142 scoped requirements and eight worked consent decisions cover the fictional BuildOut construction and fit-out profile: commercial refurbishment, retail fit-out, light industrial builds and residential development, with about 50 employees.
Fictional BuildOut GB construction and fit-out baseline, with England, Wales and Scotland overlays and activity-triggered wider company duties. Northern Ireland and overseas work require a separate reviewed legal mapping before acceptance. No fixed project sites, turnover, plant inventory, current permissions or operational compliance evidence were supplied.
The operational Register sheet is blank. Worked examples contains the detailed requirements catalogue; Guide explains its use and the completed consent decisions. Each requirement has an applicability reason, practical control, expected evidence, review owner and decision.
142 requirements shown
Open an entry to read its duty, controls, evidence and completed applicability decision. This search does not create an operational record.
Health safety and fire
HS-001 Health and Safety at Work etc. Act 1974
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Core: employer, contractor and other dutyholder activities; protects workers and affected third parties.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Ensure, so far as reasonably practicable, safe work, plant, systems, handling/storage, information/training/supervision, access and welfare; protect non-employees; cooperate and do not charge workers for statutory protection.
Records required when triggered: Written health and safety policy, organisation and arrangements where five or more employees are employed; revise as appropriate and bring to employees’ attention. The under-five exception arises from SI 1975/1584.
Key provisions: ss. 2–4, 6–9; s. 2(3) policy
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-GOV; BOUK-PLN-GOV-01; BOUK-PRO-CDM
Expected evidence: Board-approved policy; organisation chart; responsibilities; objectives; assurance and review records. ISO 45001 certification and a particular manual layout are not statutory requirements.
Review owner: Managing director / board
Completed applicability decision: Applies to the stated employer and construction profile; implementation evidence still required.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-002 Management of Health and Safety at Work Regulations 1999
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Core: employers and applicable self-employed activities; include stress, lone work, fatigue, young persons, pregnancy and contractor interfaces in assessment where relevant.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Suitable and sufficient assessment; preventive arrangements; competent assistance; emergency procedures; cooperation, coordination, information and training; review on relevant change or reason to doubt validity.
Records required when triggered: At five or more employees, record significant assessment findings and groups especially at risk (reg. 3(6)); record arrangements for effective planning, organisation, control, monitoring and review (reg. 5(2)). Other hazard rules can require records regardless of headcount.
Key provisions: regs. 3–5, 7–13, 16–19
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-GOV; BOUK-PLN-GOV-01; BOUK-PRO-CDM
Expected evidence: Risk register; assessment/change-review forms; competency matrix; emergency plan; contractor coordination records. An annual review date is a company control, not a universal statutory frequency.
Review owner: Managing director / board
Completed applicability decision: Applies to the stated employer and construction profile; implementation evidence still required.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-003 Construction (Design and Management) Regulations 2015
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: All construction projects, including small/domestic, maintenance and demolition, with duties dependent on client/designer/principal designer/contractor/principal contractor role.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Plan, manage, monitor and coordinate work; eliminate/reduce foreseeable design risks; appoint capable dutyholders; provide information, welfare and safe site arrangements; consult workers.
Records required when triggered: Construction phase plan before construction begins on every project. Written principal designer/principal contractor appointments where more than one contractor is or is reasonably foreseeable. Health and safety file for multi-contractor projects. Pre-construction information supplied. F10 notification where work is scheduled to last longer than 30 working days with more than 20 workers working simultaneously at any point, or to exceed 500 person-days. Written demolition/dismantling arrangements (reg. 20); specified excavation/cofferdam/caisson inspection reports (reg. 24 and Sch. 5).
Key provisions: regs. 4–15; 20, 22–24; Schs. 2–5
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-CDM; BOUK-PLN-CDM-01; BOUK-PRO-DES
Expected evidence: Project dutyholder matrix; design-risk register; RAMS review; induction; site logistics/welfare plans; inspection/action log; handover index. Do not treat every suggested form as a separately named statutory document.
Review owner: Project manager
Completed applicability decision: Applies to the stated employer and construction profile; implementation evidence still required.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-004 Work at Height Regulations 2005
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Any work at height where a fall could cause personal injury; no general two-metre threshold for applying the duties.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Avoid height work where reasonably practicable; otherwise prevent falls, then minimise consequences; plan/supervise with competent people; select appropriate equipment; plan emergencies/rescue; inspect as required.
Records required when triggered: Record prescribed inspections; construction working platforms from which a person could fall two metres or more have specific seven-day inspection and reporting requirements. Relevant reports retained on site until construction work is complete and then at an office for three months; general inspection records retained until the next inspection. Scaffold strength/stability calculations unless covered by an available calculation or recognised standard configuration; assembly/use/dismantling plan according to complexity, kept available until dismantled (Sch. 3).
Key provisions: regs. 4–12, 14; Schs. 3 and 7
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-WAH; BOUK-PLN-WAH-01; BOUK-PRO-DEM
Expected evidence: Work-at-height/rescue plan; scaffold design/handover; ladder/MEWP checks; harness inspection; exclusion-zone plan. Generic annual harness inspection alone is not a substitute for task/equipment-specific duties.
Review owner: Site manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-005 Control of Asbestos Regulations 2012
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Where asbestos may be disturbed; reg. 4 duty to manage non-domestic premises/common parts depends on maintenance/control responsibilities. Licensed and notifiable non-licensed work have extra duties.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Identify asbestos before work; assess/control exposure; provide suitable information/training/RPE; licensing, notification, air monitoring and medical surveillance where triggered; manage asbestos in relevant premises.
Records required when triggered: Reg. 4 written asbestos management plan/condition-location record where duty applies; suitable recorded assessment and written plan of work before asbestos work; notifications/licence where required; exposure/control-equipment records as applicable; health records for licensable and NNLW work kept 40 years.
Key provisions: regs. 4–11, 19–22
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-DEM; BOUK-PLN-DEM-01; BOUK-PRO-ASB
Expected evidence: Asbestos survey/refurbishment-demolition survey specification; register; permit/hold point; emergency procedure; face-fit/training evidence. Awareness training does not authorise asbestos work.
Review owner: Project manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-006 Control of Substances Hazardous to Health Regulations 2002
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Exposure to hazardous substances, including silica and wood dust, cement, welding fume, chemicals and biological agents; asbestos, lead and ionising radiation have separate regimes.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess exposure; prevent or adequately control it; maintain control measures; provide information/training; monitor exposure and undertake health surveillance where required.
Records required when triggered: Record significant assessment findings and necessary control steps at five or more employees; control-equipment examination/test records generally at least five years; monitoring records generally five years or 40 years where representative of identifiable employees’ personal exposure; health records at least 40 years where surveillance required.
Key provisions: regs. 6–12; particularly 9–11
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-COSHH; BOUK-PRO-CONF; BOUK-PLN-CONF-01
Expected evidence: Task-specific COSHH assessments; substance/SDS inventory; LEV logbook and test reports; RPE selection/face-fit; exposure and occupational-health referral records. An SDS alone is not a COSHH assessment.
Review owner: Competent health and safety adviser
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-007 Provision and Use of Work Equipment Regulations 1998
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Work equipment provided/used/controlled at work, including hired plant, tools and machinery.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Provide suitable equipment; maintain safe condition; inspect where installation/deterioration creates risk; guard hazards; train users and restrict specific-risk equipment to designated people.
Records required when triggered: Record inspections required by reg. 6 and keep until the next inspection; provide physical evidence of last inspection when equipment moves between undertakings. Keep any maintenance log up to date where such a log exists; this is not a blanket duty to create a log for every tool.
Key provisions: regs. 4–9, 11–19; power press provisions if applicable
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-WAH; BOUK-PLN-WAH-01; BOUK-PRO-LIFT
Expected evidence: Plant/tool register; pre-use checks; maintenance schedule; authorisation and competency evidence; isolation/lockout procedure; defect quarantine log.
Review owner: Site manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-008 Lifting Operations and Lifting Equipment Regulations 1998
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Lifting equipment/accessories used at work, including hired equipment and lifting people; assess exclusions.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Lifting operations competently planned, appropriately supervised and safe; suitable/strong/stable equipment; marked safe working loads; thorough examination and inspection at required intervals.
Records required when triggered: Written thorough-examination reports with Sch. 1 particulars; inspection records; specified dangerous defects reported. Retain first-use equipment examination until ceasing use, first-use accessory reports two years; installation reports until leaving that place; in-service examination until next report or two years, whichever later; inspection reports until next report.
Key provisions: regs. 4–11; Sch. 1
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-LIFT; BOUK-PLN-LIFT-01
Expected evidence: Proportionate lift plan; lifting register; appointment/competence evidence; accessory register; defect close-out. Every lift must be planned; not every routine lift needs a new standalone written plan.
Review owner: Authorised specialist / appointed person
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-009 Electricity at Work Regulations 1989
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Electrical systems/equipment and work on or near them, including temporary site supplies and overhead/underground services.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Construct/maintain systems to prevent danger; suitable isolation and dead working; tightly restricted live work; competent persons and precautions.
Records required when triggered: No blanket statutory requirement under EAW for PAT labels or test records, or annual PAT. Records are useful evidence of safe maintenance; separate PUWER inspection-record duties can still apply.
Key provisions: regs. 4–16
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-ELEC; BOUK-PLN-ELEC-01; BOUK-PRO-EXC
Expected evidence: Electrical register; risk-based inspection/test programme; isolation/permit records; temporary distribution design; competence evidence; utility drawings/service surveys.
Review owner: Authorised specialist / appointed person
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-010 Confined Spaces Regulations 1997
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: A substantially enclosed space with a reasonably foreseeable specified serious risk; not every small enclosed area is a statutory confined space.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Avoid entry; where unavoidable use a safe system of work; suitable and sufficient rescue arrangements before entry, including rescuer safety.
Records required when triggered: No universal standalone permit form is expressly prescribed by these Regulations. Record assessment under applicable MHSWR threshold; safe-system/emergency evidence should be proportionate to the risk.
Key provisions: regs. 4–5
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-CONF; BOUK-PLN-CONF-01; BOUK-PRO-PTW
Expected evidence: Entry assessment; permit-to-work where indicated; atmospheric testing; isolation certificate; rescue plan/drill and competency records. Do not rely solely on public emergency services for rescue.
Review owner: Authorised specialist / appointed person
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-011 Dangerous Substances and Explosive Atmospheres Regulations 2002
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Dangerous substances creating fire, explosion or similar safety risks, including fuels, solvents, flammable gases and combustible dusts.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess and eliminate/reduce risks; control releases/ignition; classify hazardous places; select suitable equipment; emergency arrangements and information/training.
Records required when triggered: Significant risk-assessment findings recorded at five or more employees; hazardous-area classification and verification before first use as required. Written instructions and permits for hazardous activities where risk assessment requires under Sch. 1.
Key provisions: regs. 5–9; Schs. 1–3
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-FIRE; BOUK-PLN-FIRE-01; BOUK-PRO-CONF
Expected evidence: DSEAR assessment; zoning drawings; flammable-store inventory; hot-work controls/permits; equipment suitability and emergency-test records. A standalone hot-work permit is not universally mandated for every task.
Review owner: Site manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-012 Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Defined work-related reportable deaths, injuries, occupational diseases and dangerous occurrences; responsibility differs for employees, self-employed and people in control of premises.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Report qualifying events within the specified timescales; distinguish over-seven-day reporting from over-three-day recording. Not every accident or near miss is reportable.
Records required when triggered: Keep required reportable-event records and over-three-day injury records for at least three years; record report date/method, event details, persons and nature of injury/disease.
Key provisions: regs. 4–12; Schs. 1–3
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-INC
Expected evidence: Incident register; reportability decision checklist; notification receipts; investigation and corrective-action record. Investigation format and a near-miss register are company controls, not RIDDOR-prescribed forms.
Review owner: Competent health and safety adviser
Completed applicability decision: Applies to the stated employer and construction profile; implementation evidence still required.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-013 Control of Noise at Work Regulations 2005
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Workers exposed to risk from occupational noise, including construction tools, plant and processes.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess exposure; eliminate/reduce at source; use technical/organisational control programme where triggered; hearing protection/zones, information/training and health surveillance where required; respect limits.
Records required when triggered: Record significant risk-assessment findings and measures required; maintain individual health records for workers under hearing surveillance. Do not confuse occupational-health clinical notes with employer health records.
Key provisions: regs. 5–10
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-NOISE; BOUK-PLN-NOISE-01; BOUK-PRO-OCC
Expected evidence: Noise assessment/map; hearing-protection selection; noise reduction action plan; audiometry fitness outcomes; maintenance and training evidence.
Review owner: Competent health and safety adviser
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-014 Control of Vibration at Work Regulations 2005
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Hand-arm or whole-body vibration exposure from tools, plant and vehicles.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess exposure; prevent/reduce risk; implement control programme at action values; keep below exposure limits; information/training; health surveillance where appropriate.
Records required when triggered: Record significant assessment findings and measures required; maintain individual health-surveillance records. A continuous electronic daily exposure log is not universally required by the Regulations.
Key provisions: regs. 5–8
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-VIB; BOUK-PRO-OCC; BOUK-PLN-OCC-01
Expected evidence: Tool-vibration data register; realistic exposure assessment; control action plan; targeted usage studies; HAVS surveillance referral/fitness outcomes.
Review owner: Competent health and safety adviser
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-015 Manual Handling Operations Regulations 1992
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Hazardous lifting, lowering, carrying, pushing, pulling or moving loads by bodily force.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Avoid hazardous manual handling where reasonably practicable; assess unavoidable operations and reduce injury risk; provide load information where reasonably practicable.
Records required when triggered: Record significant assessment findings under the MHSWR five-employee threshold; no mandatory proprietary form or universal maximum lawful lifting weight.
Key provisions: reg. 4; Sch. 1
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-MAN
Expected evidence: Task/load/environment/individual capability assessment; mechanical-aid plan; MAC/RAPP assessment where useful; training and review records.
Review owner: Site manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-016 Personal Protective Equipment at Work Regulations 1992
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Residual risks requiring PPE for employees and qualifying limb (b) workers; PPE for asbestos, lead, noise, ionising radiation and COSHH risks is governed by the relevant specific regime.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess suitability/compatibility; provide appropriate PPE free; maintain/store/replace; train/instruct; ensure use; workers report loss/defects.
Records required when triggered: No universal PPE issue-log format or separate written PPE policy prescribed. Assessment/control findings may require recording under MHSWR or hazard-specific rules.
Key provisions: regs. 3–11
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-COSHH; BOUK-PRO-PPE
Expected evidence: PPE matrix; selection/suitability assessment; issue/inspection/replacement log; instruction/competence evidence; task-specific RPE face-fit records where relevant.
Review owner: Competent health and safety adviser
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-017 Personal Protective Equipment at Work (Amendment) Regulations 2022
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Amendment to LAW-PPE; effective 6 April 2022.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Extends relevant PPE employer/worker duties to qualifying limb (b) workers. Assess employment status correctly.
Records required when triggered: Use the same evidence system as LAW-PPE; do not invent a second duplicate PPE policy merely because an amendment is listed.
Key provisions: regs. 2–7 amend SI 1992/2966
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-PPE
Expected evidence: Workforce-status review; supply arrangements for qualifying non-employee workers.
Review owner: Competent health and safety adviser
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-018 Health and Safety (First-Aid) Regulations 1981
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Employers’ first-aid arrangements for employees; site remoteness, shifts and hazards affect adequacy.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Adequate and appropriate equipment, facilities and personnel; inform employees of arrangements.
Records required when triggered: The first-aid needs assessment does not have to be recorded. First-aid treatment records are good practice, distinct from RIDDOR/statutory accident-book duties.
Key provisions: regs. 3–4
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-EMER; BOUK-PLN-EMER-01
Expected evidence: Written needs assessment; first-aider/appointed-person roster; qualification expiry tracker; kit checks; confidential treatment record.
Review owner: First aider / emergency coordinator
Completed applicability decision: Applies to the stated employer and construction profile; implementation evidence still required.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-019 Safety Representatives and Safety Committees Regulations 1977
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Employees represented by safety representatives appointed by recognised trade unions.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Consult safety representatives in good time; provide information, facilities/time off and training; enable statutory functions; establish committee if requested by two or more representatives as prescribed.
Records required when triggered: No universal meeting-minute template. Make relevant statutory information/documents available, subject to confidentiality restrictions; representatives may make inspection reports.
Key provisions: regs. 3–9
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-CONS; BOUK-PLN-CONS-01
Expected evidence: Consultation arrangements; representative appointments; committee terms/minutes; inspection reports and action close-out.
Review owner: Competent health and safety adviser
Completed applicability decision: Apply the recognised-union representative route where triggered; coordinate with the separate 1996 consultation route.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-020 Health and Safety (Consultation with Employees) Regulations 1996
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Employees not represented under the 1977 Regulations; both regimes may apply within one business.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Consult directly or via elected representatives on relevant health/safety matters; provide information, facilities and training as required.
Records required when triggered: No universal separate consultation policy or minute template prescribed. Evidence actual timely consultation; protect confidential personal information.
Key provisions: regs. 3–7
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-CONS; BOUK-PLN-CONS-01
Expected evidence: Election/representative records; toolbox consultation feedback; meeting/action log; responses to concerns.
Review owner: Competent health and safety adviser
Completed applicability decision: Apply for employees not covered by recognised-union safety representatives; confirm the actual representation arrangements.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-021 Workplace (Health, Safety and Welfare) Regulations 1992
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Generally applies to offices, depots and other relevant workplaces; most provisions do not apply to construction sites, which use CDM site/welfare duties. Check reg. 3 exclusions and limited exceptions.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Maintain suitable workplace conditions, ventilation, temperature, lighting, cleanliness, traffic routes, sanitary/washing/drinking/rest facilities.
Records required when triggered: No universal written welfare plan or fixed inspection-record form prescribed by these Regulations. Assessment/maintenance evidence may be required under connected duties.
Key provisions: regs. 3–25
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-WEL; BOUK-PLN-WEL-01; BOUK-PRO-OFF
Expected evidence: Office/depot inspection; welfare maintenance and cleaning schedule; water hygiene arrangements; workplace traffic plan. Use CDM Sch. 2 for construction site welfare.
Review owner: Site manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-022 Health and Safety (Safety Signs and Signals) Regulations 1996
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Significant residual risks needing safety signs or signals, including traffic, emergency, mandatory/prohibition/warning signs.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Provide correct, visible, maintained signs/signals where other controls do not adequately address risk; inform/train workers.
Records required when triggered: No universal signage register required; physical signs/signals and effective instruction are the controls.
Key provisions: regs. 4–5; Sch. 1
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-WEL; BOUK-PLN-WEL-01
Expected evidence: Signage layout/register; inspection checklist; induction/training records.
Review owner: Site manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-023 Regulatory Reform (Fire Safety) Order 2005
Jurisdiction: England and Wales
Applicability: Relevant non-domestic premises and relevant parts of multi-occupied residential buildings; establish responsible person/control and construction/occupied-building interfaces.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess fire risk; implement/maintain general fire precautions, escape, detection/fighting and emergency arrangements; competent assistance; information/training; cooperate with other responsible persons.
Records required when triggered: From 1 October 2023 all responsible persons must record the fire risk assessment in full and fire-safety arrangements, regardless of employee numbers; record assessor identity and required responsible-person/contact information and handover/shared information.
Key provisions: arts. 3–22; amendments by Building Safety Act 2022 s. 156
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-FIRE; BOUK-PLN-FIRE-01
Expected evidence: Fire management/emergency plan; fire logbook; drill, alarm, extinguisher and escape-route checks; hot-work controls; occupied-building interface plan. These controls evidence duties but not every named log is independently statutory.
Review owner: Site manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-024 Fire (Scotland) Act 2005
Jurisdiction: Scotland
Applicability: Part 3 fire safety duties for relevant premises; separate legal regime from England/Wales. Determine dutyholder and premises scope.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess fire risk and take reasonable fire-safety measures to protect employees/relevant persons; duties also arise for those controlling premises.
Records required when triggered: Read with the 2006 Regulations for recording and management requirements; do not apply the England/Wales 2023 recording amendment automatically in Scotland.
Key provisions: Part 3, especially ss. 53–54
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-FIRE; BOUK-PLN-FIRE-01
Expected evidence: Scottish premises fire risk assessment and fire-safety management arrangements; emergency/evacuation plan.
Review owner: Site manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-025 Fire Safety (Scotland) Regulations 2006
Jurisdiction: Scotland
Applicability: Relevant premises under Part 3 of the Fire (Scotland) Act 2005.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess/review risks; fire-safety arrangements and measures; means of escape, maintenance, information, training, cooperation and coordination.
Records required when triggered: Record significant findings, especially-at-risk persons and management arrangements where five or more employees, premises require a licence/registration under an enactment, or an alterations notice requires it; confirm the precise statutory trigger for premises.
Key provisions: regs. 3–6, 12–21
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-FIRE; BOUK-PLN-FIRE-01
Expected evidence: Fire logbook; equipment testing/drill records; fire-safety training and inspection evidence.
Review owner: Site manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-026 Control of Major Accident Hazards Regulations 2015
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Conditional: establishment operator holding dangerous substances at/above qualifying thresholds; being a contractor at a COMAH establishment does not automatically make Build Out the operator.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Operators take all measures necessary to prevent major accidents/limit effects; notify competent authority; coordinate major-hazard controls and emergency interfaces.
Records required when triggered: Operator notification and written major accident prevention policy (MAPP). Upper-tier operators additionally safety report and written internal emergency plan plus information for external plans; reviews/test obligations as prescribed.
Key provisions: regs. 5–12; Schs. 1–4
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-SPEC; BOUK-PLN-SPEC-01
Expected evidence: Contractor major-hazard interface plan; operator permit/compliance requirements; SIMOPS and management-of-change records. Keep operator duties distinct from contractor controls.
Review owner: Competent health and safety adviser
Completed applicability decision: Specialist scope not established in the profile. Exclude only after documented task screening; do not undertake without specialist arrangements.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-027 Carriage of Dangerous Goods and Use of Transportable Pressure Equipment Regulations 2009
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Conditional: dangerous-goods carriage and associated consigning, packing, filling, loading/unloading; exemptions/thresholds must be assessed for fuels, gases, chemicals and waste.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Comply with applicable ADR/RID requirements through CDG, packaging/marking, documentation, training, vehicles and equipment; appoint DGSA where required. HSE currently identifies ADR 2025.
Records required when triggered: Applicable transport documents and written emergency instructions; training records; DGSA reports and appointment evidence where required; pressure receptacle inspection/certification as applicable. Duties differ where exemptions apply.
Key provisions: reg. 5 and incorporated ADR/RID requirements
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-SPEC; BOUK-PLN-SPEC-01
Expected evidence: Dangerous-goods classification/exemption assessment; transport checklist; driver training and load documentation; contractor assurance.
Review owner: Competent health and safety adviser
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-028 Explosives Regulations 2014
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Conditional: explosives acquisition, keeping, manufacture, storage and use, including specialist blasting/demolition; do not assume cartridge tools require the same licensing as bulk blasting explosives.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Prevent fire/explosion, control storage/security; obtain relevant authorisations/licences/certificates and comply with separation distances/conditions; report losses.
Records required when triggered: Relevant licences/certificates/transfer documents where required; prescribed relevant/civil explosives stock/traceability records. Civil-explosive traceability generally 10 years after use/transfer/destruction; other relevant-explosive records generally three years, subject to exemptions.
Key provisions: regs. 6–9, 26–37; relevant schedules
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-SPEC; BOUK-PLN-SPEC-01
Expected evidence: Blast plan/design; exclusion-zone and warning procedure; stock reconciliation; competent specialist appointment; misfire/emergency plan.
Review owner: Competent health and safety adviser
Completed applicability decision: Specialist scope not established in the profile. Exclude only after documented task screening; do not undertake without specialist arrangements.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-029 Pressure Systems Safety Regulations 2000
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Conditional: qualifying pressure systems with relevant fluid, including certain air receivers/compressors, steam systems and connected pipework; check exclusions.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Establish safe operating limits; safe design/installation/operation/maintenance; competent-person examination under a suitable scheme.
Records required when triggered: Written scheme of examination before operation where regs. 8–9 apply; written examination reports and required records; safe-operating-limit and operating instruction information. Retention is record-specific under reg. 14, not a single generic annual certificate rule.
Key provisions: regs. 4–14; Schs. 1–2
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-SPEC; BOUK-PLN-SPEC-01
Expected evidence: Pressure system register; WSE/examination schedule; maintenance and defect close-out; hire certificate checks.
Review owner: Competent health and safety adviser
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-030 Control of Lead at Work Regulations 2002
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Conditional: work exposing workers to lead, such as paint removal, burning/cutting coated steel and lead work; enhanced controls where exposure is significant.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess and prevent/control exposure; hygiene and protective measures; monitoring and medical surveillance where triggered; act on suspension levels/medical advice.
Records required when triggered: Recorded significant assessment findings/control steps where five or more employees; exposure/control examination records and medical-surveillance health records where required; do not give managers unrestricted clinical records.
Key provisions: regs. 5–12
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-SPEC; BOUK-PLN-SPEC-01
Expected evidence: Lead task assessment; exposure monitoring plan; work/hygiene method; medical fitness/restriction record and surveillance tracker.
Review owner: Competent health and safety adviser
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-031 Ionising Radiations Regulations 2017
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Conditional: industrial radiography, radioactive sources/gauges or relevant radon exposure; specialist advice needed.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Prior radiation risk assessment; restrict exposure; notify/register/obtain consent according to risk; consult suitable RPA; designate areas/supervision; local rules and contingency arrangements where required; dose assessment and medical surveillance as triggered.
Records required when triggered: Recorded risk assessment; HSE notification/registration/consent evidence; written local rules where required; contingency plans; dose, source and health records as applicable. Do not treat all radiation work as consent-required.
Key provisions: regs. 5–8, 12–18, 21–27
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-SPEC; BOUK-PLN-SPEC-01
Expected evidence: Radiation management file; RPA/RPS appointments; area controls; contractor interface; dosimetry and incident arrangements.
Review owner: Competent health and safety adviser
Completed applicability decision: Specialist scope not established in the profile. Exclude only after documented task screening; do not undertake without specialist arrangements.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-032 Health and Safety (Display Screen Equipment) Regulations 1992
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Habitual DSE users, including office, site-office and applicable home/hybrid users; occasional brief use is outside the defined-user scope.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess workstations/reduce risks; meet minimum requirements; plan breaks/changes of activity; eye tests on request and necessary special corrective appliances; training/information.
Records required when triggered: No prescribed DSE form; record significant risk findings under applicable MHSWR threshold. Evidence required provision of assessment, remedial action, training and eye-test arrangements.
Key provisions: regs. 2–7; Sch.
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-OFF
Expected evidence: DSE checklist; workstation action log; information/training; eye-test request process. Avoid storing unnecessary clinical details.
Review owner: People / training coordinator
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-033 Gas Safety (Installation and Use) Regulations 1998
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Conditional: gas installation/maintenance/use within scope, mainly domestic and relevant commercial premises; industrial-premises/process exclusions need checking. Landlord duties only if Build Out has that role.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Competent gas work; Gas Safe registration for relevant businesses; safe installation/appliances/flues, maintenance and checks; landlord duties where applicable.
Records required when triggered: Landlord gas safety check records where reg. 36 applies, retained at least two years and supplied as required. No assumption every contractor has landlord annual-check duties.
Key provisions: regs. 3, 26, 35–36
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-GAS
Expected evidence: Gas-work scope/competence checks; commissioning/handover evidence; appliance register; maintenance records; gas emergency procedure.
Review owner: Authorised specialist / appointed person
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-034 Health and Safety Information for Employees Regulations 1989
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Core where employees are engaged.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Display the approved health and safety law poster where readable or provide equivalent approved leaflet to each worker.
Records required when triggered: Approved poster or leaflet provision is required; an additional signed receipt register is optional evidence.
Key provisions: reg. 4
Instrument or official source · Supporting official guidance
Controls: BOUK-REG-GOV-03
Expected evidence: Site/office display check; induction distribution record.
Review owner: Document controller / administrator
Completed applicability decision: Applies to the stated employer and construction profile; implementation evidence still required.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-035 Employers’ Liability (Compulsory Insurance) Act 1969
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Employers unless a specific exemption applies; check employment arrangements rather than assuming all subcontractors are excluded.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Maintain authorised insurance against liability for employee injury/disease arising from employment.
Records required when triggered: Policy/certificate of insurance, read with the 1998 Regulations for minimum cover and display/access requirements.
Key provisions: ss. 1–4
Instrument or official source · Supporting official guidance
Controls: BOUK-REG-GOV-03
Expected evidence: Insurance schedule and renewal tracker; broker scope confirmation; contractor insurance checks. Public liability insurance is not made universally compulsory by this Act.
Review owner: Document controller / administrator
Completed applicability decision: Applies to the stated employer and construction profile; implementation evidence still required.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-036 Employers’ Liability (Compulsory Insurance) Regulations 1998
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Employers within the 1969 Act; linked to LAW-EL-ACT.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Required insurance of at least £5 million, subject to applicable provisions; display certificate, including permissible electronic access.
Records required when triggered: Current certificate accessible to employees as prescribed; historic certificate retention is prudent evidence, but avoid asserting a universal current 40-year statutory retention duty.
Key provisions: regs. 3, 4–5
Instrument or official source · Supporting official guidance
Controls: BOUK-REG-GOV-03
Expected evidence: Insurance certificate archive and renewal alert.
Review owner: Document controller / administrator
Completed applicability decision: Applies to the stated employer and construction profile; implementation evidence still required.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-037 Control of Artificial Optical Radiation at Work Regulations 2010
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Conditional: harmful artificial optical radiation, e.g. welding arcs, lasers and high-intensity sources; ordinary harmless office lighting does not need elaborate assessment. A specific reg. 3 assessment is required where foreseeable eye/skin risks have not already been eliminated or adequately controlled; record existing controls under applicable general duties.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess exposure/risk and control harmful sources; exposure limits; information/training; appropriate health surveillance where triggered.
Records required when triggered: Record significant assessment findings and required measures; health-surveillance records where required.
Key provisions: regs. 3–6
Instrument or official source · Supporting official guidance
Controls: BOUK-RA-SPEC-02; BOUK-RAMS-FIRE-01
Expected evidence: Welding/laser assessment; enclosure/screens; PPE selection; authorised-user training; specialist optical assessment if necessary.
Review owner: Competent health and safety adviser
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-038 Control of Electromagnetic Fields at Work Regulations 2016
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Conditional: employee exposure to EMFs, especially powerful electrical/industrial sources; consider workers with implanted/body-worn medical devices.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Assess exposure, comply with limits; risk assessment/action plan where appropriate; minimise risks; information/training and health surveillance where required.
Records required when triggered: Keep suitable records of exposure assessments, risk assessments and action plans as required; health records when surveillance is required.
Key provisions: regs. 4–10
Instrument or official source · Supporting official guidance
Controls: BOUK-RA-SPEC-02
Expected evidence: EMF source register; assessment; exclusion zones; worker-at-particular-risk referral process; supplier information.
Review owner: Competent health and safety adviser
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-039 Work in Compressed Air Regulations 1996
Jurisdiction: Great Britain (England, Wales and Scotland); check offshore/territorial extensions separately; not the NI regime
Applicability: Conditional: tunnelling/caisson and other construction work in compressed air; not ordinary use of compressed-air tools.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Notify HSE; appoint specialist competent roles and contract medical adviser; safe systems, equipment, decompression, medical surveillance and emergency arrangements.
Records required when triggered: Required work notification; health and exposure records; prescribed records of compression/decompression and training; approved decompression procedures where required.
Key provisions: regs. 4–15
Instrument or official source · Supporting official guidance
Controls: BOUK-CHK-SPEC-03
Expected evidence: Specialist compressed-air project plan; medical fitness roster; exposure/decompression log; emergency treatment and fire arrangements.
Review owner: Competent health and safety adviser
Completed applicability decision: Specialist scope not established in the profile. Exclude only after documented task screening; do not undertake without specialist arrangements.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-040 Fire Safety Act 2021
Jurisdiction: England and Wales
Applicability: Conditional: buildings containing two or more domestic premises; amendment/interface to the Fire Safety Order.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Clarifies Fire Safety Order coverage of building structure/external walls (including cladding/balconies) and doors between domestic premises and common parts.
Records required when triggered: Ensure required Fire Safety Order risk assessment covers clarified elements; not a new universal standalone construction policy.
Key provisions: s. 1
Instrument or official source · Supporting official guidance
Controls: BOUK-CHK-FIRE-02
Expected evidence: Occupied residential fire-interface assessment; external wall/door information handover.
Review owner: Project manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-041 Fire Safety (England) Regulations 2022
Jurisdiction: England only (extends to England and Wales but applies only in England)
Applicability: Conditional: responsible persons for relevant multi-occupied residential buildings; extra thresholds for buildings over 11 m and high-rise buildings.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Provide residents with fire instructions/door information; door checks at relevant heights; high-rise plans, external wall information, information box, wayfinding and lift/firefighting-equipment checks.
Records required when triggered: Required plans and external-wall information for high-rise buildings; monthly equipment-check records; records of endeavours to check flat entrance doors where threshold applies; resident information and fire-service notifications as required.
Key provisions: regs. 4–11
Instrument or official source · Supporting official guidance
Controls: BOUK-CHK-FIRE-02
Expected evidence: Occupied-building interface and handover checklist; fire door/asset register; resident communication controls. Contractor assistance does not transfer responsible-person duties automatically.
Review owner: Project manager
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-042 Fire Safety (Residential Evacuation Plans) (England) Regulations 2025
Jurisdiction: England only; effective 6 April 2026
Applicability: Conditional: specified residential buildings with at least two domestic premises and either at least 18 m/7 storeys, or over 11 m with simultaneous evacuation strategy. Duties principally on responsible person.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Identify relevant residents using reasonable endeavours; offer person-centred fire risk assessments; arrange the required measures/statements/reviews; building emergency evacuation plan; lawful information sharing.
Records required when triggered: Building emergency evacuation plan and prescribed resident assessment/evacuation information where triggered; share required information with fire and rescue service subject to relevant consent/data safeguards.
Key provisions: regs. 3–13; confirm exact provision for each record
Instrument or official source · Supporting official guidance
Controls: BOUK-CHK-FIRE-02
Expected evidence: Refurbishment/occupied-site interface; change-control and evacuation-impact assessment. Not a blanket duty on every construction contractor to hold residents’ medical data.
Review owner: Project manager
Completed applicability decision: England occupied-building overlay effective 6 April 2026 where building criteria apply; agree the responsible-person interface rather than assigning it automatically to BuildOut.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-043 Building Safety Act 2022
Jurisdiction: Provision-specific; English higher-risk-building regime must not be labelled GB-wide
Applicability: Building safety/building-control interface where Build Out is client/designer/contractor or accountable/responsible person; precise duties depend on role, work, jurisdiction and commencement.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Enables/reforms building-safety and building-control duties; distinguish construction worker safety under CDM from building-regulations compliance and occupation duties.
Records required when triggered: Specific records arise under amended legislation and implementing regulations, not from a blanket requirement for one Building Safety Act policy. Include golden-thread and mandatory-occurrence/reporting systems only where the relevant English HRB regime applies.
Key provisions: Relevant Parts 2–4 and s. 156; implementing provisions must be mapped
Instrument or official source · Supporting official guidance
Controls: BOUK-CHK-DES-02
Expected evidence: Building-safety applicability gate; role/competence matrix; design/compliance evidence and handover; specialist legal/technical review.
Review owner: Design manager / appointed designer
Completed applicability decision: Task or role triggered; establish the actual scope and named legal dutyholder before work.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-044 Building Regulations 2010
Jurisdiction: England and Wales with different amendments/regimes; Part 2A description here is England-specific
Applicability: Building work/design within scope; duties and approval/notice requirements depend on work, jurisdiction and exemptions. English higher-risk procedures additionally governed by SI 2023/909.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Ensure compliant design/building work, competence, coordination and role appointments where required; English CDM and building-regulation principal roles are distinct legal functions.
Records required when triggered: English written principal designer/principal contractor appointment/confirmation where required; required notices, plans, declarations and compliance information; HRB competence checks, change-control, golden thread and approvals only where specific rules apply.
Key provisions: Part 2A (England); applicable technical requirements and procedural provisions
Instrument or official source · Supporting official guidance
Controls: BOUK-CHK-DES-02
Expected evidence: Separate building-compliance register linked to H&S system; design assurance; change control; inspection/test and handover index. Do not equate CDM H&S file with golden thread.
Review owner: Design manager / appointed designer
Completed applicability decision: Building-regulations project duties apply where triggered. England Part 2A dutyholders and Welsh provisions must be distinguished; Scotland uses its separate warrant system.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HS-045 UK General Data Protection Regulation and Data Protection Act 2018 (as amended)
Jurisdiction: United Kingdom; check current amendments and commencement
Applicability: Personal data in competency, incident, exposure, surveillance and personnel records; health data is special-category personal data.
Dutyholder: As stated in the applicable instrument and actual project appointment; internal review owner is listed separately
Lawful, fair, transparent and proportionate processing; appropriate Article 6 basis and Article 9 condition for health data; security/access controls; retention tied to statutory obligations and legitimate purpose.
Records required when triggered: Applicable processing/privacy/accountability records. Preserve statutory health/exposure records for their required periods; do not substitute a generic short HR retention period. Employer health records should record exposure/fitness outcomes; confidential clinical records remain with the occupational-health professional, with access only on an appropriate lawful basis.
Key provisions: UK GDPR arts. 5, 6, 9, 13, 30, 32; DPA 2018 as applicable
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-COMP; BOUK-PLN-COMP-01; BOUK-PRO-OCC
Expected evidence: Role-based access/retention matrix; privacy notice; secure occupational-health transfer; separate confidential medical files from general site registers. This is a records interface, not a complete data-protection compliance register.
Review owner: Managing director / board
Completed applicability decision: Applies to personnel, health and business records; check commenced Data Use and Access Act 2025 amendments and current ICO guidance.
Review trigger: Before the affected activity, material change, incident or failed assurance; review the actual statutory timing separately
Source research: 2026-10-16. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
Environment and waste
EN-001 Environmental Protection Act 1990 sections 33 and 34
Jurisdiction: GB with national implementation
Applicability: BuildOut produces demolition, fit-out and welfare waste; waste producer and holder
Dutyholder: BuildOut as waste producer and holder; other holders retain their own duties
Prevent escape and unlawful deposit. Transfer waste only to an authorised route with an adequate description and traceable destination.
Instrument or official source · Supporting official guidance
Controls: BOUK-CHK-COSHH-01; project waste plan
Expected evidence: Classification, carrier and receiving-facility checks, transfer records and destination receipts
Review owner: Contracts / operations manager
Completed applicability decision: Applies to all waste streams; a skip hire invoice alone is insufficient.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-002 Waste England and Wales Regulations 2011 as amended
Jurisdiction: England and Wales
Applicability: Waste production, collection and material recovery
Dutyholder: Waste producer and holder, with collector or treatment operator duties where undertaken
Apply the waste hierarchy and classify each stream before storage, transport, treatment or reuse. Document departure from the hierarchy where justified.
Instrument or official source · Supporting official guidance
Controls: BOUK-CHK-COSHH-01; waste segregation plan
Expected evidence: Waste codes, hazardous-property assessment, segregation inspections and receiving acceptance
Review owner: Project manager
Completed applicability decision: Applies; unknown contaminated soil stays segregated pending classification.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-003 Control of Pollution Amendment Act 1989 and Waste England and Wales Regulations 2011
Jurisdiction: England and Wales
Applicability: Company carries construction waste or arranges carriage as broker or dealer
Dutyholder: The actual carrier, broker or dealer including BuildOut where it takes that role
Check the correct carrier, broker or dealer registration and its scope. Transporting own construction waste does not create the usual lower-tier own-waste exception.
Instrument or official source · Supporting official guidance
Controls: Waste procurement and transport arrangements
Expected evidence: Public-register result, registration holder, tier, expiry and actual haulage contract
Review owner: Procurement lead
Completed applicability decision: Conditional on carriage or brokering role; establish BuildOut and subcontractor roles before dispatch.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-004 Hazardous Waste England and Wales Regulations 2005 as amended
Jurisdiction: England
Applicability: Asbestos, lead paint residues, contaminated oils, lamps or contaminated soil classified hazardous
Dutyholder: Hazardous-waste producer, holder, consignor, carrier and consignee according to the stage
Prevent unlawful mixing; use the correct consignment and authorised destination. England no longer requires producer-premises registration; other duties remain.
Instrument or official source · Supporting official guidance
Controls: BOUK-CHK-COSHH-01; hazardous-waste controls
Expected evidence: Classification, packaging, consignment notes, consignee returns and restricted waste file
Review owner: Project manager
Completed applicability decision: Applies when hazardous waste arises; do not use ordinary mixed-waste skips.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-005 Hazardous Waste Wales Regulations 2005 as amended
Jurisdiction: Wales
Applicability: Hazardous waste produced or held at a Welsh project
Dutyholder: Welsh hazardous-waste producer or holder and the actual consignor or carrier
Determine whether premises registration is required, including the current less-than-500-kg exemption conditions; retain consignment and authorised-route evidence.
Instrument or official source · Supporting official guidance
Controls: Welsh project hazardous-waste plan
Expected evidence: Premises registration or documented exemption, quantities and consignment records
Review owner: Project manager
Completed applicability decision: Welsh overlay; do not import England's removal of premises registration.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-006 Environmental Permitting England and Wales Regulations 2016 as amended
Jurisdiction: England and Wales
Applicability: Storing, treating, recovering or disposing of waste beyond an applicable exclusion or exemption
Dutyholder: Operator controlling the regulated waste activity
Identify the operator and exact activity. Obtain the required environmental permit or register a valid exemption before operating; obey waste, quantity, duration and location limits.
Instrument or official source · Supporting official guidance
Controls: Project environmental consent schedule
Expected evidence: Granted permit or registered exemption, boundary plan, limits, inspections and returns
Review owner: Contracts / operations manager
Completed applicability decision: Conditional; being a construction site does not itself exempt waste treatment.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-007 Environmental Permitting England and Wales Regulations 2016 U1 waste exemption
Jurisdiction: England; check NRW route in Wales
Applicability: Use of suitable waste as aggregate or fill in an actual construction project
Dutyholder: Person using the waste and the exemption holder or permitted operator
Verify waste status, permitted codes, engineering suitability, quantities and genuine construction need. Register U1 only when every condition fits; otherwise resolve the permit route.
Instrument or official source · Supporting official guidance
Controls: Material acceptance and reuse plan
Expected evidence: Classification, design need, source and tonnage log, registration and delivery checks
Review owner: Project manager
Completed applicability decision: Conditional; importing material described as clean soil does not prove it is non-waste.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-008 Environmental Permitting England and Wales Regulations 2016 T5 waste exemption
Jurisdiction: England; check NRW route in Wales
Applicability: Screening or blending eligible waste on site
Dutyholder: Operator treating the waste and holder of the applicable authorisation
Check the current T5 codes, limits, location, duration and purpose before registering. T5 does not authorise crushing waste bricks, tiles or concrete, or treating hazardous waste.
Instrument or official source · Supporting official guidance
Controls: Waste treatment method and consent schedule
Expected evidence: Exemption conditions, waste acceptance and treatment quantity records
Review owner: Project manager
Completed applicability decision: Conditional; keep proposed processing held until the exact authorisation fits.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-009 Environmental Permitting England and Wales Regulations 2016 air-pollution controls
Jurisdiction: England and Wales
Applicability: Mobile crushing, screening or another prescribed Part B activity
Dutyholder: Actual mobile-plant operator and relevant waste-activity operator
Resolve local-authority permit and any separate waste authorisation or exemption, including deployment notification conditions. Hired equipment does not remove the operator's duties.
Instrument or official source · Supporting official guidance
Controls: Plant procurement and environmental consent schedule
Expected evidence: Permit holder, permitted plant, deployment conditions, dust controls and boundary monitoring
Review owner: Contracts / operations manager
Completed applicability decision: Conditional; check the particular plant and waste activity before mobilisation.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-010 Environmental Permitting England and Wales Regulations 2016 mobile waste plant
Jurisdiction: England and Wales
Applicability: On-site remediation or treatment using permitted mobile plant
Dutyholder: Mobile-plant permit operator and the party responsible for the authorised deployment
Establish whether the permit requires a deployment approval for this site, waste and process. A general plant permit is not evidence that this deployment is authorised.
Instrument or official source · Supporting official guidance
Controls: Remediation method and deployment plan
Expected evidence: Permit, regulator-approved deployment where required, monitoring and completion evidence
Review owner: Project manager
Completed applicability decision: Conditional; no remediation treatment released on a plant certificate alone.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-020 Environmental Protection Act 1990 and Waste Scotland Regulations 2012 as amended
Jurisdiction: Scotland
Applicability: Waste generated at Scottish sites, offices and welfare
Dutyholder: Scottish waste producer or holder; carrier and recipient have separate duties
Apply Scottish duty-of-care and separation requirements, including relevant food-waste rules. Verify authorised carriers and destinations through the current SEPA system.
Instrument or official source · Supporting official guidance
Controls: Scottish waste and recycling plan
Expected evidence: Stream assessment, collection arrangements, transfer descriptions and destination checks
Review owner: Project manager
Completed applicability decision: Scottish overlay; English Simpler Recycling is not the Scottish legal route.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-021 Special Waste Regulations 1996 as amended
Jurisdiction: Scotland
Applicability: Hazardous or special waste generated, moved or received
Dutyholder: Special-waste producer, consignor, carrier and consignee according to the stage
Classify special waste, follow Scottish consignment and notification procedures and retain the appropriate records; coordinate with current EASR authorisations.
Instrument or official source · Supporting official guidance
Controls: Scottish special-waste method
Expected evidence: Waste classification, consignment reference, notification and receiving evidence
Review owner: Project manager
Completed applicability decision: Conditional Scottish overlay; do not substitute an England-only consignment process.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-022 Waste England and Wales Regulations 2011 as amended by England waste-separation legislation
Jurisdiction: England
Applicability: Office and site welfare waste at a business with 50 employees
Dutyholder: Workplace waste producer and the relevant collector for collection duties
Arrange the required separate recycling and food-waste collections. Check stream rules with the collector; the fewer-than-10-FTE micro-firm delay cannot be assumed for a 50-employee company.
Instrument or official source · Supporting official guidance
Controls: Site welfare waste and collection arrangement
Expected evidence: Business-wide FTE assessment, bin plan, collection contract and checks
Review owner: Contracts / operations manager
Completed applicability decision: Applies to relevant workplace waste from 31 March 2025; not a substitute for demolition-waste classification.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-023 Waste Separation Requirements Wales Regulations 2023 and related Welsh waste restrictions
Jurisdiction: Wales
Applicability: Waste presented for collection at Welsh workplaces
Dutyholder: Welsh workplace occupier or waste producer and the relevant collector or handler
Separate the specified materials and comply with the food-waste-to-sewer ban and other disposal restrictions. Apply stream-specific thresholds and exclusions from the Welsh code.
Instrument or official source · Supporting official guidance
Controls: Welsh site welfare and recycling arrangement
Expected evidence: Stream assessment, collection contract, labelled storage and transfer evidence
Review owner: Contracts / operations manager
Completed applicability decision: Welsh overlay effective from 6 April 2024; use the Welsh code for actual streams.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
Environment and water
EN-011 Environmental Permitting England and Wales Regulations 2016 water discharge and groundwater activities
Jurisdiction: England and Wales; EA and NRW respectively
Applicability: Pumping excavation water, wash water, sewage or other effluent to surface water or ground
Dutyholder: Person carrying on or causing or knowingly permitting the regulated discharge
Identify the drainage destination and pollutant load. Establish permit, exclusion or applicable current regulatory position and all conditions before discharge; an RPS is not a permit or exemption.
Instrument or official source · Supporting official guidance
Controls: Drainage and dewatering plan; consent schedule
Expected evidence: Drain survey, water assessment, actual permission basis, sampling and inspection results
Review owner: Project manager
Completed applicability decision: Conditional; untreated concrete washout or uncertain contaminated water must not be pumped away.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-012 Water Industry Act 1991 section 118
Jurisdiction: England and Wales
Applicability: Trade effluent discharged to a public foul or combined sewer
Dutyholder: Person discharging the trade effluent to the public sewer
Obtain sewerage-undertaker consent before trade-effluent discharge and comply with quality, volume and monitoring conditions. A foul drain connection alone is insufficient.
Instrument or official source · Supporting official guidance
Controls: Concrete washout and drainage plan
Expected evidence: Written trade-effluent consent, connection location, limits and monitoring records
Review owner: Project manager
Completed applicability decision: Conditional; sewer consent is separate from a surface-water environmental permit.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-013 Water Resources Act 1991 as amended
Jurisdiction: England and Wales
Applicability: Abstracting or impounding surface water or groundwater, including construction dewatering
Dutyholder: Person abstracting or impounding water within the controlled scope
Screen the exact abstraction and impoundment against exemptions and licensing requirements with EA or NRW. In England the usual small-quantity test aggregates a single operation's abstractions; do not assume all dewatering is exempt.
Instrument or official source · Supporting official guidance
Controls: Dewatering design and water-resource consent schedule
Expected evidence: Abstraction assessment, licence or exemption rationale, volumes and conditions
Review owner: Project manager
Completed applicability decision: Conditional; discharge permission does not authorise abstraction.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-014 Environmental Permitting England and Wales Regulations 2016 flood-risk activities
Jurisdiction: England and Wales
Applicability: Work on or near main rivers, flood defences or floodplains
Dutyholder: Person carrying out the regulated flood-risk activity
Confirm main-river status and regulated distances or activity triggers. Obtain flood-risk permission or meet the exact exemption or exclusion before work.
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-WAT; flood-risk consent schedule
Expected evidence: Regulator decision, activity drawings, seasonal conditions and inspection evidence
Review owner: Project manager
Completed applicability decision: Conditional; planning permission does not replace a flood-risk authorisation.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-015 Land Drainage Act 1991
Jurisdiction: England and Wales
Applicability: Culverting, obstructing or altering an ordinary watercourse
Dutyholder: Person carrying out the controlled watercourse alteration
Check ordinary-watercourse consent with the responsible drainage authority and obtain any separate landowner or protected-site approval.
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-WAT; temporary works and drainage plan
Expected evidence: Authority consent, approved details, flood contingency and reinstatement checks
Review owner: Project manager
Completed applicability decision: Conditional; use the ordinary-watercourse route rather than assuming EA main-river control.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-016 Control of Pollution Oil Storage England Regulations 2001
Jurisdiction: England
Applicability: Applicable above-ground business oil storage, including relevant bowsers and generators
Dutyholder: Person with custody or control of the oil within the regulations scope
Check oil type, container and exclusions. Provide compliant containment, protected fittings and safe filling; the general business guidance threshold is a container capacity of 201 litres or more.
Instrument or official source · Supporting official guidance
Controls: BOUK-CHK-COSHH-01; fuel-storage arrangement
Expected evidence: Inventory, container and bund design, integrity checks, delivery and spill controls
Review owner: Site manager
Completed applicability decision: Conditional on store; small volume does not remove wider pollution-prevention duties.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-017 Water Resources Control of Pollution Oil Storage Wales Regulations 2016
Jurisdiction: Wales
Applicability: Business oil storage at Welsh sites and welfare compounds
Dutyholder: Person with custody or control of oil at the Welsh premises
Apply Welsh storage scope, containment and equipment requirements; confirm exemptions for the actual installation rather than importing England's rules.
Instrument or official source · Supporting official guidance
Controls: Fuel-storage arrangement and spill plan
Expected evidence: Oil inventory, Welsh applicability assessment, containment and maintenance evidence
Review owner: Site manager
Completed applicability decision: Welsh overlay; assess before placing a tank, drum store or bowser.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-018 Environmental Authorisations Scotland Regulations 2018 as amended in 2025
Jurisdiction: Scotland
Applicability: Water, waste and industrial activities at Scottish projects
Dutyholder: Authorised person or operator responsible for each EASR activity
Use the current EASR route, including binding rules, notifications, registrations or permits as applicable. Review the transition of older CAR, waste and PPC authorisations and the correct authorised person.
Instrument or official source · Supporting official guidance
Controls: Scottish project environmental consent schedule
Expected evidence: Current authorisation, migrated conditions, public-register check and operator responsibilities
Review owner: Contracts / operations manager
Completed applicability decision: Scottish overlay; water, waste and industrial activities moved to EASR on 1 November 2025.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-019 Environmental Authorisations Scotland Regulations 2018 construction run-off controls
Jurisdiction: Scotland
Applicability: Construction-site run-off reaches the water environment
Dutyholder: Person responsible for the construction run-off activity and its authorisation
Test the actual site against current GBR 10D scope and conditions. Where it does not qualify, obtain the construction run-off permit; assess other water activities separately.
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-WAT; Scottish pollution-prevention plan
Expected evidence: Area, road and slope assessment, drainage measures, permission and wet-weather checks
Review owner: Project manager
Completed applicability decision: Conditional Scottish overlay; do not rely on an obsolete CAR-only site assessment.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-095 Environmental Authorisations Scotland Regulations 2018 oil-storage GBR 28
Jurisdiction: Scotland
Applicability: Oil storage at a Scottish project or compound
Dutyholder: Person responsible for oil storage under the applicable Scottish binding rule
Apply the current oil-storage binding rule and its scope, containment and operational conditions. Check waste-oil controls separately; complying with a GBR does not require an application but does require compliance with every rule.
Instrument or official source · Supporting official guidance
Controls: Fuel-storage and spill-prevention arrangement
Expected evidence: Oil and container inventory, applicable GBR assessment, containment and maintenance checks
Review owner: Site manager
Completed applicability decision: Scottish overlay; do not assume England oil-storage rules or a universal oil-storage licence.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
Environment and pollution
EN-024 Environmental Protection Act 1990 Part III statutory nuisance
Jurisdiction: GB with national procedure differences
Applicability: Dust, smoke, noise, fumes, odour or lighting affects neighbours
Dutyholder: Person responsible for the nuisance or other liable person under the relevant provision
Prevent or abate statutory nuisance and comply with notices. Plan effective boundary controls for occupied shops, homes and industrial neighbours.
Instrument or official source · Supporting official guidance
Controls: Construction environmental plan; complaints and action log
Expected evidence: Boundary observations, complaints investigation, control performance and notice response
Review owner: Site manager
Completed applicability decision: Applies where impacts arise; planning hours do not excuse nuisance.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-025 Control of Pollution Act 1974 sections 60 and 61
Jurisdiction: GB; confirm local procedure
Applicability: Noisy construction or demolition near sensitive neighbours
Dutyholder: Person carrying out the construction or demolition works subject to the noise controls
Plan best practicable means and check local restrictions. Consider prior section 61 consent for the proposed method and hours; comply with any section 60 notice.
Instrument or official source · Supporting official guidance
Controls: Construction noise and vibration plan
Expected evidence: Predictions, method, consent or notice conditions, monitoring and change review
Review owner: Project manager
Completed applicability decision: Conditional; prior consent covers its specified work and conditions rather than every future activity.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-026 Clean Air Act 1993 and applicable local smoke controls
Jurisdiction: GB with local designations
Applicability: Combustion, burning, furnaces or dust-emitting plant
Dutyholder: Occupier or plant operator and other person specified by the applicable clean-air provision
Check smoke-control and prescribed plant requirements. Do not burn site waste as a routine disposal method; waste and nuisance duties apply separately.
Instrument or official source · Supporting official guidance
Controls: Plant selection and no-uncontrolled-burning arrangement
Expected evidence: Plant specification, relevant approvals and boundary observations
Review owner: Site manager
Completed applicability decision: Conditional; no general construction bonfire permission is established.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-027 Environmental Damage Prevention and Remediation England Regulations 2015
Jurisdiction: England
Applicability: Imminent threat of or actual qualifying environmental damage
Dutyholder: Operator of the activity causing the qualifying threat or environmental damage
Take practicable preventive action and notify the appropriate authority when required. Coordinate remediation duties with permit and incident-reporting requirements.
Instrument or official source · Supporting official guidance
Controls: Environmental emergency and escalation plan
Expected evidence: Event facts, response chronology, regulator communication and remediation evidence
Review owner: Contracts / operations manager
Completed applicability decision: Conditional; a spill log alone does not resolve potential statutory damage duties.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-028 Environmental Damage Prevention and Remediation Wales Regulations 2009 and Environmental Liability Scotland Regulations 2009
Jurisdiction: Wales and Scotland respectively
Applicability: Qualifying environmental damage or imminent threat at a devolved project
Dutyholder: Operator of the activity within the relevant national environmental-liability regime
Apply the correct national prevention, notification and remediation framework with NRW or SEPA; record the event-specific threshold assessment.
Instrument or official source · Supporting official guidance
Controls: National environmental emergency overlay
Expected evidence: Damage assessment, competent advice, notifications and agreed remediation
Review owner: Contracts / operations manager
Completed applicability decision: Nation overlay; do not apply the England instrument as if it covers all GB.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-029 Environmental Protection Act 1990 Part IIA and national contaminated-land regulations
Jurisdiction: GB with separate implementing regulations
Applicability: Brownfield development, unexpected contamination or remediation
Dutyholder: Appropriate person under the contaminated-land regime and the developer or remediation dutyholder under project controls
Coordinate planning remediation, worker exposure and waste classification. Establish responsibilities and approved remediation criteria; do not equate planning discharge with every other legal duty.
Instrument or official source · Supporting official guidance
Controls: Ground-investigation and remediation strategy
Expected evidence: Investigation, conceptual site model, verification and planning-condition acceptance
Review owner: Project manager
Completed applicability decision: Conditional; unexpected suspect material remains isolated while the strategy is resolved.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-096 Environmental Permitting England and Wales Regulations 2016 medium combustion plant and specified-generator provisions
Jurisdiction: England and Wales
Applicability: Temporary power, boilers or generator combinations meet the applicable scope
Dutyholder: Actual operator of the combustion plant or specified generator installation
Screen rated thermal input, aggregation, age, operating purpose and exclusions for both MCP and specified-generator controls; obtain any required permit before the relevant deadline or operation.
Instrument or official source · Supporting official guidance
Controls: Temporary-power procurement and consent schedule
Expected evidence: Plant inventory and ratings, applicability assessment, permit and emission-monitoring requirements
Review owner: Contracts / operations manager
Completed applicability decision: Conditional; a hired generator or emergency-use description does not itself establish exclusion.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
Ecology and resources
EN-030 Wildlife and Countryside Act 1981 and Conservation of Habitats and Species Regulations 2017
Jurisdiction: England and Wales with national licensing
Applicability: Bats, nesting birds or other protected species and habitats may be affected
Dutyholder: Any person carrying out potentially prohibited acts; relevant licence holder and developer
Obtain competent surveys, avoid prohibited harm and obtain any necessary species or site permission before disturbing works. Planning consent alone is insufficient.
Instrument or official source · Supporting official guidance
Controls: Ecology and seasonal work plan
Expected evidence: Surveys, licence conditions, exclusion boundaries and ecological supervision records
Review owner: Project manager
Completed applicability decision: Conditional; stop affected work on unexpected protected-species evidence.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-031 Wildlife and Countryside Act 1981 and Conservation Natural Habitats etc Regulations 1994 as amended
Jurisdiction: Scotland
Applicability: Scottish work may affect protected species or designated sites
Dutyholder: Any person carrying out potentially prohibited acts under Scottish law and relevant licence holder
Use Scottish conservation law and NatureScot licensing; establish survey scope and seasonal restrictions before vegetation clearance or demolition.
Instrument or official source · Supporting official guidance
Controls: Scottish ecology overlay
Expected evidence: Ecologist advice, licence, method and habitat-protection checks
Review owner: Project manager
Completed applicability decision: Scottish overlay; English licence evidence cannot automatically cover Scottish work.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-032 Fluorinated Greenhouse Gases Regulations 2015 and applicable assimilated F-gas rules
Jurisdiction: GB
Applicability: Installation, servicing or decommissioning of air conditioning, refrigeration or heat pumps
Dutyholder: Equipment operator, certified service company and qualified individual according to the activity
Check individual qualifications, company certification where required, recovery and equipment leak-check duties. Allocate operator and specialist responsibilities.
Instrument or official source · Supporting official guidance
Controls: Specialist contractor acceptance and handover
Expected evidence: Certification scope, refrigerant inventory, recovery and leakage records
Review owner: Procurement lead
Completed applicability decision: Conditional; purchasing a service does not demonstrate the actual firm's certification.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-033 Ozone-Depleting Substances Regulations 2015 and applicable assimilated ozone rules
Jurisdiction: GB
Applicability: Refurbishment removes older cooling equipment or insulation containing controlled substances
Dutyholder: Equipment operator and appropriately qualified recovery or servicing specialist
Identify the material and use authorised recovery and waste routes with appropriately qualified specialists; check current restrictions before handling.
Instrument or official source · Supporting official guidance
Controls: Refurbishment hazardous-material and waste plan
Expected evidence: Survey, specialist competence, recovery and destruction or disposal records
Review owner: Project manager
Completed applicability decision: Conditional on material; do not vent refrigerant during strip-out.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-034 Waste Electrical and Electronic Equipment Regulations 2013 and Waste Batteries and Accumulators Regulations 2009
Jurisdiction: GB baseline; role-specific UK provisions
Applicability: Strip-out of electrical equipment and batteries; possible producer or distributor roles
Dutyholder: Waste holder; producer or distributor where that separate market role is undertaken
Segregate hazardous components and use authorised routes. Separately screen producer and take-back obligations when importing or placing products on the market.
Instrument or official source · Supporting official guidance
Controls: Electrical strip-out and procurement arrangements
Expected evidence: Waste assessment, treatment route and role-specific producer compliance evidence
Review owner: Procurement lead
Completed applicability decision: Waste-holder duties apply; producer status cannot be inferred from employee count.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-035 Producer Responsibility Obligations Packaging and Packaging Waste Regulations 2024
Jurisdiction: UK; verify scheme and reporting role
Applicability: BuildOut imports, supplies or handles packaging in a qualifying producer role
Dutyholder: Qualifying packaging producer or importer under the applicable scheme role
Screen actual packaging activity, turnover and tonnage against current thresholds and role definitions before deciding reporting, fees or registration duties.
Instrument or official source · Supporting official guidance
Controls: Procurement and packaging-data assessment
Expected evidence: Role analysis, turnover and tonnage evidence, returns and registration if required
Review owner: Managing director / board
Completed applicability decision: Conditional; turnover and packaging tonnage are unknown, so no exemption or liability is invented.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-036 Town and Country Planning Act 1990 Schedule 7A and England biodiversity-gain regulations as amended
Jurisdiction: England
Applicability: Development subject to the biodiversity gain condition
Dutyholder: Planning permission applicant or developer and the party bound by habitat obligations
Check current exemptions and transitional rules. Obtain approval of the required gain plan before commencement and deliver the secured habitat measures and maintenance obligations.
Instrument or official source · Supporting official guidance
Controls: Development planning and habitat-management plan
Expected evidence: Approved gain plan, metric, obligations and habitat-monitoring evidence
Review owner: Project manager
Completed applicability decision: Conditional; do not apply England's statutory BNG regime to Scotland or Wales.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
Planning and construction consents
PL-037 Town and Country Planning Act 1990 and relevant development-management orders
Jurisdiction: England and Wales; separate national orders
Applicability: Development, change of use or external alterations beyond permitted rights
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Establish permission or lawful permitted-development basis, prior approvals and conditions. Allocate discharge responsibilities and track pre-commencement conditions.
Instrument or official source · Supporting official guidance
Controls: Project mobilisation and consent schedule
Expected evidence: Decision notice, approved drawings, condition discharge and change assessment
Review owner: Project manager
Completed applicability decision: Applies by project; a client instruction does not establish planning authority.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-038 Town and Country Planning Scotland Act 1997 and Scottish planning regulations
Jurisdiction: Scotland
Applicability: Scottish development, material change of use or controlled works
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Confirm planning permission, permitted rights, prior notification or approval and all conditions using the Scottish authority route.
Instrument or official source · Supporting official guidance
Controls: Scottish project consent schedule
Expected evidence: Planning decision, conditions, drawings and pre-start discharge evidence
Review owner: Project manager
Completed applicability decision: Scottish overlay; assess each new location before mobilisation.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-039 Town and Country Planning Environmental Impact Assessment Regulations 2017 and Welsh and Scottish 2017 EIA regulations
Jurisdiction: Respective GB nation
Applicability: Development falls within EIA screening or mandatory assessment categories
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Resolve the national screening or scoping process and environmental assessment before the relevant consent; do not assume a small fit-out and a residential development have identical triggers.
Instrument or official source · Supporting official guidance
Controls: Development feasibility and planning assessment
Expected evidence: Screening opinion, environmental statement where required and mitigation commitments
Review owner: Project manager
Completed applicability decision: Conditional on project and sensitivity; no EIA determination is invented.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-040 Planning Listed Buildings and Conservation Areas Act 1990
Jurisdiction: England
Applicability: Refurbishment affects a listed building's character or protected conservation-area works
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Obtain listed-building and other required consents for the exact alterations; internal work can be controlled. Coordinate discovery and design changes with the authority.
Instrument or official source · Supporting official guidance
Controls: Heritage design and consent schedule
Expected evidence: List status, consent, approved details and conservation method evidence
Review owner: Project manager
Completed applicability decision: Conditional; standard planning permission does not replace listed-building consent.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-041 Historic Environment Wales Act 2023
Jurisdiction: Wales
Applicability: Welsh listed building, scheduled monument or other protected historic asset
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Identify the current Welsh heritage consent route and conditions before intrusive or character-affecting work; involve the relevant authority and Cadw as appropriate.
Instrument or official source · Supporting official guidance
Controls: Welsh heritage consent schedule
Expected evidence: Designation check, specialist design and granted consent conditions
Review owner: Project manager
Completed applicability decision: Welsh overlay; do not assume the former England and Wales 1990 framework is the current Welsh instrument.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-042 Planning Listed Buildings and Conservation Areas Scotland Act 1997 and Ancient Monuments and Archaeological Areas Act 1979
Jurisdiction: Scotland
Applicability: Works affect a Scottish listed building, conservation area or scheduled monument
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Establish the separate listed-building or scheduled-monument consent and protect archaeological findings; use Scottish authority and Historic Environment Scotland routes.
Instrument or official source · Supporting official guidance
Controls: Scottish heritage and discovery plan
Expected evidence: Designation, consent, approved method and archaeological records
Review owner: Project manager
Completed applicability decision: Conditional Scottish overlay; hold affected work until consent scope is established.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-043 Town and Country Planning Act 1990 tree controls and Scottish planning and forestry controls
Jurisdiction: Relevant nation and local designations
Applicability: Tree work, site clearance or excavations may affect protected trees
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Check preservation orders, conservation-area notification, felling permission and planning protection conditions with the correct authority before disturbance.
Instrument or official source · Supporting official guidance
Controls: Tree-protection and clearance plan
Expected evidence: Designation check, arboricultural advice, consent and root-protection inspections
Review owner: Project manager
Completed applicability decision: Conditional; ownership of a tree does not establish permission to remove it.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-044 Party Wall etc Act 1996
Jurisdiction: England and Wales
Applicability: Works to party structures, boundary walls or nearby excavations trigger the Act
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Identify notices, adjoining-owner rights and dispute-resolution requirements in time. Coordinate access and awards with the construction method.
Instrument or official source · Supporting official guidance
Controls: Design and adjoining-owner interface plan
Expected evidence: Notice service, agreement or award, condition survey and method restrictions
Review owner: Project manager
Completed applicability decision: Conditional; planning or building-control approval does not replace party-wall procedures.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-045 Highways Act 1980
Jurisdiction: England and Wales
Applicability: Scaffolds, hoarding, skips, materials or other occupation of public highway
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Obtain the relevant highway licence or permission and maintain lighting, barriers, accessibility and conditions for its location and duration.
Instrument or official source · Supporting official guidance
Controls: Site logistics and public-protection plan
Expected evidence: Highway licence, layout, expiry and daily public-interface checks
Review owner: Site manager
Completed applicability decision: Conditional; a scaffold inspection is separate from a highway occupation licence.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-046 New Roads and Street Works Act 1991 and Traffic Management Act 2004 permit provisions
Jurisdiction: Relevant nation and local scheme
Applicability: Opening a street, installing apparatus or working within a street-works permit scheme
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Establish the correct undertaker or section 50 licence route, competent operatives, notices or permits, signing and reinstatement requirements.
Instrument or official source · Supporting official guidance
Controls: Street-works and traffic-management plan
Expected evidence: Licence or permit, qualifications, traffic arrangements and reinstatement records
Review owner: Project manager
Completed applicability decision: Conditional; distinguish private-site excavation from regulated street works.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-047 Roads Scotland Act 1984 and applicable street-works rules
Jurisdiction: Scotland
Applicability: Scottish road occupation, excavation, scaffolding or temporary restriction
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Obtain road-authority permissions and follow the applicable register, coordination, traffic-management and reinstatement duties.
Instrument or official source · Supporting official guidance
Controls: Scottish road and public-interface plan
Expected evidence: Authority permission, notices, qualifications and reinstatement acceptance
Review owner: Project manager
Completed applicability decision: Scottish overlay; an England highway licence does not authorise Scottish road works.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-048 Building Act 1984 sections 80 to 83
Jurisdiction: England and Wales
Applicability: Demolition within the statutory notice scope
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Check exemptions and give the required notice; comply with the local authority's counter-notice and service-disconnection conditions before demolition.
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-DEM; demolition consent schedule
Expected evidence: Demolition notice, authority response, disconnections and method acceptance
Review owner: Project manager
Completed applicability decision: Conditional; allow the statutory notice process rather than assuming immediate start.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-049 Building Scotland Act 2003 and Building Scotland Regulations 2004
Jurisdiction: Scotland
Applicability: Building work, conversion or demolition requiring a warrant
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Obtain the warrant before work, agree notification and inspections, obtain amendments for controlled changes and submit completion evidence.
Instrument or official source · Supporting official guidance
Controls: Design control and Scottish building-warrant schedule
Expected evidence: Warrant, approved plans, notifications, amendment and completion-certificate acceptance
Review owner: Project manager
Completed applicability decision: Scottish overlay; the English building-control route is not transferable.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-050 Building Higher-Risk Buildings Procedures England Regulations 2023 and linked higher-risk building regulations
Jurisdiction: England
Applicability: Work falls within the higher-risk building control regime
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Resolve the actual scope, BSR approval before controlled work, change control, mandatory occurrence reporting and completion requirements. CDM and building-regulations appointments remain distinct.
Instrument or official source · Supporting official guidance
Controls: Design and building-control plan; HRB gateway schedule
Expected evidence: Role appointments, BSR approval, controlled changes, golden-thread and completion evidence
Review owner: Project manager
Completed applicability decision: Conditional; residential work alone does not prove HRB status or gateway approval.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-051 Building Safety Levy England Regulations 2025
Jurisdiction: England
Applicability: Qualifying new residential building-control application from 1 October 2026
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Screen levy scope, exclusions, application date, liable developer and payment requirements; include the levy assessment in project finance and completion planning.
Instrument or official source · Supporting official guidance
Controls: Development mobilisation and commercial consent schedule
Expected evidence: Application validity, levy assessment, exemption rationale or payment evidence
Review owner: Managing director / board
Completed applicability decision: Conditional; current England requirement, separate from a future Scottish levy.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-052 Flood and Water Management Act 2010 Schedule 3 and Welsh sustainable-drainage regulations
Jurisdiction: Wales
Applicability: Construction with drainage implications within Welsh SAB approval scope
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Resolve Sustainable Drainage Approval Body approval, adoption and maintenance requirements before construction where triggered; coordinate planning separately.
Instrument or official source · Supporting official guidance
Controls: Welsh drainage design and consent schedule
Expected evidence: SAB approval, approved drainage, inspection and maintenance arrangements
Review owner: Project manager
Completed applicability decision: Conditional Welsh overlay; do not assume planning approval covers SAB approval.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-053 Water Supply Water Fittings Regulations 1999 and Scottish water-fittings byelaws
Jurisdiction: Respective nation
Applicability: Installation or alteration of water fittings and temporary welfare supplies
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Prevent contamination and backflow, use suitable fittings and submit water-undertaker notification where required before the installation.
Instrument or official source · Supporting official guidance
Controls: Water hygiene and services installation plan
Expected evidence: Design, notifications, installer competence, flushing and commissioning evidence
Review owner: Project manager
Completed applicability decision: Conditional; building-control acceptance does not replace water-supply duties.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-054 Marine and Coastal Access Act 2009 and Marine Scotland Act 2010
Jurisdiction: Relevant marine jurisdiction
Applicability: Construction, deposits, removal or dredging within marine licensing scope
Dutyholder: Client or developer and the relevant designer, contractor, applicant or consent holder according to the consent regime
Check marine location, activity, exclusions and the responsible regulator; obtain the required marine licence and coordinate habitats and navigation permissions.
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-WAT; marine consent schedule
Expected evidence: Licence, consented method, conditions, monitoring and navigation arrangements
Review owner: Project manager
Completed applicability decision: Conditional specialist scope; no marine authorisation is assumed for inland work.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
PL-097 Planning Hazardous Substances Act 1990 and Planning Hazardous Substances Scotland Act 1997 with national hazardous-substances regulations
Jurisdiction: Relevant GB nation
Applicability: Hazardous substances stored or used at or above controlled quantities
Dutyholder: Person in control of the hazardous substances or other person requiring the national consent
Determine substance categories, aggregation, exemptions and the hazardous substances authority's consent requirements; assess COMAH separately. Client-site inventories and proposed temporary stores must be considered together where the law requires.
Instrument or official source · Supporting official guidance
Controls: Site inventory and hazardous-substances consent schedule
Expected evidence: Inventory, quantity assessment, consent and conditions or documented non-applicability
Review owner: Project manager
Completed applicability decision: Conditional; an environmental permit, DSEAR assessment or COMAH review is not automatically hazardous-substances consent.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
People and employment
HR-055 Employment Rights Act 1996 as amended including commenced Employment Rights Act 2025 provisions
Jurisdiction: GB baseline
Applicability: Direct employment, payroll, dismissal and employment changes
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Provide required particulars and apply current pay, leave, dismissal, redundancy and other protections. Check commencement and eligibility for the specific decision rather than treating every 2025 Act provision as in force.
Instrument or official source · Supporting official guidance
Controls: HR employment and change arrangements
Expected evidence: Contracts, particulars, decision records, notices and payroll evidence
Review owner: HR lead
Completed applicability decision: Applies to employees; assess actual employment status and current commenced provisions.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-056 Working Time Regulations 1998 as amended
Jurisdiction: GB
Applicability: Site shifts, travel arrangements, overtime and annual leave
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Control working hours and rest; apply lawful exceptions and compensatory rest where available. Keep adequate records and apply separate young-worker restrictions.
Instrument or official source · Supporting official guidance
Controls: BOUK-RA-OCC-02; hours and leave arrangements
Expected evidence: Working-time records, valid agreements, rest and holiday records
Review owner: HR lead
Completed applicability decision: Applies; a signed opt-out does not remove all rest or fatigue duties.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-057 National Minimum Wage Act 1998 and National Minimum Wage Regulations 2015 as amended
Jurisdiction: UK with applicable rate and worker rules
Applicability: Paying workers, apprentices and deductions for equipment or travel
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Apply the current rate and pay-reference rules to actual working time and deductions; review apprentices, accommodation and salaried-hour arrangements.
Instrument or official source · Supporting official guidance
Controls: Payroll and worker-status controls
Expected evidence: Hours, payroll calculations, age and apprenticeship checks, deduction records
Review owner: HR lead
Completed applicability decision: Applies where worker status qualifies; no fixed rate is embedded in this register.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-058 Equality Act 2010 and Worker Protection Amendment of Equality Act 2010 Act 2023 as amended
Jurisdiction: GB
Applicability: Recruitment, employment, harassment prevention and disabled-worker access
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Prevent unlawful discrimination and harassment, make reasonable adjustments and apply the current preventative sexual-harassment duty. Check staged amendments before changing the legal test.
Instrument or official source · Supporting official guidance
Controls: HR dignity, recruitment and adjustment arrangements
Expected evidence: Risk assessment, reporting route, adjustments, training and investigation actions
Review owner: HR lead
Completed applicability decision: Applies; agency and site interfaces require coordinated prevention.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-059 Immigration Asylum and Nationality Act 2006 and applicable right-to-work rules
Jurisdiction: UK
Applicability: Employing people and checking permission to work
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Complete the prescribed right-to-work check before employment and repeat where required; avoid discrimination and use the correct online or document process.
Instrument or official source · Supporting official guidance
Controls: Recruitment and restricted personnel records
Expected evidence: Dated check evidence, permission conditions and follow-up control
Review owner: HR lead
Completed applicability decision: Applies; subcontractor assurance does not justify copying unrelated personal records.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-060 Pensions Act 2008 and automatic-enrolment regulations
Jurisdiction: UK
Applicability: BuildOut employs staff who may meet enrolment criteria
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Assess eligibility, enrol and contribute where required, communicate with staff and complete the declaration and re-enrolment duties.
Instrument or official source · Supporting official guidance
Controls: Payroll and workplace-pension arrangement
Expected evidence: Eligibility assessment, contributions, communications and declaration evidence
Review owner: HR lead
Completed applicability decision: Applies as employer; current ages and earnings must be checked against actual staff.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-061 Social Security Contributions and Benefits Act 1992 and Statutory Sick Pay General Regulations 1982 as amended
Jurisdiction: GB baseline
Applicability: Employee sickness and payroll processing
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Apply current SSP eligibility, calculation, evidence and payment rules, including commenced 2026 reforms; keep health detail restricted and separate from shared trackers.
Instrument or official source · Supporting official guidance
Controls: Sickness-pay and occupational-health interface
Expected evidence: Payroll calculation, restricted absence evidence and statutory communications
Review owner: HR lead
Completed applicability decision: Applies by eligibility; do not reuse obsolete waiting-day or earnings-limit assumptions.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-062 Maternity and Parental Leave etc Regulations 1999 and paternity and shared-parental-leave legislation as amended
Jurisdiction: GB baseline
Applicability: Pregnancy, family leave and return to work
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Apply current notice, leave, pay, detriment and return rights with the appropriate risk assessment. Check the leave type and commenced reforms separately from statutory-pay eligibility.
Instrument or official source · Supporting official guidance
Controls: HR family-leave and work-adjustment arrangement
Expected evidence: Requests, eligibility decisions, restricted risk assessment and payroll evidence
Review owner: HR lead
Completed applicability decision: Conditional on circumstances; leave and pay eligibility are separate decisions.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-063 Agency Workers Regulations 2010 and Conduct of Employment Agencies and Employment Businesses Regulations 2003
Jurisdiction: GB
Applicability: Agency labour supplied to projects or offices
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Coordinate day-one facilities and vacancy access, qualifying equal-treatment rights and information duties with the agency; verify any specialist safety needs.
Instrument or official source · Supporting official guidance
Controls: Agency-worker procurement and induction
Expected evidence: Assignment terms, qualifying period, comparator information and safety handover
Review owner: Procurement lead
Completed applicability decision: Conditional on agency labour; a supplier agreement alone does not demonstrate equal treatment.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-064 Transfer of Undertakings Protection of Employment Regulations 2006
Jurisdiction: GB
Applicability: Business transfer or qualifying service-provision change
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Determine TUPE applicability before tender, transfer or restructuring; meet information, consultation and employee-liability-information duties.
Instrument or official source · Supporting official guidance
Controls: Commercial change and HR transfer plan
Expected evidence: Applicability advice, employee information and consultation records
Review owner: HR lead
Completed applicability decision: Conditional; no transfer is established in the current fictional profile.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-065 Trade Union and Labour Relations Consolidation Act 1992 as amended
Jurisdiction: GB
Applicability: Union relations, collective consultation, redundancy or industrial action
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Apply current recognition, consultation and representation protections; assess collective-redundancy triggers and current commencement rules before action.
Instrument or official source · Supporting official guidance
Controls: HR consultation and organisational-change plan
Expected evidence: Workforce assessment, consultation, notices and retained decisions
Review owner: HR lead
Completed applicability decision: Applies when triggered; upcoming 30 October 2026 reforms are tracked separately.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-066 Public Interest Disclosure Act 1998 amendments to Employment Rights Act 1996
Jurisdiction: GB
Applicability: Workers raise protected concerns about wrongdoing or unsafe practices
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Provide a workable disclosure route and protect qualifying disclosures from unlawful detriment or dismissal; distinguish investigation from retaliation.
Instrument or official source · Supporting official guidance
Controls: Whistleblowing and incident-escalation arrangements
Expected evidence: Restricted disclosure handling, impartial enquiry and corrective-action evidence
Review owner: HR lead
Completed applicability decision: Applies where protection criteria are met; confidentiality cannot suppress statutory reporting.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-067 Income Tax Earnings and Pensions Act 2003 employment-status and off-payroll provisions
Jurisdiction: UK
Applicability: Engaging self-employed trades, personal service companies or labour intermediaries
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Assess employment and tax status using actual arrangements. Screen the off-payroll rules and company-size conditions; keep tax and employment-rights assessments distinct.
Instrument or official source · Supporting official guidance
Controls: Labour procurement and status assessment
Expected evidence: Contracts, working-practice evidence, status decisions and payroll treatment
Review owner: Managing director / board
Completed applicability decision: Conditional; employee count alone does not determine every off-payroll obligation.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
HR-068 Finance Act 2004 construction industry scheme provisions and implementing regulations
Jurisdiction: UK
Applicability: BuildOut pays subcontractors for construction operations
Dutyholder: BuildOut as employer, engager or hirer according to worker status and the relevant provision
Determine CIS contractor and subcontractor status, verify payees, apply correct deductions, issue statements and make returns; assess exclusions against actual work.
Instrument or official source · Supporting official guidance
Controls: Subcontractor procurement and payment controls
Expected evidence: Verification, payment and deduction statements, returns and reconciliation
Review owner: Managing director / board
Completed applicability decision: Applies where CIS contractor duties are triggered; CIS treatment does not prove employment status.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
Company and commercial
CO-069 Companies Act 2006 as amended
Jurisdiction: UK
Applicability: BuildOut operates as a limited company
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Maintain required company records, statutory accounts and filings; fulfil directors' duties and update current Companies House identity-verification and filing requirements.
Instrument or official source · Supporting official guidance
Controls: Corporate governance and statutory-filings calendar
Expected evidence: Company records, filing receipts, accounts and director verification where required
Review owner: Managing director / board
Completed applicability decision: Applies; the management-system library is separate from statutory corporate records.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-070 Corporate Manslaughter and Corporate Homicide Act 2007
Jurisdiction: UK
Applicability: Serious management failures cause a death within the Act's scope
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Maintain effective senior management oversight of the duty of care, resources and assurance; escalate systemic critical-control failures.
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-GOV; management review and assurance plan
Expected evidence: Board decisions, resourcing, risk-based checks and verified corrective actions
Review owner: Managing director / board
Completed applicability decision: Applies as a corporate exposure; a policy signature alone does not demonstrate safe management.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-071 Bribery Act 2010
Jurisdiction: UK with relevant territorial scope
Applicability: Tendering, procurement, gifts and subcontractor relationships
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Prevent bribery and establish proportionate procedures addressing associated-person risks; investigate concerns and maintain decision transparency.
Instrument or official source · Supporting official guidance
Controls: Procurement integrity and gifts arrangement
Expected evidence: Due diligence, conflict declarations, approval and investigation records
Review owner: Managing director / board
Completed applicability decision: Applies; no supplier approval or anti-bribery certification is invented.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-072 Modern Slavery Act 2015
Jurisdiction: UK with provision-specific extent
Applicability: Labour supply-chain exploitation; possible section 54 statement duty
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Prevent forced labour and screen supply chains. Separately test section 54 commercial-organisation and turnover requirements before deciding statement duties.
Instrument or official source · Supporting official guidance
Controls: Labour and supply-chain due diligence
Expected evidence: Supplier checks, worker concerns and documented turnover/applicability assessment
Review owner: Procurement lead
Completed applicability decision: Offence risks apply; section 54 threshold cannot be determined from 50 employees alone.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-073 Economic Crime and Corporate Transparency Act 2023 failure-to-prevent-fraud provisions
Jurisdiction: UK with relevant extent
Applicability: Organisation-size thresholds and associated-person fraud risks
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Screen the statutory size test and relevant accounting period, including group rules; if in scope establish reasonable fraud-prevention procedures.
Instrument or official source · Supporting official guidance
Controls: Corporate and procurement fraud-risk controls
Expected evidence: Size assessment, fraud-risk review, procedures and investigation evidence
Review owner: Managing director / board
Completed applicability decision: Conditional; revenue and balance-sheet data are unknown, so no large-organisation duty is asserted.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-074 Income Tax PAYE Regulations 2003 and social-security contributions legislation
Jurisdiction: UK
Applicability: Paying employees and taxable benefits
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Operate PAYE and National Insurance, report and pay on the applicable schedule and keep required payroll records; coordinate pensions and statutory payments.
Instrument or official source · Supporting official guidance
Controls: Payroll compliance calendar
Expected evidence: Real-time submissions, reconciliations, payment and year-end records
Review owner: Managing director / board
Completed applicability decision: Applies as employer; use current rates and thresholds rather than static example rates.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-075 Value Added Tax Act 1994 and applicable construction reverse-charge rules
Jurisdiction: UK
Applicability: Taxable construction supplies, development or subcontract payments
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Determine VAT registration, supply liability and any domestic reverse charge or end-user treatment from actual transactions and current rules.
Instrument or official source · Supporting official guidance
Controls: Commercial tax and invoicing controls
Expected evidence: Registration assessment, customer status, invoices, returns and tax advice
Review owner: Managing director / board
Completed applicability decision: Conditional on transaction and registration; the profile does not establish turnover or tax treatment.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-076 Consumer Rights Act 2015 and applicable consumer-contract rules
Jurisdiction: UK with provision-specific scope
Applicability: Residential work or other contracts with consumers
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Apply service quality, fair terms, information, cancellation and remedies where the contract is a consumer transaction; coordinate sector-specific duties.
Instrument or official source · Supporting official guidance
Controls: Contract review and customer handover
Expected evidence: Contract classification, terms, notices, variation and defect-resolution records
Review owner: Contracts / operations manager
Completed applicability decision: Conditional; a commercial retail-client contract is not automatically a consumer contract.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-077 Housing Grants Construction and Regeneration Act 1996 as amended
Jurisdiction: GB with scope and residential-occupier exclusions
Applicability: Construction contracts within the statutory payment and adjudication regime
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Check scope, compliant payment and notice provisions and adjudication rights; use the applicable national scheme where contractual terms fail.
Instrument or official source · Supporting official guidance
Controls: Construction contract and payment controls
Expected evidence: Contract review, payment applications, notices and dispute records
Review owner: Contracts / operations manager
Completed applicability decision: Conditional; assess exclusions rather than treating all residential work identically.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-078 Defective Premises Act 1972 as amended and Building Safety Act 2022 provisions
Jurisdiction: England and Wales with provision-specific scope
Applicability: Construction, conversion or qualifying work to dwellings
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Check duty to provide workmanlike or professional work with proper materials and fitness for habitation, including relevant extensions and limitation rules.
Instrument or official source · Supporting official guidance
Controls: Design quality, completion and defects arrangements
Expected evidence: Design decisions, product traceability, inspections, handover and defect remediation
Review owner: Contracts / operations manager
Completed applicability decision: Conditional on dwelling work and provision; no universal defect-liability period is assumed.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-079 Construction Products Regulations 2013 and applicable construction-product rules as amended
Jurisdiction: GB baseline; NI separate market rules
Applicability: Specifying, procuring or supplying construction products
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Verify current conformity route, performance declarations and intended use; distinguish manufacturer, importer and distributor duties and preserve traceability.
Instrument or official source · Supporting official guidance
Controls: Design specification and procurement controls
Expected evidence: Product identity, declared performance, conformity and installation evidence
Review owner: Procurement lead
Completed applicability decision: Applies by role and product; a conformity mark does not establish suitability for this design.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-080 Supply of Machinery Safety Regulations 2008 as amended
Jurisdiction: GB baseline
Applicability: BuildOut supplies, substantially modifies or brings machinery into service in a relevant role
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Assess product-supply responsibilities and conformity before supply or commissioning; retain safe instructions and required technical documentation. PUWER remains separate for use.
Instrument or official source · Supporting official guidance
Controls: Plant procurement and management of change
Expected evidence: Modification review, conformity assessment, instructions and commissioning evidence
Review owner: Contracts / operations manager
Completed applicability decision: Conditional; hiring ordinary compliant plant differs from becoming a machinery manufacturer.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-081 UK REACH and GB Classification Labelling and Packaging rules
Jurisdiction: GB; NI separate chemicals framework
Applicability: Importing, formulating or supplying chemicals as well as using paints and treatments
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Identify the actual supplier or downstream-user role. Obtain current safety data and classification; assess any registration, restriction or authorisation before importing or use.
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-COSHH; chemical procurement controls
Expected evidence: Supplier and role assessment, safety data, restrictions and exposure controls
Review owner: Procurement lead
Completed applicability decision: Conditional role duties; COSHH assessment does not replace chemicals-market duties.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CO-085 Privacy and Electronic Communications EC Directive Regulations 2003 as amended
Jurisdiction: UK
Applicability: Business marketing, cookies and electronic communications within scope
Dutyholder: BuildOut and its directors or the relevant contracting, supplier or tax role as specified
Check consent or other permitted route for the activity, provide required information and respect objections; coordinate with UK GDPR duties and current amendments.
Instrument or official source · Supporting official guidance
Controls: Data protection and business communications arrangement
Expected evidence: Processing assessment, privacy information, consent where required and suppression records
Review owner: Managing director / board
Completed applicability decision: Conditional on communications activity; a general privacy notice is not universal consent.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
Vehicles and public protection
TR-082 Road Traffic Act 1988 and road-vehicle construction and use requirements
Jurisdiction: GB
Applicability: Company driving, deliveries and movement on public roads
Dutyholder: Vehicle operator, employer, driver or occupier according to the activity
Ensure lawful drivers, roadworthy vehicles, insurance, safe loads and suitable driving arrangements; assess work-related road risk and site-to-highway interfaces.
Instrument or official source · Supporting official guidance
Controls: Fleet and delivery arrangements
Expected evidence: Licence and insurance checks, maintenance, load security and driving-risk records
Review owner: Contracts / operations manager
Completed applicability decision: Applies to public-road use; site induction does not replace road-law compliance.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
TR-083 Goods Vehicles Licensing of Operators Act 1995 and applicable drivers-hours and tachograph rules
Jurisdiction: GB with operation-specific scope
Applicability: Goods vehicles or combinations fall within operator-licensing and hours regimes
Dutyholder: Vehicle operator, employer, driver or occupier according to the activity
Assess actual weights, use and exemptions; obtain the correct operator licence where required, maintain systems and comply with applicable hours and recording rules.
Instrument or official source · Supporting official guidance
Controls: Fleet compliance and haulage procurement
Expected evidence: Vehicle and route assessment, operator licence, maintenance and driver records
Review owner: Contracts / operations manager
Completed applicability decision: Conditional; do not infer exemption because journeys are short or vehicles support construction.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
TR-084 Occupiers Liability Acts 1957 and 1984 and Occupiers Liability Scotland Act 1960
Jurisdiction: Relevant GB nation
Applicability: BuildOut controls premises, site access or visitor interfaces
Dutyholder: Vehicle operator, employer, driver or occupier according to the activity
Apply the relevant duty to visitors and others, secure changing works and coordinate responsibility with clients and other occupiers.
Instrument or official source · Supporting official guidance
Controls: Site security and public-protection plan
Expected evidence: Access assessment, boundary checks, warnings and incident follow-up
Review owner: Site manager
Completed applicability decision: Applies according to control and circumstances; use the Scottish Act for Scottish sites.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
Other operating interfaces
EN-086 Food Safety Act 1990 and applicable national food-hygiene regulations
Jurisdiction: Relevant GB nation
Applicability: BuildOut itself runs a qualifying catering or food-business operation
Dutyholder: Actual food-business operator; BuildOut only where it takes that operating role
Establish food-business registration and hygiene duties if operating catering. Contracted catering still needs a suitable supplier and safe welfare interface.
Instrument or official source · Supporting official guidance
Controls: Welfare and catering procurement arrangements
Expected evidence: Operator assessment, registration where needed and hygiene-control evidence
Review owner: Contracts / operations manager
Completed applicability decision: Conditional; providing a kettle and fridge alone does not establish a catering business.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
EN-087 Licensing Act 2003 Licensing Scotland Act 2005 and Petroleum Consolidation Regulations 2014 as relevant
Jurisdiction: Relevant nation and client premises
Applicability: Work alters an operating hotel, licensed premises or fuel-storage interface
Dutyholder: Client or other actual premises licence or petroleum-certificate holder; BuildOut controls its construction interface
Identify the client's actual operating licence or certificate conditions and whether works require notification, variation or safe shutdown. Do not assume BuildOut becomes the licence holder.
Instrument or official source · Supporting official guidance
Controls: Occupied-premises and client-interface plan
Expected evidence: Client permission basis, licence-condition review, agreed limits and handover
Review owner: Project manager
Completed applicability decision: Conditional interface; construction permission is separate from the client's operating permissions.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
Other requirements
OR-088 ISO 45001 and ISO 14001 where contractually adopted
Jurisdiction: Company or contract requirement; not legislation
Applicability: Client tender or management-system commitment explicitly adopts the standard
Dutyholder: Owner of the adopted commitment and relevant contract or technical dutyholder
Identify the applicable edition, contracted scope and audit commitments; maintain evidence of implementation without describing certification as universally required by law.
Instrument or official source · Supporting official guidance
Controls: BOUK-PRO-GOV; assurance plan and contract review
Expected evidence: Contract clause, objectives, audit findings and verified improvements
Review owner: Managing director / board
Completed applicability decision: Other requirement; only contractual or voluntary scope is asserted.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
OR-089 Relevant British Standards technical specifications and manufacturer instructions
Jurisdiction: Technical or contractual basis; check legal incorporation
Applicability: Temporary works, scaffolds, electrical work, products and specialist design
Dutyholder: Owner of the adopted commitment and relevant contract or technical dutyholder
Record the exact applicable edition and design or contract basis. Standards support competent methods; distinguish a legal incorporation from a voluntary benchmark.
Instrument or official source · Supporting official guidance
Controls: Design and specialist method acceptance
Expected evidence: Design basis, checked calculations, specified editions and acceptance criteria
Review owner: Project manager
Completed applicability decision: Other requirement; no paywalled standard is claimed reproduced or fully reviewed.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
OR-090 Approved Codes of Practice and regulator guidance relevant to the task
Jurisdiction: GB with subject and territorial scope
Applicability: An ACOP or guidance supports the chosen compliance method
Dutyholder: Owner of the adopted commitment and relevant contract or technical dutyholder
Record the current applicable ACOP or guidance. An ACOP has special evidential status; guidance and company forms are not themselves blanket statutory duties.
Instrument or official source · Supporting official guidance
Controls: Legal interpretation and technical review
Expected evidence: Applicable publication, alternative-method justification and technical acceptance
Review owner: Competent health and safety adviser
Completed applicability decision: Other requirement; keep legal duty, ACOP, guidance and internal rule distinct.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
OR-091 Project contract client rules planning conditions and actual permit conditions
Jurisdiction: Project and permission specific
Applicability: A contract or granted consent imposes a definite requirement
Dutyholder: Owner of the adopted commitment and relevant contract or technical dutyholder
Translate actual limits, notices, inspections, monitoring and handover conditions into owned site controls; resolve conflicts before releasing work.
Instrument or official source · Supporting official guidance
Controls: Project consent schedule; BOUK-PRO-GOV
Expected evidence: Signed contract, granted conditions, assigned tasks and compliance-monitoring evidence
Review owner: Project manager
Completed applicability decision: Applies when accepted or imposed; no fictional consent number or approval is supplied.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
Change watch
CW-092 Proposed England waste-exemption reforms expected from January 2027
Jurisdiction: England; not current duties solely on this proposal
Applicability: Company uses exemptions affected by the proposed reforms
Dutyholder: Waste-exemption holder or waste operator affected by the final reform
Check final parliamentary approval and commencement, then update exemption limits and transition actions. Guidance updated 21 October 2026 expressly says reforms are subject to parliamentary approval.
Instrument or official source · Supporting official guidance
Controls: Legal-change log and waste consent schedule
Expected evidence: Enacted instrument, current exemption conditions and transition assessment
Review owner: Contracts / operations manager
Completed applicability decision: Watch; do not present a proposed reform as already in force on 23 October 2026.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CW-093 Employment Rights Act 2025 staged commencement
Jurisdiction: GB; check each measure and commencement instrument
Applicability: Changes to trade union access and protections scheduled for 30 October 2026; later measures staged
Dutyholder: BuildOut as employer and other persons covered by each commenced employment provision
Prepare HR arrangements against the current official timeline and commencement instruments; distinguish measures already in force from future provisions and proposals.
Instrument or official source · Supporting official guidance
Controls: HR legal-change calendar
Expected evidence: Commencement review, revised arrangements and management communication
Review owner: HR lead
Completed applicability decision: Watch as at 23 October 2026; do not treat the 30 October package or all 2027 measures as current.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
CW-094 Building Safety Levy Scotland Act 2026 and implementing measures
Jurisdiction: Scotland; future levy commencement
Applicability: Future Scottish new residential development
Dutyholder: Developer or person made liable by the future Scottish levy provisions when commenced
Track Scottish implementation, scope, rates and commencement separately from the current England levy. Scottish Government states an intended April 2028 introduction.
Instrument or official source · Supporting official guidance
Controls: Development legal-change and commercial calendar
Expected evidence: Enacted commencement and regulations, project scope and future assessment
Review owner: Managing director / board
Completed applicability decision: Watch; no Scottish levy payment is asserted due in October 2026.
Review trigger: Before the activity or project commitment; on scope, law, permission or ownership change; before any expiry or return deadline
Source research: 2026-10-23. Next example company review: 22 November 2026; earlier statutory and pre-start dates take priority.
Completed fictional consent decisions
England bowser installation
EX E1 proposes a 1,000-litre diesel bowser. No design or installation acceptance exists.
Oil-storage requirements are triggered on the stated facts. Confirm containment, filling, fittings, impact protection and fire controls before installation. A tank volume alone does not establish a universal environmental-licence requirement.
Evidence needed: Fuel inventory and location plan; container and containment design; competent installation checks; spill pathway review.
Current position: Installation acceptance remains open; no actual inspection or permit is supplied.
England excavation water
EX E2 proposes pumping silty excavation water into a surface-water drain leading to a stream.
Identify water quality and the exact outfall. Resolve the environmental-permit route or every condition of an applicable current regulatory position. Check abstraction separately. A clear-looking sample is not discharge permission.
Evidence needed: Drain trace, water assessment, regulator basis, treatment method and monitoring criteria.
Current position: No pumping to the drain while the permission basis or control performance is unresolved.
England concrete washout
EX E3 proposes discharging concrete wash water to a foul sewer.
Resolve trade-effluent consent with the sewerage undertaker and the treatment and monitoring conditions. A connection to a foul drain does not establish consent; surface-water permitting is a different route.
Evidence needed: Written consent or a lawful alternative collection route, confirmed connection and controlled washout method.
Current position: Proposed sewer discharge remains held; no consent number is invented.
England rubble crushing
EX E4 proposes hired crushing plant for demolition rubble and assumes a T5 registration is enough.
T5 does not authorise crushing waste bricks, tiles or concrete. Resolve the applicable waste authorisation, local-authority air permit and deployment conditions, with dust and occupational exposure controls.
Evidence needed: Actual operator and plant, waste assessment, correct permissions, deployment notifications and dust-control checks.
Current position: Crushing remains held until all applicable routes are resolved.
Welsh hazardous waste
EX W1 is expected to produce 600 kg of hazardous strip-out waste within 12 months. No other premises exemption is established.
The less-than-500-kg premises-registration exemption does not fit these facts. Resolve Welsh hazardous-waste premises registration and the consignment route. If asbestos is involved, assess CAR work classification and specialist licensing separately.
Evidence needed: Classification, quantity forecast, premises registration assessment, specialist scope and authorised receiving route.
Current position: Do not treat an England-only waste process or generic carrier certificate as sufficient.
Scottish construction run-off
EX S1 has a five-hectare construction footprint and run-off to the water environment.
The stated area is outside the small-site GBR 10D route. Resolve a construction run-off permit under current EASR, including drainage and pollution-prevention controls. Other water and waste authorisations remain separate.
Evidence needed: Current SEPA scope assessment, granted authorisation, pollution-prevention plan and wet-weather verification.
Current position: No discharge under an assumed small-site rule; no actual permit or site inspection is supplied.
Occupied refurbishment survey gap
EX R1 proposes intrusive ceiling work where the available asbestos survey excludes the void.
Hold intrusion and obtain adequate scope-specific information. Classify any proposed asbestos work; licensed, notifiable non-licensed and other work are distinct decisions. A register row cannot authorise a specialist task.
Evidence needed: Survey scope, work classification, contractor licence where required, plan and appropriate clearance or handback evidence.
Current position: Intrusive task remains held; no material diagnosis or clearance is invented.
Residential and protected-site interfaces
EX D1 proposes an England residential development with a new building-control application after 1 October 2026; ecology and levy exemptions are unresolved.
Screen the current levy, planning conditions, biodiversity gain, protected species and HRB status independently. Allocate client, developer and BuildOut roles. Planning permission cannot establish every other consent.
Evidence needed: Application date and scope; levy assessment; ecology and BNG decisions; relevant building-control approvals.
Current position: Resolve each affected pre-commencement gate before releasing that activity.
Using the register
Expected evidence and completed applicability reasoning are teaching content; the Register sheet remains blank. No actual licence, inspection, signature, regulator approval or compliance determination is represented.
The 45 existing SHARE statutory mappings retain their 16 October 2026 research provenance. Added requirement and consent routes and material recent changes checked against current official sources on 23 October 2026. This is a scoped requirements catalogue, not a line-by-line consolidation audit or a certificate of legal compliance.
For a live project record the actual regulator, permission holder, number, scope, conditions, pre-start gates, legal deadlines, renewal, variation and surrender requirements. An internal permit-to-work, a statutory licence and an environmental consent are different controls.