Apply the learning
Use these fictional practice sheets. They do not create, sign or approve workplace records.
Engineering workshop shift readiness
Select the checks that would establish usable controls during this shift. State who must act if a check fails and what evidence is needed before release.
- Are machine guards fitted? Evidence to seek: Observe safely against the approved local criterion or check the named record. Yes confirms the whole question; No needs a finding and action; N/A needs a reason. Do not defeat safeguards, open live enclosures or perform an unsafe test.
- Are authorised stop checks complete? Evidence to seek: Observe safely against the approved local criterion or check the named record. Yes confirms the whole question; No needs a finding and action; N/A needs a reason. Do not defeat safeguards, open live enclosures or perform an unsafe test.
The live SHAREhub tool may require an account. The included fictional exercise remains available offline and never creates a real workplace record.
Pressure systems (PSSR)
Identify the task limits, responsibilities and support or escalation route. Compare the arrangement with the fictional case; do not adopt a template without checking the actual workplace.
- An air receiver has been serviced, but no one can establish the required examination arrangements. Does the service invoice resolve the issue?
- No. Establish the applicable duties and competent examination arrangements, safe limits and operating status. Maintenance is not a substitute for the required examination.
- Identify a pressure asset’s owner, safe limits and examination evidence.
The live SHAREhub tool may require an account. The included fictional exercise remains available offline and never creates a real workplace record.
Pressure systems and compressed gas audit
Sample relevant questions, identify objective evidence and assign an owned corrective action. A completed form alone does not prove control.
- Have qualifying pressure systems and relevant fluids been identified correctly? Evidence to seek: Sample air receivers, steam and gas systems against competent applicability decisions; record exclusions rather than assuming every pressurised item falls under PSSR.
- Are safe operating limits established, known and not exceeded? Evidence to seek: Compare pressure, temperature and other limits with operating instructions, gauges and protection settings.
- Are maintenance tasks assessed for normal, fault, cleaning and unexpected-start conditions? Evidence to seek: Sample a job and compare access, energy sources and hazards with the production assessment.
- Are all hazardous energies identified, including stored, gravity and process sources? Evidence to seek: Trace electrical, hydraulic, pneumatic, thermal, pressure and suspended loads to a documented isolation method.
The live SHAREhub tool may require an account. The included fictional exercise remains available offline and never creates a real workplace record.
Release of pressure, spring, hydraulic or gravitational stored energy
Describe the actual task and exposure, distinguish existing and planned controls, and assign verification before work.
- An air receiver has been serviced, but no one can establish the required examination arrangements. Does the service invoice resolve the issue?
- No. Establish the applicable duties and competent examination arrangements, safe limits and operating status. Maintenance is not a substitute for the required examination.
- Identify a pressure asset’s owner, safe limits and examination evidence.
The live SHAREhub tool may require an account. The included fictional exercise remains available offline and never creates a real workplace record.
Optional visual practice and worked application
Use these fictional exercises to compare evidence and rehearse decisions. They do not alter course completion or assessment requirements. You can work through the same choices on paper.
Changed compressed-air system and unresolved scheme coverage: read the evidence
An installed compressed-air receiver has changed connected pipework and protective arrangements. A recent service invoice is offered as proof of readiness, but the relevant examination-scheme coverage has not been confirmed.
The failure in this example
Routine maintenance is being credited for a different assurance duty. The modification changes the system boundary; the applicable duties and competent examination decision still need resolution.
A better arrangement
Hold acceptance of the changed arrangement. Obtain competent review of applicability, scheme coverage and examination requirements, safe limits and the current operating condition before authorised use.
Worked record: who owns the decision?
The system user/owner controls acceptance and operation; the competent person makes the examination/scheme decision within the applicable pressure-system regime.
Match the evidence roles in this task
An installed compressed-air receiver has changed connected pipework and protective arrangements. A recent service invoice is offered as proof of readiness, but the relevant examination-scheme coverage has not been confirmed.
Place each statement under the evidence role it describes. These roles support one task decision; they are not interchangeable.
- Identify the receiver, connected pipework, protective devices and relevant change. System boundary. This statement addresses system boundary. Identify the receiver, connected pipework, protective devices and relevant change.
- The competent person determines the applicable written-scheme/examination coverage; maintenance evidence cannot substitute for it. Examination arrangement. This statement addresses examination arrangement. The competent person determines the applicable written-scheme/examination coverage; maintenance evidence cannot substitute for it.
- The user/owner confirms the required assurance and safe limits before accepting the changed system for use. Operating acceptance. This statement addresses operating acceptance. The user/owner confirms the required assurance and safe limits before accepting the changed system for use.
Changed compressed-air system and unresolved scheme coverage: test the arrangement
Routine maintenance is being credited for a different assurance duty. The modification changes the system boundary; the applicable duties and competent examination decision still need resolution. Hold acceptance of the changed arrangement. Obtain competent review of applicability, scheme coverage and examination requirements, safe limits and the current operating condition before authorised use.
Worked record: evidence to obtain
System identity and changed boundary, relevant fluid/conditions and safe limits, the applicable written scheme and examination status where required, protection and maintenance evidence and named acceptance.
Worked record: decision and owner
Hold acceptance of the changed arrangement. Obtain competent review of applicability, scheme coverage and examination requirements, safe limits and the current operating condition before authorised use. The system user/owner controls acceptance and operation; the competent person makes the examination/scheme decision within the applicable pressure-system regime.
Why the weak assurance fails
Routine maintenance is being credited for a different assurance duty. The modification changes the system boundary; the applicable duties and competent examination decision still need resolution.
Choose evidence that supports the review
An installed compressed-air receiver has changed connected pipework and protective arrangements. A recent service invoice is offered as proof of readiness, but the relevant examination-scheme coverage has not been confirmed. The team is reviewing what can support acceptance.
Select the two statements which support the example’s review. Leave the two unsupported shortcuts unselected.
- The system owner has resolved the modification’s effect on applicable examination arrangements with the competent person. Relevant evidence. This is useful evidence for this example. System identity and changed boundary, relevant fluid/conditions and safe limits, the applicable written scheme and examination status where required, protection and maintenance evidence and named acceptance.
- The current system identity, boundaries, safe limits and relevant assurance status support the acceptance decision. Relevant evidence. This is useful evidence for this example. System identity and changed boundary, relevant fluid/conditions and safe limits, the applicable written scheme and examination status where required, protection and maintenance evidence and named acceptance.
- A service invoice is treated as closing unknown written-scheme coverage. Insufficient evidence. This does not resolve the example’s acceptance gap. Routine maintenance is being credited for a different assurance duty. The modification changes the system boundary; the applicable duties and competent examination decision still need resolution.
- One zero gauge reading is accepted as proof that all connected pressure and stored energy are controlled. Insufficient evidence. This does not resolve the example’s acceptance gap. Routine maintenance is being credited for a different assurance duty. The modification changes the system boundary; the applicable duties and competent examination decision still need resolution.
Changed compressed-air system and unresolved scheme coverage: follow the changed condition
The boundary, protective device or operating conditions change after the previous examination. Follow the decision route; it supplies learning outcomes, not permission for real work.
A meaningful change
The boundary, protective device or operating conditions change after the previous examination. Revisit the basis of the affected decision instead of extending an earlier acceptance beyond its scope.
Worked record: what remains on hold?
Routine maintenance is being credited for a different assurance duty. The modification changes the system boundary; the applicable duties and competent examination decision still need resolution. The example remains unresolved until the changed system boundary and applicable examination arrangements have been resolved competently.
Worked record: what would support later acceptance?
System identity and changed boundary, relevant fluid/conditions and safe limits, the applicable written scheme and examination status where required, protection and maintenance evidence and named acceptance. The system user/owner controls acceptance and operation; the competent person makes the examination/scheme decision within the applicable pressure-system regime.
Follow the changed-condition decision
An installed compressed-air receiver has changed connected pipework and protective arrangements. A recent service invoice is offered as proof of readiness, but the relevant examination-scheme coverage has not been confirmed. Changed condition: The boundary, protective device or operating conditions change after the previous examination.
Follow the evidence gates and compare the outcome of an unresolved condition with an established one.
- Has the reviewer established that the changed system boundary and applicable examination arrangements have been resolved competently?
- Yes, the stated basis is established: That resolves this evidence question; check the separate readiness condition next. Next: Has the responsible owner established that the required evidence supports the safe limits and authorised acceptance of the actual arrangement?
- No, the basis remains unresolved: Do not infer acceptance from an incomplete or conflicting basis. Routine maintenance is being credited for a different assurance duty. The modification changes the system boundary; the applicable duties and competent examination decision still need resolution. Next: Example outcome: retain the hold point — Hold acceptance of the changed arrangement. Obtain competent review of applicability, scheme coverage and examination requirements, safe limits and the current operating condition before authorised use.
- Has the responsible owner established that the required evidence supports the safe limits and authorised acceptance of the actual arrangement?
- Yes, the required readiness evidence is established: In this fictional exercise, both evidence gates are established. Real work still follows its own authorised release. Next: Example outcome: record the verified basis for the authorised decision — Record the evidence, owner and limits of this example’s decision. The boundary, protective device or operating conditions change after the previous examination. is a reason to review it again; the course does not authorise actual work.
- No, readiness or competent cover is still missing: An agreed principle is not a usable arrangement. Resolve the missing condition before affected work proceeds. Next: Example outcome: arrange the missing protection or support — The system user/owner controls acceptance and operation; the competent person makes the examination/scheme decision within the applicable pressure-system regime. Re-plan the affected work and obtain evidence that the required readiness condition is met.
- Example outcome: retain the hold point
Hold acceptance of the changed arrangement. Obtain competent review of applicability, scheme coverage and examination requirements, safe limits and the current operating condition before authorised use.
- Example outcome: arrange the missing protection or support
The system user/owner controls acceptance and operation; the competent person makes the examination/scheme decision within the applicable pressure-system regime. Re-plan the affected work and obtain evidence that the required readiness condition is met.
- Example outcome: record the verified basis for the authorised decision
Record the evidence, owner and limits of this example’s decision. The boundary, protective device or operating conditions change after the previous examination. is a reason to review it again; the course does not authorise actual work.
Stored-energy boundary exercise
Map the fictional changed receiver’s connected energy and intervention boundary. Record who must resolve the examination/scheme question separately; the exercise neither decides PSSR applicability nor supplies a depressurisation procedure.
Fictional record — task and concern: An installed compressed-air receiver has changed connected pipework and protective arrangements. A recent service invoice is offered as proof of readiness, but the relevant examination-scheme coverage has not been confirmed.
Fictional record — decision: Hold acceptance of the changed arrangement. Obtain competent review of applicability, scheme coverage and examination requirements, safe limits and the current operating condition before authorised use.
Fictional record — owner: The system user/owner controls acceptance and operation; the competent person makes the examination/scheme decision within the applicable pressure-system regime.
Fictional record — verification and review: System identity and changed boundary, relevant fluid/conditions and safe limits, the applicable written scheme and examination status where required, protection and maintenance evidence and named acceptance. Review trigger: The boundary, protective device or operating conditions change after the previous examination.
Optional choices save on this browser, separately from recorded course progress. Live tools retain their own access and competent-review requirements.