Point-of-work change and stop-work review

BOUK-FRM-RISK-01 · v1.0 · Blank editable master · DOCX

Record changed conditions, suspension, reassessment and safe restart authority.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

BOUK-FRM-RISK-01 | Version 1.0 | 23 October 2026 | GB baseline

BLANK EDITABLE MASTER. Record actual facts, evidence and decisions. Operational entries, signatures and approvals are blank.

Record changed conditions, suspension, reassessment and safe restart authority.

Record identityActual entry
Record reference and project
Exact location task and date
Recorder role and competence

Scope facts and prerequisites

Required informationActual evidence or decision
Task location time and change observed
Current assessment and method references
People and interfaces now affected
Critical control that is absent or invalid
Immediate stop restriction and protection

Decisions handover and verification

Stop the task when the assessed method no longer matches the conditions, a critical safeguard fails or the team cannot demonstrate the required safe sequence.

Required informationActual evidence or decision
Competent reassessment and required changes
Who authorises restart and on what evidence
Updated briefing and worker understanding
Follow-up observation and reopening trigger
Finding or actionOwner and due dateEvidence and effectiveness
Review and acceptanceActual entry
Reviewer name role and date
Required signatures and date
Remaining restrictions and restart authority

Retain factual evidence and limitations. A signature, permit or tick does not establish that the physical controls work. Use the separate procedure and the completed decision example for guidance; never copy an example as an actual result.

Guidance Risk Assessment and Risk Profiling · Safe Systems of Work

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.