Identify hazards and affected people, select controls, verify competence and reassess changing conditions.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

BOUK-PRO-RISK | Version 1.0 | 23 October 2026 | GB baseline

COMPLETED FICTIONAL EXAMPLE. BuildOut UK Ltd is an illustrative construction business. The arrangements and cases below are examples for adaptation; no actual work, approval or signature is represented.

Identify hazards and affected people, select controls, verify competence and reassess changing conditions.

Scope and operating responsibility

We apply this procedure to Multi-trade occupied-building refurbishment. Evidence includes Task assessment; RAMS review and briefing; interface review; critical-control release check; change and hand-back decisions. The role controlling the task checks applicability before mobilisation and whenever the scope changes.

RoleRequired action
Competent health and safety adviserOwn this arrangement, confirm competent support and maintain its evidence trail.
Project manager and Site managerCoordinate the actual package, provide resources and verify prerequisites before release; resolve occupied and subcontractor interfaces.
Trade supervisor and workersUse the accepted current method, demonstrate understanding, report changes and stop when critical safeguards are uncertain.
Competent specialist and H&S adviserProvide technical advice within competence; challenge evidence and identify limitations. Management retains the operating decision.

Inputs before using the procedure

Use the current project risk register, relevant survey and design revisions, equipment or product information, worker consultation and the task-specific records listed below. Resolve conflicting or missing information before relying on it. Do not fill missing technical values from an example.

How we carry out the arrangement

1 Plan and obtain reliable information

The assessor observes the actual task with the work team, including non-routine stages, occupied interfaces, changing work fronts and foreseeable failures. Assessments connect the harm mechanism to controls, owners and verification rather than relying on a risk score alone.

2 Verify capability and prerequisites

The Project Manager coordinates RAMS with design, temporary works, permits and subcontract interfaces. Copied methods are checked against the current location, equipment, sequence, public access and emergency arrangements.

3 Control work and interfaces

Supervisors brief the agreed sequence, demonstrate critical checks and ask workers to explain the stop conditions. The method is revised when conditions change; signing a briefing is not evidence that controls are physically in place.

4 Review change and safe handback

A separate release check verifies permits, competence, isolation, access and safeguards. The assessor records uncertainty and obtains competent advice before work is authorised.

Stop restrict and restart

Stop the task when the assessed method no longer matches the conditions, a critical safeguard fails or the team cannot demonstrate the required safe sequence.

The person controlling the work makes the affected area safe and notifies the Site Manager. Restart requires the competent technical decision for the actual control, the authorised work-release decision and a fresh briefing of affected people. Record unresolved limits; an updated date or a completed form does not remove a hold.

Practical control detail

A risk profile should show harm potential, control confidence, uncertainty and strategic exposure.

Keep one coherent risk picture, adding an assessment required by a specific regime or specialist hazard where applicable. A changed worker or lone-working pattern normally prompts review of the existing assessment, not an automatic separate legal form.

Evidence follow up and learning

Worked decision trail

Fictional situationDecision and evidence
What changesA cutting task moves from an open yard into an enclosed room.
ResponseThe supervisor stops the changed task; the assessment is revised for exposure, ventilation, nearby people and emergency access.
VerificationObserve the revised source controls during representative cutting before relying on the new assessment.

Supporting arrangement documents

ReferenceHow the document is used
BOUK-RA-RISK-01
Project baseline risk assessment
Assess project-wide interfaces and prioritise further task assessments.
BOUK-RAMS-RISK-01
Task RAMS preparation and authorisation template
Document task sequence, hazards, controls, competence, hold points and emergency arrangements.
BOUK-CHK-RISK-01
Subcontractor RAMS technical review checklist
Test site specificity, practicality, hierarchy of controls and interface completeness.
BOUK-FRM-RISK-01
Point-of-work change and stop-work review
Record changed conditions, suspension, reassessment and safe restart authority.
BOUK-RA-RISK-02
Young-person, pregnancy and other individual-risk assessment
Identify additional risks and suitable adjustments while protecting personal information.
BOUK-FRM-RISK-02
RAMS briefing and understanding record
Confirm relevant workers understand the task and controls in an accessible language/format.

Retain the record ID, task, location, competent author, revision, date, decision, restrictions, action owner and separate effectiveness evidence. Restrict personal and health information and apply the relevant retention rule. File genuine results separately from teaching examples.

Guidance Risk Assessment and Risk Profiling · Safe Systems of Work

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.