COMPLETED FICTIONAL EXAMPLE. BuildOut UK Ltd is an illustrative construction business. The arrangements and cases below are examples for adaptation; no actual work, approval or signature is represented.
Assess workstations and isolated work, provide adjustments and test escalation arrangements.
Scope and operating responsibility
We apply this procedure to Office, home or temporary-site-office computer work. Evidence includes DSE assessment and adjustments; eye-test arrangement; lone-work risk assessment; check-in and escalation tests; change review. The role controlling the task checks applicability before mobilisation and whenever the scope changes.
| Role | Required action |
|---|---|
| People / training coordinator | Own this arrangement, confirm competent support and maintain its evidence trail. |
| Project manager and Site manager | Coordinate the actual package, provide resources and verify prerequisites before release; resolve occupied and subcontractor interfaces. |
| Trade supervisor and workers | Use the accepted current method, demonstrate understanding, report changes and stop when critical safeguards are uncertain. |
| Competent specialist and H&S adviser | Provide technical advice within competence; challenge evidence and identify limitations. Management retains the operating decision. |
Inputs before using the procedure
Use the current project risk register, relevant survey and design revisions, equipment or product information, worker consultation and the task-specific records listed below. Resolve conflicting or missing information before relying on it. Do not fill missing technical values from an example.
How we carry out the arrangement
1 Plan and obtain reliable information
People / training coordinator and the manager assess office, home and temporary site-office workstations and the actual work pattern, including shared desks, portable equipment, eyesight needs and work organisation.
2 Verify capability and prerequisites
Suitable equipment, layout, lighting and activity changes address posture, visual demands and fatigue. DSE users receive information and the applicable eye-test arrangement; a single fixed break timetable is not imposed as a universal rule.
3 Control work and interfaces
Lone working is assessed separately for access, violence, medical emergency, location and means of assistance. Check-in, escalation and welfare arrangements are agreed and tested before lone work.
4 Review change and safe handback
The manager reviews the workstation and contact arrangements after a location, workload, equipment or individual-needs change. Confidential health information is restricted to those who need it.
Stop restrict and restart
Do not authorise lone work that depends on unavailable communication or assistance, or a task whose assessed risks require more than one capable person.
The person controlling the work makes the affected area safe and notifies the Site Manager. Restart requires the competent technical decision for the actual control, the authorised work-release decision and a fresh briefing of affected people. Record unresolved limits; an updated date or a completed form does not remove a hold.
Practical control detail
A DSE risk register should record the real causes of discomfort and the evidence that workstation risks are being controlled.
Screen/viewing, inputs/reach, chair/support, lighting and activity variation interact. A diagram is a set of assessment prompts, not a perfect posture prescription.
Evidence follow up and learning
Worked decision trail
| Fictional situation | Decision and evidence |
|---|---|
| What changes | A lone worker misses an agreed contact after a location change. |
| Response | The responsible contact follows the agreed escalation without sending an unprepared person into danger. |
| Verification | Review the location information, communications and escalation test with the worker. |
Supporting arrangement documents
| Reference | How the document is used |
|---|---|
| BOUK-RA-OFF-01 DSE workstation assessment | Assess qualifying workstation use and identify appropriate changes. |
| BOUK-RA-OFF-02 Lone-working and violence-risk assessment | Assess isolation, communication, vulnerable locations and foreseeable aggression. |
| BOUK-CHK-OFF-01 Office and home-work environment check | Review access, fire, electrical, storage and general welfare risks. |
| BOUK-FRM-OFF-01 Lone-worker check-in and missed-contact escalation | Record contacts and proportionate escalation without unnecessary surveillance. |
| BOUK-FRM-OFF-02 DSE adjustment and eye-test request record | Track agreed equipment/work changes and applicable eye-test provision. |
Retain the record ID, task, location, competent author, revision, date, decision, restrictions, action owner and separate effectiveness evidence. Restrict personal and health information and apply the relevant retention rule. File genuine results separately from teaching examples.