date: ___________ Shift: ___________ |
| Scope / approved criteria |
|---|
| Children gaining access to an unattended site. Do not mobilise or continue an affected phase without required usable welfare, safe access, essential fire arrangements or effective separation from occupants and the public. |
Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.
| Ref | Closed control question | One response |
|---|---|---|
| C01 | * Are the boundary and entry points secure for current work? | Yes No N/A |
| C02 | * Are visitors authorised accompanied and informed of site risks? | Yes No N/A |
| C03 | * Are public and vulnerable-person interfaces physically controlled? | Yes No N/A |
| C04 | Are signs accurate legible and consistent with the actual route? | Yes No N/A |
| C05 | Are emergency exits and responder access usable? | Yes No N/A |
| C06 | Are materials plant and hazardous areas secured from unauthorised access? | Yes No N/A |
| C07 | Are temporary boundary changes inspected and briefed? | Yes No N/A |
| C08 | * Are security defects restricted and assigned for correction? | Yes No N/A |
| Yes | No | N/A | Score % |
|---|---|---|---|
Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.
Findings actions and review
Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.
| Check | Finding / N/A reason / immediate control | Action owner / required action | Due / evidence |
|---|---|---|---|
| Review field | Auditor or verifier entry |
|---|---|
| Checker name / signature / date | |
| Supervisor or verifier / date | |
| Restrictions / escalation / restart authority | |
| Verification / evidence / effectiveness | |
| Next routine check date | |
| Deeper review needed | Yes No |
| Offline photograph or evidence reference |
|---|
| Insert image or record evidence details here |
Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.
Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.