BOUK-FRM-DES-01 | Version 1.0 | 23 October 2026 | GB baseline
BLANK EDITABLE MASTER. Record actual facts, evidence and decisions. Operational entries, signatures and approvals are blank.
Review buildability, temporary stability, use and maintenance interfaces.
| Record identity | Actual entry |
|---|---|
| Record reference and project | |
| Exact location task and date | |
| Recorder role and competence |
Scope facts and prerequisites
| Required information | Actual evidence or decision |
|---|---|
| Design element stage and revision | |
| Foreseeable build use maintenance and demolition hazards | |
| Elimination and reduction options considered | |
| Design decision and reasoning | |
| Residual risks requiring communication |
Decisions handover and verification
Hold procurement, fabrication or construction when a design assumption, capacity, support condition, lifting point or significant residual risk is unresolved. Site convenience does not authorise a design alteration.
| Required information | Actual evidence or decision |
|---|---|
| Temporary works and trade interfaces | |
| Competent designer and check evidence | |
| Change effects on existing work | |
| Approval boundary and unresolved restrictions | |
| Distribution briefing and superseded revision withdrawal |
| Finding or action | Owner and due date | Evidence and effectiveness |
|---|---|---|
| Review and acceptance | Actual entry |
|---|---|
| Reviewer name role and date | |
| Required signatures and date | |
| Remaining restrictions and restart authority |
Retain factual evidence and limitations. A signature, permit or tick does not establish that the physical controls work. Use the separate procedure and the completed decision example for guidance; never copy an example as an actual result.