Contractor prequalification and capability review

BOUK-CHK-SUB-01 · v1.0 · Blank editable master · DOCX

Assess competence, resources, previous performance and scope-specific controls.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

ROUTINE FIRST-LINE CHECK

Blank editable checklist. Assess competence, resources, previous performance and scope-specific controls. Use actual evidence for the defined scope. No inspection, approval or signature is prefilled.

Location and taskChecker and date
Site: ___________________
Area / asset: ___________________
Checker: ___________________
Date: ___________ Shift: ___________
Scope / approved criteria
Scaffolding, asbestos or demolition subcontractor. Hold appointment, delivery or work when necessary competence, safeguards, technical information or coordinated arrangements cannot be demonstrated.

Version: 1.0 | * = critical control. Observe safely; never defeat a guard or open live equipment.

RefClosed control questionOne response
C01* Is the proposed package scope risk and subcontracting boundary defined?Yes No N/A
C02* Is contractor capability relevant to the actual work and complexity?Yes No N/A
C03* Are competent people supervision resources and specialist appointments demonstrated?Yes No N/A
C04Are previous performance and evidence limitations evaluated?Yes No N/A
C05Are design RAMS plant and legal prerequisites appropriate to the package?Yes No N/A
C06Are BuildOut client contractor and onward-subcontractor interfaces allocated?Yes No N/A
C07Are monitoring escalation and safe handback requirements agreed before appointment?Yes No N/A
C08* Is appointment or mobilisation held where a critical capability or coordination gap remains?Yes No N/A
YesNoN/AScore %

Yes = 1; No = 0. Score = Yes / (Yes + No) x 100. N/A needs a reason and is excluded, not a pass. Unanswered checks remain incomplete. A critical failure requires immediate containment and escalation regardless of the score. This is not certification of safety or compliance.

Findings actions and review

Record each No finding and N/A reason by check reference. Make unsafe conditions safe before continuing. Give each action a named owner and due date.

CheckFinding / N/A reason / immediate controlAction owner / required actionDue / evidence
Review fieldAuditor or verifier entry
Checker name / signature / date
Supervisor or verifier / date
Restrictions / escalation / restart authority
Verification / evidence / effectiveness
Next routine check date
Deeper review neededYes No
Offline photograph or evidence reference
Insert image or record evidence details here

Compare only the same checklist version, wording, criteria and N/A pattern. Record the same area, asset and shift consistently. A high score does not override a failed critical control.

Regulatory context: Great Britain baseline; Northern Ireland, fire and environmental duties need nation-specific review. These are original monitoring checks, not legal certification.

Background reading

How should contractors and supply chains be managed safely?

Provision and Use of Work Equipment (PUWER)

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.