Hazard group - construction hazards
Construction hazards are the interacting risks created by building, civil engineering, refurbishment, demolition and maintenance projects. Examples include work at height, excavations, temporary works, mobile plant, falling objects, live services, asbestos, silica dust, noise, vibration and manual handling. Risks change as the design, work stage, workforce, weather and site layout change, and they may affect subcontractors, occupants, visitors and the public. This is an activity-based hazard group rather than a separate physical mechanism. Effective assessment starts with design and planning, coordinates the relevant CDM dutyholders and trades, and verifies safe access, sequencing, equipment, competence and welfare before work. Changes or failed critical controls require a clear stop and restart decision. SHARE uses the group to connect specialist hazards with practical project coordination and control ownership.
Understanding Hazard group - construction hazards
Construction hazards are the interacting risks created by building, civil engineering, refurbishment, demolition and maintenance projects. Examples include work at height, excavations, temporary works, mobile plant, falling objects, live services, asbestos, silica dust, noise, vibration and manual handling. Risks change as the design, work stage, workforce, weather and site layout change, and they may affect subcontractors, occupants, visitors and the public. This is an activity-based hazard group rather than a separate physical mechanism. Effective assessment starts with design and planning, coordinates the relevant CDM dutyholders and trades, and verifies safe access, sequencing, equipment, competence and welfare before work. Changes or failed critical controls require a clear stop and restart decision. SHARE uses the group to connect specialist hazards with practical project coordination and control ownership.
Why this matters at work
The assessment begins with the actual activity and harm pathway, people affected and conditions that influence exposure or barrier failure. Separate observed facts from plans, reports and assumptions. A risk matrix can help prioritise action, but it cannot establish structural capacity, lawful arrangements, an exposure measurement or competence. Proposed controls do not become working controls when their wording is added to a form. Determine what information is required to choose a suitable method and what evidence will demonstrate implementation. The construction decision should state any activity restricted while critical information is unresolved, who obtains that information and who has authority to review the arrangement. Use specialist evidence where the decision exceeds local competence.
Construction health exposure follows the task and may accumulate across trades and shifts even without an immediate injury. Dust from cutting or sanding, asbestos disturbed in hidden fabric, noisy equipment and vibrating tools need their own assessment and competent controls. Avoid or reduce exposure through design and method choice, then provide suitable source control and protection. An extraction unit has to suit the material, tool and use; its presence is not proof of capture. A management asbestos survey supports normal occupancy, while intrusive refurbishment or demolition may require a survey matching the affected fabric. Survey exclusions and unknown areas remain consequential. Noise and vibration assessment considers real equipment use and duration, not a generic tool label.
How organisations manage this in practice
Review connects new evidence to changed decisions. In construction, it follows design revisions, ground or structural discoveries, equipment and materials, contractor interfaces, weather and work phases. Required inspections are specific to the hazard and equipment; a generic weekly site visit cannot replace an excavation shift inspection or another applicable arrangement. Planned management review asks whether resources, responsibilities and controls remain suitable. Separate immediate correction, investigation of why failure occurred and verification that a lasting improvement works. Workers' reports, near misses and symptoms may reveal problems missed by planned observations. The reviewer needs access to current documents and the authority to obtain competent assessment or restrict affected work.
Review construction controls when phases, designs, conditions or evidence change, and fulfil hazard/equipment-specific inspection arrangements. Link findings to correction, underlying causes and verified effectiveness under actual use. Phase-plan review and site visits are distinct from specific competent inspections; action closure requires evidence, not an email or repeated repair alone.
Keep owner correspondence, plan versions, competent survey scope and limitations, identified services and the assessed method together. Record which activity the verification supports and where it stops. Changes in ground, route or equipment reach require review. Operators and supervisors should understand restrictions at the point of work. Emergency contacts are available before work, and unplanned damage is reported and managed through the site and service-owner emergency arrangements.
What are construction hazards and what does their assessment cover?
Construction is an activity based grouping that combines several hazard mechanisms. Plan risk management through design, procurement, site coordination and changing work stages. HSG150 predates Construction (Design and Management) (CDM) 2015: use L153 and current Health and Safety Executive (HSE) construction guidance for dutyholder arrangements. Generic guidance does not approve temporary works, demolition sequencing or an excavation design. See Health and safety in construction and Managing health and safety in construction.
Start with the hazard group overview, then use the related topic links for task-specific background. A group checklist helps discovery; it does not establish that the controls at your site are effective. Read the hazard group overview.
Which hazards should the assessment consider?
Check each relevant mechanism during normal work, cleaning, maintenance, foreseeable failure and emergencies. Several entries can share a harm pathway; follow the linked explanation rather than treating each label as a separate assessment. See Health and safety in construction and Managing health and safety in construction.
Hazard or exposure and practical application — part 1 of 5
Read the complete visual as text
- Excavation collapse: Read the mechanism and controls: Excavations trenches and services
- Trench hazards: Read the mechanism and controls: Excavations trenches and services
- Scaffold failure: Read the mechanism and controls: Scaffolds height and falling objects
- Working at height: Read the mechanism and controls: Scaffolds height and falling objects
Hazard or exposure and practical application — part 2 of 5
Read the complete visual as text
- Falling objects: Read the mechanism and controls: Scaffolds height and falling objects
- Crane operations: Read the mechanism and controls: Cranes lifting and mobile equipment
- Lifting activities: Read the mechanism and controls: Cranes lifting and mobile equipment
- Mobile equipment: Read the mechanism and controls: Cranes lifting and mobile equipment
Hazard or exposure and practical application — part 3 of 5
Read the complete visual as text
- Concrete work: Read the mechanism and controls: Concrete rebar and power tools
- Rebar impalement: Read the mechanism and controls: Concrete rebar and power tools
- Power tools: Read the mechanism and controls: Concrete rebar and power tools
Hazard or exposure and practical application — part 4 of 5
Read the complete visual as text
- Demolition activities: Read the mechanism and controls: Demolition structural collapse and temporary works
- Structural collapse: Read the mechanism and controls: Demolition structural collapse and temporary works
- Confined spaces: Read the mechanism and controls: Confined spaces housekeeping and routes
Hazard or exposure and practical application — part 5 of 5
Read the complete visual as text
- Poor housekeeping: Read the mechanism and controls: Confined spaces housekeeping and routes
- Unsafe access and egress: Read the mechanism and controls: Confined spaces housekeeping and routes
- Construction health additional scope: Read the mechanism and controls: Health exposure throughout the project
Describe when the source is created or released and how it reaches someone. Compare normal operation with receipt, setup, blockage, breakdown, disposal and contractor access. The list below is a discovery aid: an omitted mechanism may still be important, while an irrelevant item does not require a fabricated assessment. Follow the mechanism explanation and test controls against the actual circumstances before scoring risk.
| Hazard or exposure | Read the mechanism and controls |
|---|---|
| Excavation collapse | Excavations trenches and services |
| Trench hazards | Excavations trenches and services |
| Scaffold failure | Scaffolds height and falling objects |
| Working at height | Scaffolds height and falling objects |
| Falling objects | Scaffolds height and falling objects |
| Crane operations | Cranes lifting and mobile equipment |
| Lifting activities | Cranes lifting and mobile equipment |
| Mobile equipment | Cranes lifting and mobile equipment |
| Concrete work | Concrete rebar and power tools |
| Rebar impalement | Concrete rebar and power tools |
| Power tools | Concrete rebar and power tools |
| Demolition activities | Demolition structural collapse and temporary works |
| Structural collapse | Demolition structural collapse and temporary works |
| Confined spaces | Confined spaces housekeeping and routes |
| Poor housekeeping | Confined spaces housekeeping and routes |
| Unsafe access and egress | Confined spaces housekeeping and routes |
| Construction health additional scope | Health exposure throughout the project |
How do design and sequencing decisions influence construction hazards?
CDM appointments and the construction phase plan
In Great Britain, a proportionate construction phase plan is required before construction starts: the sole contractor prepares it on a single-contractor project; the principal contractor does so where more than one contractor is involved. The client must make the principal designer/principal contractor appointments where more than one contractor is involved or likely. Notification thresholds are a separate decision. Northern Ireland uses CDM (NI) 2016; select that route for NI work.
HSE: CDM contractor responsibilities · CDM Regulations (Northern Ireland) 2016
Construction combines hazard mechanisms across changing stages. Design, procurement and sequencing influence exposure before site work. Use current CDM 2015 guidance and L153 for Great Britain roles; older HSG150 is not the current CDM framework. Small works and occupied refurbishment also need appropriate planning. Responsibilities depend on project arrangements and must be established rather than inferred from job titles. See HSE Construction Design and Management Regulations 2015 and Managing health and safety in construction.
A design can avoid elevated installation, dusty cutting or excavation before the site crew encounters those hazards. Conversely, a poorly sequenced change can expose several trades at once or remove protection needed by a later activity. The relevant dutyholders and competent people coordinate usable information and residual risks for the actual jurisdiction. Small scale does not remove the need to plan the work and its interfaces.
What information must follow a changing construction project?
Coordinate suitable information, planning, supervision and cooperation. Assign responsibility for temporary works, services, lifting, access and health exposure. Plans describe intent, not proof of actual conditions. Verify relevant ground and structural information; unplanned discoveries, changed weather and simultaneous operations require reassessment and competent escalation. See Managing health and safety in construction and Avoiding danger from underground services.
Confirm relevant structure, services, ground, materials and access information before deciding on a method. A discrepancy discovered on site is a change to be assessed, not a reason to guess. Identify who can revise the design or sequence, communicate the decision to affected trades and occupants, and retain the hand-back information needed for use and maintenance. Unidentified material or uncertain support can require holding the affected work.
How can an excavation collapse or damage a buried service?
Collapse can bury workers or affect structures and services. Surface appearance cannot establish stability. See HSE Excavations and Avoiding danger from underground services.
A trench wall collapses, an excavator contacts a buried service or water alters ground stability. Nearby foundations, spoil, vehicles and simultaneous work can invalidate an earlier assumption. A worker entering to inspect or rescue can become the next casualty if stability and services are uncertain.
Which source controls and checks change the outcome?
Avoid excavation through route or design changes where practicable, then obtain competent ground, service and protective-system planning. Coordinate plant, people, access and adjacent loads. The responsible competent people inspect and respond to changes, including weather and disturbed support. Stop and exclude access for instability, unidentified services or failed protection; no depth rule or generic image replaces the site-specific design and emergency arrangement.
How should the controls be applied?
Avoid unnecessary excavation and obtain competent support or other suitable design. Assess water, edge loads, services and access.
When should work stop or be escalated?
Hold the affected activity if a critical safeguard is missing, fails its check or no longer matches the assessed conditions. Use competent inspections at the start of the shift and after relevant stability events, with appropriate records and prompt defect correction. No universal unsupported depth or slope is provided.
How do scaffold changes or falling objects put people at risk?
Changed access, fragile surfaces and insecure materials expose workers and public. Other trades may alter controls. See Working at height and Safety hazards.
A scaffold is altered to suit another trade, material is stored beyond the plan or an unprotected edge appears during a handover. A person can fall, while tools or material strike workers or the public below. The configuration and access route matter throughout erection, use, alteration and dismantling.
Which source controls and checks change the outcome?
Avoid elevated assembly where possible, choose suitable collective protection and have competent people plan and verify the actual scaffold or access system. Control alterations, loading and falling-object exposure through designed protection and separation. Supervisors check the usable state and required inspection evidence before access. Stop for unauthorised alteration, missing protection or an unassessed load; a harness does not repair an unsuitable platform or remove the need for rescue planning.
How should the controls be applied?
Avoid height work where practical and provide suitable collective protection and competent access arrangements. Control alterations and access below.
When should work stop or be escalated?
Hold the affected activity if a critical safeguard is missing, fails its check or no longer matches the assessed conditions. Check handovers and changes, not just labels; escalate missing protection.
How can lifting and site transport interfaces cause a serious incident?
Dropped loads, overturning and strikes depend on equipment, ground, routes and interfaces. See Lifting equipment at work and Workplace transport.
A suspended load passes over a pedestrian route, a reversing vehicle meets a banksman or a crane reaches near an overhead line. Load movement, visibility, ground condition and competing activities interact. A successful previous lift does not establish that a changed configuration is safe.
Which source controls and checks change the outcome?
Avoid people beneath or near moving loads through layout and sequence design, and plan lifting using competent personnel and suitable equipment. Verify load, attachments, configuration, support and utility interfaces against actual information. Maintain physical separation and communication through the operation. Stop on a lost exclusion zone, unclear signal, unknown load or changing support conditions; visibility clothing and operator training do not replace a suitable lift or transport plan.
How should the controls be applied?
Plan competently with suitable equipment, exclusion and communication and coordinate services and traffic.
When should work stop or be escalated?
Hold the affected activity if a critical safeguard is missing, fails its check or no longer matches the assessed conditions. Obtain actual lift and traffic arrangements and examination evidence where applicable.
How can concrete work, exposed rebar and tools injure workers?
Wet cement, generated dust, handling and protruding reinforcement combine with cutting, ejection, noise and vibration. See Safety hazards and Health risks.
Wet concrete contacts a worker's skin, cutting releases dust and noise, or a fall reaches exposed reinforcement. These are different harm chains even within one small task. Cleaning and maintenance can expose another trade after the original crew has left.
Which source controls and checks change the outcome?
Reduce cutting through design and pre-formed material, provide suitable source controls and design protection from exposed reinforcement and access hazards. Assess concrete contact, equipment compatibility and generated exposures separately, then coordinate the method. Supervisors verify controls and worker instruction before and during the activity. Select compatible residual Personal protective equipment (PPE) without creating tool entanglement. Stop for uncontrolled dust, unsafe access or missing critical protection and obtain a corrected arrangement.
How should the controls be applied?
Design access and handling, provide suitable impalement protection and control cement contact and dust with suitable equipment.
When should work stop or be escalated?
Hold the affected activity if a critical safeguard is missing, fails its check or no longer matches the assessed conditions. Do not assume decorative caps prevent impalement. Obtain suitable protection and task exposure evidence.
How can demolition or temporary works cause an unintended collapse?
Removing parts and changing loads can destabilise structures. Hidden services and hazardous materials complicate intervention. See HSE Demolition and Safety hazards.
Removing a wall changes load paths, temporary support is altered or plant vibration affects a weakened structure. Collapse can reach neighbouring premises or workers outside the immediate demolition area. A visible structure remaining upright is not evidence that the proposed sequence is stable.
Which source controls and checks change the outcome?
Consider retaining, modifying or dismantling through a safer design and sequence before exposure. Competent designers and planners establish structure information, support, services, exclusion and monitoring appropriate to the project. Control changes and handovers with named responsibility. Stop on unexpected construction, movement, damage or missing design information; untrained people must not enter a suspect structure to investigate. Restart requires a competent review and agreed corrective measures, not a revised risk score alone.
How should the controls be applied?
Use competent surveys, engineered sequencing, support and coordinated exclusion. Establish client designer and contractor responsibilities and review changes before intervention.
When should work stop or be escalated?
Hold the affected activity if a critical safeguard is missing, fails its check or no longer matches the assessed conditions. Appearance cannot prove stability. Stop unplanned work with missing critical information and escalate.
How can restricted spaces and poor site routes obstruct safe work?
Pits may have atmospheric dangers; wastes and obstructions increase injury and impede evacuation. See Safe work in confined spaces and Safety hazards.
A refurbishment crew enters a service void while another trade blocks the access route with materials. A confined-space serious risk needs its own assessment; poor routes can also cause falls or obstruct emergency exit without being a confined-space hazard. Several trades can unknowingly defeat each other's controls.
Which source controls and checks change the outcome?
Avoid entry where possible, establish the relevant safe system and rescue arrangement where required, and design usable routes for people, deliveries and emergency access. Coordinators inspect interfaces as work progresses and control storage and waste. Stop when access, atmosphere, isolation or emergency arrangements no longer match the plan. Cleaning instructions and signs support a workable layout; they cannot restore a blocked sole exit or make an unassessed entry safe.
How should the controls be applied?
Avoid entry where possible or use a competent system with rescue. Maintain routes, storage and emergency access through each phase.
When should work stop or be escalated?
Hold the affected activity if a critical safeguard is missing, fails its check or no longer matches the assessed conditions. Verify entry rescue and usability for real users. Housekeeping requires ongoing ownership.
Which construction exposures can cause long-term ill health?
Before disturbing building fabric
Establish whether asbestos could be present and obtain competent information for the exact area and proposed intrusion. Review survey limitations and inaccessible spaces; a management register is not automatically sufficient for intrusive refurbishment or demolition. Obtain further investigation where required before disturbance. Unexpected suspected asbestos means stop and follow the specialist response; extraction does not authorise continuing.
HSE: Arrange an asbestos survey · SHAREhub environment: Asbestos risk management
Cutting, sanding and demolition generate exposure; disease may develop without immediate injury. See Health risks and Working with substances hazardous to health: A brief guide to COSHH.
A short construction task can generate respirable dust, welding fume, noise or vibration, while repeated contact with wet cement affects skin. Harm may develop later and involve nearby trades, cleaners or occupants. Work continuing without an accident does not establish that exposure has been controlled.
Which source controls and checks change the outcome?
Design out unnecessary cutting or dusty work, select suitable lower-exposure methods and provide task-specific capture, separation or mechanisation. The manager verifies commissioning and representative performance, while supervisors check use and changing interfaces. Residual PPE and applicable monitoring or health surveillance support the controls without replacing them. Stop when a critical control fails or an unidentified material is disturbed; do not assume a disposable mask covers every contaminant.
How should the controls be applied?
Plan lower-exposure methods and suitable containment and extraction. Obtain task-specific hazardous material advice.
When should work stop or be escalated?
Hold the affected activity if a critical safeguard is missing, fails its check or no longer matches the assessed conditions. Check control performance. Visible cleanliness or absent complaints do not establish exposure control.
How should this hazard group be assessed and managed in practice?
For a refurbishment or excavation project, review design information, buried services, ground conditions, temporary works, lifting, access, occupied premises and interfaces between contractors. Avoid risks through design and coordinated planning. Establish safe excavation and structural arrangements, suitable access and collective fall protection. Plan lifting, demolition and temporary works with competent people and include health exposures. Pre construction information; construction phase plan; design risk information; temporary works and excavation checks; lifting plans; service records; inspections, briefings and change control. Follow the assessment through procurement, implementation, briefing, supervision and verification rather than stopping at a document. See Health and safety in construction and Managing health and safety in construction.
Agree the activity, affected people and prerequisites with operations, workers and any contractor before work. Test whether the task can be removed or redesigned, then verify selected controls in the place they will operate. During work, the supervisor compares conditions with the assessed method and has authority to stop. Completion includes safe waste or equipment handling, outstanding defects and a named hand-back decision; a completed risk form is not the end of the control process.
What must be established before assigning a risk score?
Identify the actual activity, foreseeable harm, people exposed and controls already demonstrated to work. Consider start up, normal operation, cleaning, maintenance, breakdown, emergency response and simultaneous work. A numerical matrix may support prioritisation but cannot establish compliance or replace a specialist assessment. Do not assign a residual risk score merely because a proposed control has been written into a form. Keep unknowns explicit and obtain site evidence before deciding that work can proceed. See Managing risks and risk assessment at work and Managing for health and safety (HSG65).
Write a short causal description: the work creates or releases something, a person is exposed by a particular route, and a specified injury or ill-health outcome is foreseeable. Establish whether existing measures work in the actual task before estimating likelihood. An unknown material, unverified safe state or absent critical control is a decision gap, not a reason to select a reassuring number. The responsible manager records what must be resolved and who can authorise the next step.
Who owns each control and how should it be verified?
The dutyholder provides resources and arrangements. The operational manager assigns each control to someone able to implement it. Supervisors verify the controls at the point of work and respond to defects. Workers and representatives explain work as done and report problems. Specialist advisers address limits of local competence. Record the control, responsible role, evidence, check method, due date and escalation route. Completion of a training course or signature alone does not demonstrate effective risk control. See Managing for health and safety (HSG65).
Separate the person who funds and owns the control from the person who performs its check. For an engineered measure, record the accepted performance or condition, who verifies it, what a failed result means and how maintenance is coordinated. For a staffing or organisational measure, check actual cover, authority and staff experience. A signature confirms a recorded action, not effectiveness. The supervisor must be able to hold work and obtain a competent remedy when the required condition is not met.
Who might be affected, including people outside the work team?
Include employees, agency workers, apprentices, contractors, cleaners, maintainers, delivery drivers, service users, visitors and nearby public. Consider inexperience, pregnancy, disability, health conditions, language needs and lone work individually and without stereotyping. Consultation should identify barriers to controls rather than collect unnecessary medical details. Share relevant interface information between employers. A single activity may require several hazard groups; avoid splitting the assessment so that interacting controls have no clear owner. See Managing risks and risk assessment at work and Managing for health and safety (HSG65).
Walk through the job from the perspective of someone who has not received the operator briefing: a cleaner, visiting driver, contractor, new starter or occupant of an adjoining area. Ask whether a control protects them during arrival, normal work, waste removal and emergencies. Agree who controls each shared boundary and how changes are communicated. Individual needs influence a suitable arrangement but do not justify treating an employee, disability or health condition as the hazard.
When should the assessment be reviewed and what evidence matters?
Reassess when equipment, materials, staffing, layout, working hours or environmental conditions change; after incidents, near misses, complaints, symptoms or evidence of failed controls; and through planned risk based review. Verify improvements under realistic demand, not only during an announced inspection. Retain dated observations, measurements where relevant, maintenance records and action closure evidence. No single review interval suits every risk. Health surveillance, exposure monitoring and clinical diagnosis are different activities and require their own competent arrangements. See Managing risks and risk assessment at work and Managing for health and safety (HSG65).
Use a change or failure to test the original assumptions, not merely change the date on the form. A different product, higher throughput, altered route, new shift or contractor may change the harm pathway. Keep observations, applicable measurements, defects and authorisation evidence linked to the task. After correction, verify under representative demand and with affected workers. Repeated workarounds or symptoms require investigation of the design and organisation, even when no injury has been recorded.
How could construction hazards arise in construction and civil engineering?
In construction and civil engineering, civil works excavate beside buildings. Coordinate ground support and services. Design and site evidence. This is an illustrative application, not a documented case or a complete method statement. See Avoiding danger from underground services and Managing health and safety in construction.
A trench can undermine nearby ground or structures, strike a service or collapse on a worker.
The competent design and site team verify ground, services, protection and access before the stage begins. Unexpected conditions or failed required protection stops affected work; never send an untrained person into unstable ground to investigate.
How could construction hazards arise in manufacturing and engineering?
In manufacturing and engineering, factory refurbishment adjoins live production. Coordinate dust isolation and contractors. Phase and interface checks. This is an illustrative application, not a documented case or a complete method statement. See Managing health and safety in construction.
Dust, service interference or falling material from refurbishment can reach production staff outside the contractor boundary.
The factory manager and contractor coordinate shutdowns, separation and usable routes for each phase. Breached containment or an unplanned production interface is a hold point; verify the remedy before reopening.
How could construction hazards arise in warehousing and logistics?
In warehousing and logistics, warehouse alterations change routes. Plan segregated temporary access. Route observations. This is an illustrative application, not a documented case or a complete method statement. See Managing health and safety in construction and Workplace transport.
Temporary routes can send pedestrians into lift-truck movements or expose them to alteration work.
The warehouse coordinator checks the actual dispatch pattern and separate access at each phase. Displaced barriers or an unusable escape route stops the affected activity until the routes are restored and communicated.
How could construction hazards arise in agriculture and forestry?
In agriculture and forestry, farm roof repairs involve fragile surfaces. Avoid access and plan protection. Roof and access evidence. This is an illustrative application, not a documented case or a complete method statement. See Working at height.
A fragile roof can fail beneath a worker, with a fall through it or dropped material striking someone below.
The farm owner and contractor first avoid roof access and obtain competent access and collective protection planning. Unknown roof condition or missing protection is a hold point; a short job is not an exemption.
How could construction hazards arise in hospitality and food production?
In hospitality and food production, restaurant works involve cutting and concrete. Assess dust contact and tools. Task and extraction evidence. This is an illustrative application, not a documented case or a complete method statement. See Health risks.
Cutting and concrete work can create respirable dust, contact exposure and tool injury beside food operations.
The contractor first considers lower-release or off-site methods and suitable source control. Failed extraction, unidentified material or an occupied interface outside the plan stops the task; verify cleaning and hand-back before food operations resume.
How could construction hazards arise in retail and public services?
In retail and public services, shop fit-out takes place near customers. Separate public and falling materials. Boundary checks. This is an illustrative application, not a documented case or a complete method statement. See Managing health and safety in construction and Working at height.
Fit-out work can drop material or expose moving tools to customers crossing the work boundary.
The retailer and contractor plan closure or effective separate access. A customer entering the danger zone or unstable stored materials is a hold point; maintain the boundary through deliveries and hand-back.
How could construction hazards arise in offices and professional services?
In offices and professional services, office alteration removes structure. Obtain competent survey and sequencing. Structural authorisation. This is an illustrative application, not a documented case or a complete method statement. See Safety hazards.
Removing an element without adequate structural information can cause an unexpected collapse affecting workers and occupants.
The client obtains competent survey, design and sequence information. Missing or contradictory structural information stops the removal; commercial deadlines cannot substitute for technical authorisation.
How could construction hazards arise in education and laboratories?
In education and laboratories, school repairs require access during term. Coordinate occupants and access. Protection checks. This is an illustrative application, not a documented case or a complete method statement. See Working at height and Managing health and safety in construction.
Repairs during term can expose pupils to falling objects, tools and changing access routes.
The school and contractor plan timing, separation and supervision that do not rely on pupils recognising hazards. An insecure boundary or changed pupil route stops the affected stage until the school and contractor verify arrangements.
How could construction hazards arise in utilities and waste management?
In utilities and waste management, utilities excavate pits near services. Use competent excavation and entry systems. Locating and rescue evidence. This is an illustrative application, not a documented case or a complete method statement. See Avoiding danger from underground services and Safe work in confined spaces.
A pit can combine buried services, collapse and atmospheric danger that an ordinary access check misses.
The competent team coordinates service identification, excavation protection and any separate confined-space assessment. Unknown services, stability or atmosphere are hold points; emergency response must not require improvised entry.
How could construction hazards arise in energy and process industries?
In energy and process industries, process demolition adjoins live systems. Plan isolation and structural sequence. Handover evidence. This is an illustrative application, not a documented case or a complete method statement. See Managing health and safety in construction and The safe isolation of plant and equipment.
Demolition can destabilise remaining structure or damage live process services, exposing people beyond the demolition crew.
The relevant design, isolation and contractor teams coordinate the sequence and plant interfaces. Unidentified connections or departure from the approved sequence stops work; verify each stage before handing the next area over.
How could construction hazards arise in events and transport operations?
In events and transport operations, events erect temporary structures. Use competent design and change control. Design handover. This is an illustrative application, not a documented case or a complete method statement. See Safety hazards and Managing health and safety in construction.
A temporary structure can become unstable under actual loads, erection sequence or changing site conditions.
The organiser obtains competent design and erection information and controls contractor handovers. Missing verification, damaged components or unassessed alteration prevents public opening until competent release.
How do you put the controls into practice?
Move from recognising harm to deciding, implementing, checking and improving the controls. Give each critical control an owner, a check method and a clear escalation route. See Managing risks and risk assessment at work and Managing for health and safety (HSG65).
- Understand the taskObserve people, equipment, materials and interfaces.
- Describe the harmIdentify exposure, energy release and foreseeable failure.
- Control at sourceAvoid, redesign, substitute, contain or separate the hazard.
- Check in real workVerify performance, defects, ownership and change triggers.
| Stage | Action | Who acts | Evidence to retain |
|---|---|---|---|
| Before work | Confirm the actual task, people, equipment, substances, location and abnormal conditions. | Operational manager with competent advice | Assessment, observations, consultation and required specialist checks |
| Control delivery | Avoid risks through design and coordinated planning. Establish safe excavation and structural arrangements, suitable access and collective fall protection. Plan lifting, demolition and temporary works with competent people and include health exposures. | Responsible manager and authorised implementers | Pre construction information; construction phase plan; design risk information; temporary works and excavation checks; lifting plans; service records; inspections, briefings and change control. |
| During work | Supervise the real activity; check that critical controls remain effective and workers can report problems. | Supervisor and workers | Checks, defects, changes and escalations |
| Stop and restart | Stop the affected activity when serious danger or a failed critical control is suspected. Restart only through the competent site authorisation arrangements. | Supervisor and authorised competent person | Reason for stopping, corrective action, verification and restart authority |
| Review | Revisit controls after change, incidents, near misses, symptoms or repeated defects. Check effectiveness rather than counting completed forms. | Manager, Occupational safety and health (OSH) adviser and worker representatives | Dated review, closure evidence and lessons for design and procurement |
How does ERICPD apply to construction hazards?
ERICPD stands for Eliminate, Reduce, Isolate, Control, PPE and Discipline. For construction hazards, start by removing the hazardous task or source where practicable, then reduce and separate the remaining exposure. Combine suitable safeguards and work arrangements, use relevant personal protective equipment for residual risks, and keep all selected measures effective in everyday work. See HSE: Managing risk using PPE and Managing for health and safety (HSG65).
- 1 · E Eliminate
Remove the hazardous task or source where practicable; confirm that the alternative still fulfils the task and assess remaining hazards.
- 2 · R Reduce
Use a suitable less hazardous material, process or equipment, or reduce the hazard at source. Check any new risks introduced.
- 3 · I Isolate
Separate people from the hazard through suitable containment, guarding, barriers or other task-specific separation.
- 4 · C Control
Put remaining safeguards and workable task arrangements in place. Engineering controls and administrative arrangements have different strengths.
- 5 · P PPE
Select personal protective equipment for relevant residual exposure. Check suitability, fit, compatibility, use and maintenance.
- 6 · D Discipline
Sustain the controls through management support, supervision, maintenance and learning. Resolve workarounds and failures without blaming workers.
Eliminate, Reduce and Isolate focus attention on the hazard and the exposure pathway before reliance on behaviour or PPE. Controls usually work together: an enclosure may still need safe access, maintenance and instruction. Record the reasons for choosing or rejecting stronger options and check the complete task, including cleaning, maintenance and foreseeable changes.
ERICPD is a practical learning mnemonic. The five-level hierarchy is elimination, substitution, engineering controls, administrative controls and PPE. Reduce may include substitution or source reduction; Isolate commonly involves engineering. Control can include engineering and administrative measures. Discipline supports every selected level and is not an additional protective barrier. These frameworks are related; their labels do not form identical statutory ladders.
What does each role need to know and demonstrate?
People need learning and demonstrated competence for the decisions they actually make, not the same course at every organisational level. See Health and safety in construction and Managing health and safety in construction.
For construction hazards, frontline learning must enable staff to recognise changed access, support, plant and exposure controls. Supervisors need to coordinate trades and challenge missing design or service information. Design, procurement and specialist assessment require deeper competence in upstream design, competent planning and controlled change. Awareness, supervised practice, assessment and authorisation are different stages; an attendance record alone does not establish competence or permit specialist intervention.
Assess practical understanding with the actual task and credible abnormal conditions. The assessor must be competent for the scope being tested; authorisation should state its boundaries. Reassess after a material change, a defect, a demonstrated gap or work outside that scope rather than assuming one fixed refresher interval suits every role.
| Role | Learning and decisions | Assessment, evidence and reassessment |
|---|---|---|
| Nearby staff and new starters | Recognise the relevant exposure, usable routes, warning signs and reporting or emergency arrangements. | Supervisor checks a practical explanation and scenario response; retain briefing scope and gaps. Repeat when routes or conditions change. |
| Frontline users | Demonstrate how to recognise changed access, support, plant and exposure controls, including the checks, limits and stop decision. | Competent task assessor observes representative practice and a defect scenario; record task, equipment/material scope and authorisation. Reassess for changed methods or performance gaps. |
| Specialist workers and maintainers | Demonstrate the applicable technical method, safe state, interface controls and hand-back; do not infer specialist skill from general awareness. | Competent specialist assesses work within a defined scope; retain method, assessment and authorisation evidence. New equipment, material or fault type may need a new decision. |
| Supervisors and coordinators | Demonstrate how to coordinate trades and challenge missing design or service information, manage a changed condition and hold or release work. | Manager or competent reviewer tests a realistic planning and stop/restart scenario; retain observed decisions and corrective actions. Review following interface failures. |
| Managers, purchasers and designers | Make and resource decisions on upstream design, competent planning and controlled change, including the stronger-control options and residual risks. | Competent review of specifications, trials, procurement acceptance and effectiveness evidence; record decision owner and outstanding actions. Reassess after process or organisational change. |
| OSH advisers, technical specialists and auditors | Distinguish jurisdiction and source limits, test representative evidence and recognise the boundary of their competence. | Appropriately competent review of the actual assessment, sources, sampling and closed actions; retain scope and limitations. Escalate missing technical information rather than inventing a conclusion. |
How can the hierarchy of controls reduce construction activity risks?
A refurbishment team cuts masonry in an occupied building. Airborne dust can affect the cutter, other trades and occupants; cutting also introduces noise, vibration and machinery risks. Design, procurement and sequencing influence exposure before work begins.
Illustrative SHARE example: assess stronger options first, then combine the measures needed for the remaining task. If elimination removes the task entirely, later measures address only remaining or different hazards. Each stage below explains what changes, how harm is reduced and who verifies it.
Applying ERICPD to other hazards in this group
Use upstream decisions for other construction hazards: design out elevated assembly, avoid excavations where feasible and select collective protection before personal fall protection. Service location, structural stability and temporary works require their own competent assessment, not a dust-control checklist.
Keep an assessment record of the chosen controls, reasons for the selection, action owner, verification evidence and failure response. A failed critical control requires the affected activity to be held and corrected through the competent site arrangements; PPE or a completed form does not override that decision.
Guidance supporting these teaching examples
How should refurbishment be controlled in an occupied workplace?
Manage this activity by preventing exposure at source, coordinating the affected people and verifying the planned controls before release. A contractor refurbishes an occupied workplace with deliveries, staff and visitors still present. Work can expose people to services, falling objects, dust, noise and obstructed escape. The project is construction work even when the premises owner describes it as a small maintenance job. See Managing health and safety in construction and Health risks.
Illustrative SHARE workplace example
What must be agreed before work starts?
The client, designers and relevant contractors obtain and coordinate information for the actual project and jurisdiction. First consider closure, separation, off-site fabrication and methods that avoid dusty cutting or elevated work. Competent people plan services, structure, access, protection and residual exposures. The coordinator agrees trade interfaces and release stages so reopening one area does not defeat protection elsewhere.
What changes, stops or hand-back decisions matter?
Supervisors check the work as it progresses and hold it for unidentified material, unknown services, damaged protection or unplanned occupant access. Contractors must not improvise a structural or electrical solution under time pressure. Before hand-back, authorised people verify completed work, protective arrangements, routes and residual information needed by the occupier. Retain design changes, inspection and release evidence and review complaints or defects after reopening.
How should jurisdiction, local rules and management assurance be handled?
Apply the law and regulator guidance for the work location, then use competent task and equipment information to establish the practical arrangements. See Managing risks and risk assessment at work and Managing for health and safety (HSG65).
HSE guidance generally addresses Great Britain; Northern Ireland has its own instruments and Health and Safety Executive for Northern Ireland (HSENI) route. Construction, dangerous substances, equipment and other specialist topics need the applicable instrument, not a Great Britain (GB) duty copied into a Northern Ireland (NI) answer. Fire arrangements also differ across the United Kingdom (UK) nations. Foreign project examples require destination-specific official advice and competent local assessment.
Distinguish a legal duty, regulator guidance, an organisation's rule and an illustrative SHARE method. A management system can link assessment, procurement, competence, maintenance, consultation and corrective action; a certification label or an unverified standard clause does not authorise work. For this group, sample evidence on upstream design, competent planning and controlled change and compare the recorded method with the activity observed on site. Resolve conflicts or missing technical information with the responsible competent person.
How would coordinating an excavation beside an occupied building work in practice?
A contractor plans a trench near an occupied building and a shared access route. Collapse, underground services, plant movement, water and falling material can interact. The client and design team first consider avoiding the excavation or changing the route and method; the construction team then develops competent site-specific arrangements. See Managing health and safety in construction and HSE Excavations.
Illustrative SHARE workplace example
What is required before and during the activity?
Before work, establish services, ground conditions, nearby structures, access, plant interfaces and the required support or other protective system through competent assessment. Coordinate responsibilities and information. During work, monitor changing conditions and required inspections. Stop when stability, service location, protection or safe access is uncertain; untrained people must not enter an unstable excavation to investigate or rescue.
What does safe completion and hand-back require?
Authorised competent people decide on corrective action and release. Hand back access and the completed work only after the agreed checks, recording inspections, defects and changes. Weather, adjacent loads and simultaneous work can invalidate the original plan. A minor refurbishment still needs its own construction coordination arrangements.
Acronyms and terms
These terms distinguish the source of harm, the exposure route and the controls needed for the actual work.
| Letters or term | Expansion or definition | Meaning in this topic |
|---|---|---|
| UK | United Kingdom | A geographical description, not one identical set of health-and-safety instruments. |
| GB | Great Britain | England, Scotland and Wales; HSE guidance is generally framed for this jurisdiction. |
| NI | Northern Ireland | A separate health-and-safety legal route overseen by HSENI. |
| HSE | Health and Safety Executive | The GB regulator and a publisher of official workplace guidance. |
| HSENI | Health and Safety Executive for Northern Ireland | The NI regulator; check its applicable requirements and advice. |
| OSH | Occupational safety and health | Preventing work-related injury and ill health. |
| PPE | Personal protective equipment | Equipment worn for remaining exposure; it does not replace stronger source controls. |
| Local exhaust ventilation (LEV) | Local exhaust ventilation | Engineered capture of airborne contaminant near its source. |
| COSHH | Control of Substances Hazardous to Health | The GB hazardous-substance assessment and exposure-control route. |
| CDM | Construction (Design and Management) | Construction duty and coordination arrangements; check the applicable GB or NI instrument. |
| PUWER | Provision and Use of Work Equipment Regulations | GB requirements for suitable work equipment, protection and competent use. |
| ERICPD | Eliminate, Reduce, Isolate, Control, PPE, Discipline | A learning mnemonic for selecting and sustaining controls; not a statutory ladder. |
| Hazard | A source or condition with potential for harm | Describe what creates harm, rather than calling a person the hazard. |
| Exposure | A route or contact connecting source and person | Consider dose, duration and circumstances where relevant. |
| Critical control | A measure essential to the safe arrangement | Define its required condition, check, owner and failure response. |
| Hand-back | Controlled return to operation or use | Confirm people, equipment, protection and outstanding conditions before release. |
Example handy documents
Useful records connect the actual task to control ownership, checks, stop decisions and verified hand-back. See Managing risks and risk assessment at work and Managing for health and safety (HSG65).
The following are examples of documents an organisation could create or adapt, not downloadable files or a complete safe system. Use the task-specific information and competent review before applying them. Keep private health information outside general operational records.
What should a task and harm-route assessment contain?
Record people, source, exposure or energy, foreseeable harm, existing controls, stronger options, residual uncertainty and the responsible decision owner.
What should a critical-control check and defect log contain?
Record the required condition, check method, responsible person, failed result, restricted work and verified corrective action.
What should a change and hand-back record contain?
Capture changed material, equipment, staffing, layout or conditions; prerequisites, hold decisions, competent verification and restart authority.
What should a competence and authorisation record contain?
Name the assessed task and scope, practical evidence, assessor, limits, supervision and reassessment triggers.
What should an operational learning review contain?
Link observations, complaints, near misses or relevant exposure evidence to a design or organisational change and an effectiveness check.