Permit-system audit and field verification

BOUK-CHK-PTW-01 · v1.0 · Blank editable master · DOCX

Test whether permits match actual site conditions and controls.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Test whether permits match actual site conditions and controls. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Verify isolation at point of work rather than paperwork alone. Suspend the permit when the scope, operating state, isolation or other prerequisite changes or fails. Restart requires revalidation by the authorised roles.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Does the sampled permit define the actual task system boundary and authorised roles?Yes No N/A
C02* Are assessment method isolations tests and technical prerequisites traceable to evidence?Yes No N/A
C03* Do the physical controls match the permit conditions at the workface?Yes No N/A
C04Are simultaneous permits and affected trades coordinated?Yes No N/A
C05Are validity monitoring and suspension triggers understood?Yes No N/A
C06Are shift handover and changed conditions controlled through revalidation?Yes No N/A
C07Does handback verify people equipment safeguards and the receiving authority's acceptance?Yes No N/A
C08* Are ineffective permits suspended and findings followed through to verified improvement?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

Permit-to-work Systems

Isolation, Lockout and Line Breaking

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.