SHAREhub home

Gas specialist and work-scope authorisation check

BOUK-CHK-GAS-01 · v1.0 · Blank editable master · DOCX

Verify qualifications/registration scope, method and client interfaces.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Verify qualifications/registration scope, method and client interfaces. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Gas pipework alteration in commercial premises. Stop affected work at an unidentified service, suspected leak, uncertain isolation, unsuitable combustion appliance or unresolved ventilation/exhaust control; follow the gas emergency arrangement.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Is the exact gas appliance system and work scope identified?Yes No N/A
C02* Has competent advice confirmed applicable registration requirements?Yes No N/A
C03* Is the actual business and engineer registration scope suitable where required?Yes No N/A
C04Is relevant task competence demonstrated beyond a generic certificate?Yes No N/A
C05Are isolation ventilation flue and combustion interfaces assessed?Yes No N/A
C06Are client permits occupied boundaries and emergency arrangements agreed?Yes No N/A
C07Are testing commissioning and handover evidence required from the competent specialist?Yes No N/A
C08* Is gas work held if competence identity scope or a critical prerequisite is unresolved?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

Gas Safety at Work

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.