SHAREhub home

Defect, quarantine and return-to-service record

BOUK-FRM-PLANT-01 · v1.0 · Blank editable master · DOCX

Prevent unsafe reuse until competent repair and verification.

Download editable DOCXView this policy branch

Read-only preview. Use the downloaded native file for your own working copy. Examples are fictional; signatures, work releases and operational evidence remain separate.

BOUK-FRM-PLANT-01 | Version 1.0 | 23 October 2026 | GB baseline

BLANK EDITABLE MASTER. Record actual facts, evidence and decisions. Operational entries, signatures and approvals are blank.

Prevent unsafe reuse until competent repair and verification.

Record identityActual entry
Record reference and project
Exact location task and date
Recorder role and competence

Scope facts and prerequisites

Required informationActual evidence or decision
Asset ID location and defect
Reporter date and how discovered
Isolation tag physical quarantine and access control
Affected tasks and alternative equipment
Competent repair and parts or modification details

Decisions handover and verification

Withdraw equipment when a guard, safety device, attachment, inspection or operating condition is unsafe or uncertain; stop the affected task pending verification.

Required informationActual evidence or decision
Inspection or functional verification without unsafe testing
Authorised return-to-service decision
Remaining restrictions and user briefing
Maintenance register update and recurrence review
Finding or actionOwner and due dateEvidence and effectiveness
Review and acceptanceActual entry
Reviewer name role and date
Required signatures and date
Remaining restrictions and restart authority

Retain factual evidence and limitations. A signature, permit or tick does not establish that the physical controls work. Use the separate procedure and the completed decision example for guidance; never copy an example as an actual result.

Guidance Provision and Use of Work Equipment (PUWER) · Mobile plant and vehicles · Guards and Machinery Interlocks

Content basis

Built from the BuildOut policy and arrangement register, the SHARE policy/risk/routine-checklist/audit databases and the linked SHAREknowledge topics.

Register legal summaries retain their own review dates. No actual inspection, clinical record, specialist certificate or company approval is represented.