BOUK-PTW-ELEC-01 | Version 1.0 | 23 October 2026 | GB baseline
BLANK EDITABLE MASTER. Record actual facts, evidence and decisions. Operational entries, signatures and approvals are blank.
Identify isolation points, prove dead, lock off and control reinstatement.
| Record identity | Actual entry |
|---|---|
| Record reference and project | |
| Exact location task and date | |
| Recorder role and competence |
Scope facts and prerequisites
| Required information | Actual evidence or decision |
|---|---|
| Exact circuit equipment and task | |
| Linked assessment method and competent electrical authority | |
| All energy sources and isolation points | |
| Securing proving safe and verification evidence | |
| Residual or adjacent live hazards and protected boundary |
Decisions handover and verification
Do not use or work on a supply of uncertain identity, isolation or condition. Keep clear of damaged live equipment and use the project emergency arrangements.
| Required information | Actual evidence or decision |
|---|---|
| Permitted team duration and operating conditions | |
| Issuer and performing-person acceptance time | |
| Suspension change expiry and handover | |
| Personnel tools guards and final verification | |
| Controlled re-energisation authorisation and cancellation |
| Finding or action | Owner and due date | Evidence and effectiveness |
|---|---|---|
| Review and acceptance | Actual entry |
|---|---|
| Reviewer name role and date | |
| Required signatures and date | |
| Remaining restrictions and restart authority |
Retain factual evidence and limitations. A signature, permit or tick does not establish that the physical controls work. Use the separate procedure and the completed decision example for guidance; never copy an example as an actual result.
Guidance Electrical control measures, safe systems and inspection · Isolation, Lockout and Line Breaking