ROUTINE FIRST-LINE CHECK
Blank editable checklist. Determine responsible person, report category, timing and submission evidence. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.
| Location and task | Checker and date |
|---|---|
| Site: ___________________ Area / asset: ___________________ | Checker: ___________________ Date: ___________ Shift: ___________ |
| Scope / approved criteria |
|---|
| Over-seven-day incapacity, specified injury, dangerous occurrence or diagnosed reportable disease. Do not restart the affected activity until the responsible technical and operating authorities have accepted the controls, remaining restrictions and evidence. |
Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.
| Ref | Closed control question | One response |
|---|---|---|
| C01 | * Have the work-related facts and person category been established? | Yes No N/A |
| C02 | * Has the responsible reporting person been identified? | Yes No N/A |
| C03 | * Has the correct GB or NI reporting regime been selected? | Yes No N/A |
| C04 | Have injury disease dangerous-occurrence and relevant gas categories been checked? | Yes No N/A |
| C05 | Has the applicable notification and report deadline been recorded from current official guidance? | Yes No N/A |
| C06 | Are uncertainties assigned for prompt competent review without delaying a required report? | Yes No N/A |
| C07 | Is actual submission evidence retained if a report is required? | Yes No N/A |
| C08 | * Are incident records investigation learning and follow-up arrangements maintained separately? | Yes No N/A |
| Yes | No | N/A | Score % |
|---|---|---|---|
Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.
Findings actions and review
Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.
| Check | Finding / N/A reason / immediate control | Action owner / required action | Due / evidence |
|---|---|---|---|
| Review field | Auditor or verifier entry |
|---|---|
| Checker name / signature / date | |
| Supervisor or verifier / date | |
| Restrictions / escalation / restart authority | |
| Verification / evidence / effectiveness | |
| Next routine check date | |
| Deeper review needed | Yes No |
| Offline photograph or evidence reference |
|---|
| Insert image or record evidence details here |
Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.
Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.
HSE When do I need to report an incident