Electrical isolation and re-energisation permit

BOUK-PTW-ELEC-01 · v1.0 · Blank editable master · DOCX

Identify isolation points, prove dead, lock off and control reinstatement.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

BOUK-PTW-ELEC-01 | Version 1.0 | 23 October 2026 | GB baseline

BLANK EDITABLE MASTER. Record actual facts, evidence and decisions. Operational entries, signatures and approvals are blank.

Identify isolation points, prove dead, lock off and control reinstatement.

Record identityActual entry
Record reference and project
Exact location task and date
Recorder role and competence

Scope facts and prerequisites

Required informationActual evidence or decision
Exact circuit equipment and task
Linked assessment method and competent electrical authority
All energy sources and isolation points
Securing proving safe and verification evidence
Residual or adjacent live hazards and protected boundary

Decisions handover and verification

Do not use or work on a supply of uncertain identity, isolation or condition. Keep clear of damaged live equipment and use the project emergency arrangements.

Required informationActual evidence or decision
Permitted team duration and operating conditions
Issuer and performing-person acceptance time
Suspension change expiry and handover
Personnel tools guards and final verification
Controlled re-energisation authorisation and cancellation
Finding or actionOwner and due dateEvidence and effectiveness
Review and acceptanceActual entry
Reviewer name role and date
Required signatures and date
Remaining restrictions and restart authority

Retain factual evidence and limitations. A signature, permit or tick does not establish that the physical controls work. Use the separate procedure and the completed decision example for guidance; never copy an example as an actual result.

Guidance Electrical control measures, safe systems and inspection · Isolation, Lockout and Line Breaking

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.