Pressure systems and stored energy awareness · detailed source study
Optional reference study from the SHAREhub topic pages and selected source records used for this course. The core learning-time estimate excludes this extended reference.
A written scheme, report and maintenance record differ
A written scheme, report and maintenance record differ
Several regimes can apply to one asset. A competent examination plan, completed findings and maintenance evidence answer different questions. Identify vessel, connected pipework, protective devices and the actual boundary through the competent pressure-system process. The applicable scheme defines the scope and requirements for examination; it is not evidence that examination has been completed. An examination report records findings and actions. A maintenance record records work done; neither automatically closes the other’s requirements. The competent owners resolve applicable evidence and restrictions before use. Lifting planning and examination have their own route; no pressure settings, venting steps or intervals are supplied. ERICPD is a planning cross-map: Discipline verifies and sustains every control. ESEAP compares effectiveness.
A label does not authorise the task; retain the owner, evidence and stop or change decision.
What should a worker do before using work equipment?
Source: work-equipment-lifting-equipment-and-pressure-systems--first-actions
Confirm the equipment is the right type for the task, check guards and controls, inspect for obvious damage, understand the safe method and emergency response, keep others clear, and stop if condition or permission is uncertain. 2 linked parts. Follow the question numbers and complete the applicable route.
Part 1 of 2 · Questions 1–3 Source basis: GOV.UK placing UKCA or CE marked products on the Great Britain market · Provision and Use of Work Equipment Regulations 1998 · HSE INDG229 Using work equipment safely · HSE Introduction to work equipment and machinery · HSE L22 Safe use of work equipment · GOV.UK placing CE or CE and UKNI marked products on the Northern Ireland market · Provision and Use of Work Equipment Regulations Northern Ireland 1999 · HSE PUWER guidance and topic index · GOV.UK product regulations by sector and current marking approaches.
Confirm the equipment is the right type for the task, check guards and controls, inspect for obvious damage, understand the safe method and emergency response, keep others clear, and stop if condition or permission is uncertain. A machine, lifting device or pressure system may have overlapping duties, but a single certificate does not close every risk. Apply it: Which part of this plan would you check at the workface before authorising the task? A machine, lifting device or pressure system may have overlapping duties, but a single certificate does not close every risk. Identify the actual task and equipment, apply the workplace-use rules, then test whether lifting or qualifying pressure-system duties add planning, examination, written-scheme and competent-person requirements.
Authorisation, pre-use check, task briefing, any defect report and supervisor release. Apply it: What evidence would show that the change improves this task, rather than only completing a record? Setting: A fictional workshop receives an identified air-receiver system with connected pipework and protective devices. Act: The competent owners establish applicability and system boundary, then distinguish written scheme, examination findings and maintenance work. Hold / review: Keep affected operation held until required evidence, actions and operating acceptance are resolved; a document title alone is not release. Apply it: At which point would you hold this example, and what evidence would allow it to proceed? Load or attachment exceeds rated configuration: Collapse or dropped load can crush people below.
Defective lifting accessory: A sling or hook fails and the load swings or falls. Pressure system exceeds safe limit: Rupture or release causes blast, scald or toxic exposure. Apply it: Who could be exposed, including other trades, cleaners, maintainers and people nearby? Eliminate: Avoid an unnecessary suspended lift or pressure-dependent step by redesigning flow or assembling at a safe accessible position. Reduce, including substitution: Choose a lifting or process method with suitable capacity and controlled interfaces for the actual load, radius, pressure and substance. Isolate: Provide designed physical safeguards: separation from suspended loads, suitable lifting installation and pressure-system protective devices. Control: Plan and supervise lifting to its complexity and define pressure-system operating limits and required written scheme/examination arrangements.
PPE: Select PPE for remaining handling, splash or other task exposure, checking fit and compatibility. Read the full control table for qualifications, ownership and verification. Use the actual task and applicable jurisdiction; existing technical approval remains unchanged. Apply it: Which stronger option can be used here, and who will verify it before accepting the remaining risk? Use the full topic for the decision points, practical examples, detailed control tables and source scope. HSE guidance applies to Great Britain; use HSENI for the Northern Ireland route and the source’s stated jurisdiction. A simplified guide does not change the page’s technical-review or approval status. Apply it: Which official source and full-topic section will you use to resolve the next decision?
Keep one card or the full set for social sharing, team briefings and learning. Each PDF contains one card per page. Read the full topic for explanations, questions and source links. Confirm the equipment is the right type for the task, check guards and controls, inspect for obvious damage, understand the safe method and emergency response, keep others clear, and stop if condition or permission is uncertain. Confirm the equipment is the right type for the task, check guards and controls, inspect for obvious damage, understand the safe method and emergency response, keep others clear, and stop if condition or permission is uncertain. A machine, lifting device or pressure system may have overlapping duties, but a single certificate does not close every risk.
Apply it: Which part of this plan would you check at the workface before authorising the task? Use the evidence to improve the actual work arrangement. A machine, lifting device or pressure system may have overlapping duties, but a single certificate does not close every risk. Identify the actual task and equipment, apply the workplace-use rules, then test whether lifting or qualifying pressure-system duties add planning, examination, written-scheme and competent-person requirements. Authorisation, pre-use check, task briefing, any defect report and supervisor release. Apply it: What evidence would show that the change improves this task, rather than only completing a record? Fictional example: a practical application of the existing topic lesson. Setting: A fictional workshop receives an identified air-receiver system with connected pipework and protective devices.
Act: The competent owners establish applicability and system boundary, then distinguish written scheme, examination findings and maintenance work. Hold / review: Keep affected operation held until required evidence, actions and operating acceptance are resolved; a document title alone is not release. Apply it: At which point would you hold this example, and what evidence would allow it to proceed? Connect the task, the route to the person and the control that can fail. Load or attachment exceeds rated configuration: Collapse or dropped load can crush people below. Defective lifting accessory: A sling or hook fails and the load swings or falls. Pressure system exceeds safe limit: Rupture or release causes blast, scald or toxic exposure.
Apply it: Who could be exposed, including other trades, cleaners, maintainers and people nearby? Control summary. Read the complete task-specific controls and checks in the linked topic. Eliminate: Avoid an unnecessary suspended lift or pressure-dependent step by redesigning flow or assembling at a safe accessible position. Reduce, including substitution: Choose a lifting or process method with suitable capacity and controlled interfaces for the actual load, radius, pressure and substance. Isolate: Provide designed physical safeguards: separation from suspended loads, suitable lifting installation and pressure-system protective devices. Control: Plan and supervise lifting to its complexity and define pressure-system operating limits and required written scheme/examination arrangements. PPE: Select PPE for remaining handling, splash or other task exposure, checking fit and compatibility.
Read the full control table for qualifications, ownership and verification. Use the actual task and applicable jurisdiction; existing technical approval remains unchanged. Apply it: Which stronger option can be used here, and who will verify it before accepting the remaining risk? Follow the official sources below and retain the task-specific evidence. Use the full topic for the decision points, practical examples, detailed control tables and source scope. HSE guidance applies to Great Britain; use HSENI for the Northern Ireland route and the source’s stated jurisdiction. A simplified guide does not change the page’s technical-review or approval status. Apply it: Which official source and full-topic section will you use to resolve the next decision? Simplified learning guide.
Use the full topic and the actual work arrangements; existing technical-review and approval statuses still apply. Workplace scenarios labelled fictional are illustrative examples. Do not begin because the equipment ran yesterday, carries a conformity mark or belongs to a contractor. Check any recorded limitation, attachment, inspection status and local authorisation that the task actually requires. Identify equipment and task. During use: Use within assessed conditions.; At completion: Stop safely and leave controlled. Check guards, controls and condition. During use: Watch for change or defect.; At completion: Report defects and hand back. Confirm competence and area. During use: Keep others protected.; At completion: Record any hold or release.
Work equipment includes machinery, appliances, apparatus, tools and installations used at work, while use includes starting, stopping, programming, setting, transporting, repairing, modifying, maintaining, servicing and cleaning. A hand tool, office appliance, machine line, scaffold component, ladder, lift truck or process installation may be work equipment. The applicable controls depend on the actual use and risk, not the label or purchase value. Tool or appliance. Why it is in scope: Used to perform work.; Decision: Suitability and safe use. Machine or installation. Why it is in scope: Creates mechanical or other energy hazards.; Decision: Guarding, controls and lifecycle evidence. Cleaning or adjustment. Why it is in scope: It is use under Provision and Use of Work Equipment Regulations (PUWER).; Decision: Safe state and competent method.
Transport or modification. Why it is in scope: Can change condition or risk.; Decision: Planning, inspection and change control. PUWER controls equipment provided or used at work; product-supply rules govern placing products on a market. A CE, UK Conformity Assessed (UKCA) or CE and UK Northern Ireland (UKNI) route does not by itself prove workplace suitability, correct installation or safe use. Choose the GB or NI market route and the product sector before relying on conformity documentation. Separately complete workplace selection, risk assessment, guarding, installation, competence, inspection and maintenance decisions. Who will use it and for what? Workplace-use route: PUWER and other workplace law.; Product-supply route: Not the main market decision. May this product be placed on this market?
Workplace-use route: Does not answer safe-use question.; Product-supply route: Current GB or NI sector rules. Was it modified or assembled? Workplace-use route: Reassess safe use.; Product-supply route: May create manufacturer obligations. Sources: HSE INDG229 Using work equipment safely; HSE PUWER guidance and topic index; Provision and Use of Work Equipment Regulations 1998; Provision and Use of Work Equipment Regulations Northern Ireland 1999; HSE L22 Safe use of work equipment
How can lifting or pressure failures harm people?
How can lifting or pressure failures harm people?
Source: work-equipment-lifting-equipment-and-pressure-systems--harm-mechanisms
A failed sling or unstable lift can drop or swing a load into people; loss of containment can release hot, toxic or high-energy fluid. A shared piece of equipment can need separate safeguards and examinations for each failure pathway. Identify load path, lifting configuration, pressure source, safe limits, people exposed and the independent barriers. Hold the operation when a critical examination, written scheme or safe state is uncertain. Sources: HSE PUWER overview; HSE LOLER overview; HSE Pressure Systems Safety Regulations overview
How do PUWER, LOLER and pressure-system law fit together?
Source: work-equipment-lifting-equipment-and-pressure-systems--three-regime-decision
Use PUWER for the general safe-use duties of work equipment; add Lifting Operations and Lifting Equipment Regulations (LOLER) when the activity and equipment are within lifting law, and add Pressure Systems Safety Regulations (PSSR) where the pressure-system definition and application provisions are met. One asset can trigger more than one regime.
Source basis: Lifting Operations and Lifting Equipment Regulations 1998 · GOV.UK placing UKCA or CE marked products on the Great Britain market · Pressure Systems Safety Regulations 2000 · Provision and Use of Work Equipment Regulations 1998 · HSE GEIS6 MEWP selection management and use · HSE Inspection of work equipment · HSE L113 Safe use of lifting equipment · HSE L122 Safety of pressure systems · HSE LOLER overview · HSE Thorough examinations and inspections of lifting equipment · HSE Planning and organising lifting operations · Lifting Operations and Lifting Equipment Regulations Northern Ireland 1999 · GOV.UK placing CE or CE and UKNI marked products on the Northern Ireland market · Pressure Systems Safety Regulations Northern Ireland 2004 · Provision and Use of Work Equipment Regulations Northern Ireland 1999 · HSE Pressure Equipment Safety Regulations guidance · HSE Pressure Systems Safety Regulations overview · HSE Using pressure systems · HSE PUWER overview · HSE Work at height.
2 linked parts. Follow the question numbers and complete the applicable route.
Part 1 of 2 · Questions 1–3 Source basis: Lifting Operations and Lifting Equipment Regulations 1998 · Pressure Systems Safety Regulations 2000 · Provision and Use of Work Equipment Regulations 1998 · HSENI Work equipment and machinery guidance · HSE L113 Safe use of lifting equipment · HSE L122 Safety of pressure systems · HSE LOLER overview · HSE Planning and organising lifting operations · HSE Magnetic lifting devices · Lifting Operations and Lifting Equipment Regulations Northern Ireland 1999 · Pressure Systems Safety Regulations Northern Ireland 2004 · Provision and Use of Work Equipment Regulations Northern Ireland 1999 · HSE Pressure Equipment Safety Regulations guidance · HSE Pressure Systems Safety Regulations overview · HSE Using pressure systems · HSE PUWER overview · HSE Vacuum lifting equipment.
Do not infer that every pressure vessel needs a written scheme or that every vertical movement is LOLER lifting. Decide jurisdiction, equipment identity, use, relevant fluid, load and exceptions with competent evidence before choosing the route. Product-supply law is a separate question. Sources: HSE PUWER overview; Provision and Use of Work Equipment Regulations 1998; Provision and Use of Work Equipment Regulations Northern Ireland 1999; Lifting Operations and Lifting Equipment Regulations 1998; Lifting Operations and Lifting Equipment Regulations Northern Ireland 1999
How can the ISO 45001 hierarchy of controls reduce equipment, lifting and pressure-system risks?
Source: work-equipment-lifting-equipment-and-pressure-systems--control-priorities
Remove the hazard where reasonably practicable. If it remains, consider a safer method, engineering controls and safe work arrangements before personal protective equipment for residual risk. HSE places elimination, substitution, engineering, administrative controls and personal protective equipment in that order. Verify that the chosen controls work on the actual task. ERICPD (Eliminate, Reduce including substitution, Isolate, Control, personal protective equipment (PPE), Discipline) is a SHARE decision prompt cross-mapped to HSE’s five-level hierarchy. Choose stronger feasible controls first, verify them in the actual task and record why a stronger option cannot be used. Discipline means sustaining controls through maintenance, supervision and learning. ERICPD is a planning crossmap. Its prompts do not add a sixth rung or rank Isolate above engineering.
Discipline verifies and sustains every control level. The hierarchy of controls in ISO 45001:2018 comes under Clause 8.1.2 (Eliminating hazards and reducing OH&S risks), which is located within Clause 8 ("Operation"). ESEAP: Elimination, Substitution, Engineering controls, Administrative controls and PPE. Control order: HSE hierarchy of controls and IOSH hierarchy of control guidance. Sources: HSE hierarchy of control
What makes an activity a lifting operation?
Source: work-equipment-lifting-equipment-and-pressure-systems--lifting-scope
A lifting operation is concerned with lifting or lowering a load, including a person; determine whether the equipment and activity fall under the applicable GB or NI LOLER regime before using a lifting checklist. A mobile elevating work platform (MEWP) is one example whose actual lifting function and use need a competent scope decision. Conveyors, escalators, simple pallet trucks that only raise enough for travel, and public-use equipment can have different routes. A MEWP, hoist, crane, sling, lift truck or lifting attachment needs a task-specific decision. Do not equate any upward motion with LOLER. Crane or hoist. Question: What load and lift path?; Next step: LOLER and PUWER assessment. MEWP or people carrier.
Question: Are people lifted and what other height duties apply?; Next step: Specialist competent route. Conveyor or simple pallet truck. Question: Is this lifting within LOLER meaning?; Next step: Verify applicability; PUWER may still apply. Select equipment and accessories for the actual load, configuration, environment and failure modes; check marked safe working load and applicable configuration information before the lift. Capacity alone is not compatibility. Check the load mass and centre of gravity, attachment method, travel path, support and ground, foreseeable dynamic effects, people nearby and manufacturer limits. A magnet or vacuum attachment needs material and surface compatibility, not merely a matching mass.
Sources: HSE LOLER overview; Lifting Operations and Lifting Equipment Regulations 1998; Lifting Operations and Lifting Equipment Regulations Northern Ireland 1999; HSE L113 Safe use of lifting equipment; HSENI Work equipment and machinery guidance
Who plans and supervises lifting operations?
Who plans and supervises lifting operations?
Source: work-equipment-lifting-equipment-and-pressure-systems--lifting-plan
Every lifting operation involving lifting equipment must be properly planned by a competent person, appropriately supervised and carried out safely, with the depth of the plan proportionate to the foreseeable risk. Source basis: HSE Work equipment and machinery FAQs · Lifting Operations and Lifting Equipment Regulations 1998 · HSE GEIS6 MEWP selection management and use · HSENI Work equipment and machinery guidance · HSE Inspection of work equipment · HSE L113 Safe use of lifting equipment · HSE LOLER overview · HSE Thorough examinations and inspections of lifting equipment · HSE Planning and organising lifting operations · HSE Maintenance of work equipment · Lifting Operations and Lifting Equipment Regulations Northern Ireland 1999 · HSE Work at height.
Simple repeated work may use a suitable standing plan; unusual, complex or changed lifts need a specific competent review. Set roles, communication, load attachment, travel, exclusion, weather, ground and contingency before starting. A template alone is not a completed plan. Lifting people requires equipment and arrangements suitable for that purpose, with additional safeguards, escape and rescue decisions and thorough-examination requirements under the applicable lifting regime. Do not use a goods-only lifting device to carry people without a lawful and competent equipment-specific route. Confirm carrier, controls, fall and crushing risks, communication, rescue, capacity and the separate work-at-height or care-setting requirements where relevant. Is the carrier designed for people? Evidence: Manufacturer purpose and marking.; Stop: Goods-only or uncertain. Can people be protected and rescued?
Evidence: Task plan and emergency method.; Stop: Rescue not available. Is statutory examination current? Evidence: Competent report or scheme.; Stop: Missing or adverse report. Before lifting, identify equipment and load, check accessories and attachment, confirm the current plan and applicable examination evidence, inspect for visible defects, clear the route and verify people, ground, signals and stop arrangements. A pre-use check does not replace thorough examination, nor does an examination report replace the user check. Conditions may change after either record was made. Identity, markings, visible condition and report. During: Keep within assessed route and configuration.; After: Set down safely and inspect. Load, attachment, people, ground and signals. During: Stop for drift, alarm or change.; After: Record defects and handover.
Sources: HSE Planning and organising lifting operations; Lifting Operations and Lifting Equipment Regulations 1998; Lifting Operations and Lifting Equipment Regulations Northern Ireland 1999; HSE L113 Safe use of lifting equipment; HSE LOLER overview
How is LOLER thorough examination different from inspection?
Source: work-equipment-lifting-equipment-and-pressure-systems--lifting-examination
A LOLER thorough examination is a competent person's systematic, detailed assessment with a written report under the applicable law or competent examination scheme; a user check, PUWER inspection and maintenance are separate controls. The applicable law or scheme determines the examination timing and scope. Initial installation, reassembly, deterioration and exceptional events may trigger examination. Do not publish a universal site interval, use an old sticker alone, or treat routine overload testing as automatic. See HSE Thorough examinations and inspections of lifting equipment. A dangerous or potentially dangerous finding must be communicated and acted on through the applicable reporting route; withdraw equipment from use as required, control the area and use the competent report to decide repair, re-examination and release.
Do not treat a passed sticker, a maintenance action or production pressure as authority to override the report. The competent examiner and dutyholder have distinct reporting responsibilities; the exact statutory route depends on GB or NI law and the finding. Dangerous defect. Immediate action: Stop and prevent use.; Evidence: Report, quarantine and notification. Time-limited defect. Immediate action: Meet the report requirement or stop use.; Evidence: Action owner and deadline. Repair complete. Immediate action: Obtain required verification before use.; Evidence: Technical evidence and named release. The receiving organisation must verify equipment identity, suitability, condition, instructions and required examination evidence before use, while supplier, hirer and site owners coordinate their distinct duties. Reassembly at a new site or an exceptional event can trigger further examination.
Transfer records should follow the equipment; a delivery note is not a lift plan or proof of safe assembly. Supplier to hirer. Check: Identity, instructions, condition and reports.; Hold: Missing or mismatched evidence. Site assembly. Check: Competent installation and examination trigger.; Hold: Unverified assembly. Site to operator. Check: Task plan, competence, site limits and defects.; Hold: Unbriefed operator or changed site.
Sources: HSE Thorough examinations and inspections of lifting equipment; HSE L113 Safe use of lifting equipment; HSE Inspection of work equipment; HSE Maintenance of work equipment; Lifting Operations and Lifting Equipment Regulations 1998 For GB LOLER, unless a competent examination scheme specifies another interval, the usual periodic categories are six months for equipment lifting people and lifting accessories, and twelve months for other lifting equipment. Initial-use evidence, installation or reassembly and exceptional events need separate checks; a current periodic date does not cancel those triggers. The competent examiner determines the actual scheme and report requirements. Use the separate NI LOLER instrument and HSENI route for NI equipment, rather than transplanting this GB summary.
When does pressure-system law apply?
Source: work-equipment-lifting-equipment-and-pressure-systems--pressure-scope
Determine whether the system, relevant fluid and exclusions fall under GB PSSR 2000 or NI PSSR 2004 before deciding on safe limits, a written scheme and examination. Steam, compressed gas and some hot-water systems may be within scope, but applicability is not decided by a pressure gauge alone. Hydraulic oil systems can still be dangerous and require PUWER or other controls even when outside PSSR. Map vessel, pipework, pipeline, protective devices and fluid with competent advice. The user or owner must have safe operating limits established from competent system-specific evidence and operate within them; the page cannot set a pressure, temperature, flow or relief-device value. Check every component and protective device, including the weakest boundary, changed duty and repair history.
Manufacturer information and competent assessment control the actual limits. Ensure operators can see and act on them. Limits established. Evidence: Design and manufacturer data plus competent system assessment.; Stop: Unknown or conflicting limit. Protection suitable. Evidence: Verified device selection, setting and discharge route.; Stop: Defeated or uncertain protection. Operation within limits. Evidence: Readable indication and response.; Stop: Excursion or unreliable reading. Sources: HSE Pressure Systems Safety Regulations overview; HSE Using pressure systems; HSE L122 Safety of pressure systems; Pressure Systems Safety Regulations 2000; Pressure Systems Safety Regulations Northern Ireland 2004 HSE identifies steam at any pressure, compressed or liquefied gas above 0.5 bar gauge, pressurised hot water above 110 °C and gas dissolved under pressure as relevant-fluid categories. These are applicability clues, not operating limits.
Map the system and exceptions with the competent person. Under GB PSSR the installed-system user and mobile-system owner have distinct dutyholder routes; hired equipment still needs verified scheme and examination evidence. Apply the separate NI PSSR 2004 route in Northern Ireland.
What is a written scheme of examination?
What is a written scheme of examination?
Source: work-equipment-lifting-equipment-and-pressure-systems--pressure-written-scheme
For a qualifying pressure system, the user or owner must have a suitable written scheme before operation; a competent person draws it up or certifies it, and it identifies covered parts, examination methods, intervals and preparation for safe examination. Before first use of a qualifying system, the written scheme must be in place and the required examination undertaken; keep the system out of use until both are satisfied. Source basis: Pressure Systems Safety Regulations 2000 · HSENI L122 approved for use in Northern Ireland · HSE L122 Safety of pressure systems · HSE Maintenance of work equipment · Pressure Systems Safety Regulations Northern Ireland 2004 · HSE Pressure Systems Safety Regulations overview · HSE Using pressure systems.
The scheme must cover protective devices and relevant vessels or pipework whose failure could cause danger, subject to the applicable legal text and competent scope decision. It is not a maintenance schedule, a generic certificate or proof that an examination has happened. See HSE L122 Safety of pressure systems. The system parts in the written scheme must be examined by a competent person in accordance with that scheme, with reports and actions that show whether continued use is safe. The competent person needs suitable knowledge, resources, independence and authority for the actual system. Examination does not replace operator checks, maintenance, safe limits, protective devices or correct repair. Do not infer intervals from a generic boiler or compressor example.
Sources: HSE L122 Safety of pressure systems; HSE Pressure Systems Safety Regulations overview; Pressure Systems Safety Regulations 2000; Pressure Systems Safety Regulations Northern Ireland 2004; HSENI L122 approved for use in Northern Ireland
How are pressure systems operated and maintained?
Source: work-equipment-lifting-equipment-and-pressure-systems--pressure-operation
Operate within established safe limits using effective protective devices, competent people, clear instructions and a whole-system maintenance plan; isolate and depressurise safely before intervention. Pressure-system examination and maintenance are different. Include corrosion, leakage, alarms, relief devices, connections, pipework, environment, change and operator handover. A pressure indication of zero at one point is not proof that all stored energy is controlled. Start and run. Control: Limits, protection and competent operation.; Stop: Unreliable reading or excursion. Maintain. Control: Isolation, depressurisation, verification and safe access.; Stop: Trapped pressure or unknown connection. Handover. Control: Condition, defects and outstanding actions.; Stop: Unclear plant state.
Hold the affected system, assess the change against design and safe limits, update the written scheme when required, obtain competent examination where the scheme or law requires it, and release only after controlled testing and named acceptance. Repairs, replacement components, changed fluids and operating conditions can alter the pressure boundary. A maintenance completion or leak test alone is not statutory examination or authority to operate. Repair or replacement. Check: Material, design, protective devices and required examination.; Release condition: Competent evidence accepted. Changed duty. Check: Safe limits, scheme scope and instructions.; Release condition: Updated and approved basis. Commissioning test. Check: Controlled plan, exclusions and stop triggers.; Release condition: Documented operating handback.
Move people clear, raise the alarm, follow the site emergency plan and keep the system isolated from further operation; do not approach a leak, adjust a relief device or reopen a vessel until the hazard and safe state are established by authorised people. Treat vessel, line and connected process as potentially energised. Investigate cause and affected scope, protect others, obtain any required competent examination and controlled test, then require named operating acceptance. Leak or unusual sound. Immediate action: Withdraw and warn.; Restart barrier: No approach until assessed. Relief device operates. Immediate action: Escalate and preserve evidence.; Restart barrier: No reset-only return. Rupture or injury. Immediate action: Emergency response and exclusion.; Restart barrier: Investigation and competent release.
Sources: HSE Using pressure systems; HSE L122 Safety of pressure systems; HSE Maintenance of work equipment; Pressure Systems Safety Regulations 2000; Pressure Systems Safety Regulations Northern Ireland 2004
Can one inspection or certificate cover every duty?
Source: work-equipment-lifting-equipment-and-pressure-systems--examination-comparison
No. Keep a distinct evidence route for PUWER inspection, LOLER thorough examination, pressure written-scheme examination, maintenance, pre-use checks and product conformity; only a competent, lawful decision can determine any overlap. A contractor or insurer may supply a report, but the dutyholder must verify scope, findings, equipment identity and actions. A clear matrix prevents an in-date document for one duty being mistaken for another. Assess every relevant regime and the shared failure path, such as a pressure-powered lifting device, a pressurised attachment or a lift near a pressure vessel; coordinate the plant owners before work. A lifting plan cannot certify a pressure boundary, and a pressure written scheme cannot approve a suspended-load route.
Map energy, load, people, structures and simultaneous work, then hold until each competent decision and handover is complete. Pressure-powered lifting device. Combined question: Which components trigger LOLER and PSSR, if any?; Evidence: Two applicability decisions and integrated controls. Lift over pressure plant. Combined question: Could impact or collapse compromise pressure containment?; Evidence: Lift path and protection plan. Shared maintenance. Combined question: Who controls load, pressure and isolation?; Evidence: Joint permit, verification and handback. Sources: HSE Inspection of work equipment; HSE Thorough examinations and inspections of lifting equipment; HSE L122 Safety of pressure systems; HSE Pressure Equipment Safety Regulations guidance; GOV.UK placing UKCA or CE marked products on the Great Britain market
How do lifting and pressure controls change across settings?
How do lifting and pressure controls change across settings?
Source: work-equipment-lifting-equipment-and-pressure-systems--sector-transfer
A warehouse lift, patient hoist, construction crane and industrial boiler have different loads, people and technical limits. Apply the appropriate GB or NI workplace, lifting and pressure routes to the actual activity. A six-month or twelve-month shorthand does not replace the correct examination scheme or competent judgement. Check who owns the equipment and who has authority to stop use. Sources: HSE LOLER overview; HSE Pressure Systems Safety Regulations overview; HSENI Work equipment and machinery guidance; HSE GEIS6 MEWP selection management and use
Which Great Britain law applies to these decisions?
Source: work-equipment-lifting-equipment-and-pressure-systems--legal-gb-combined
In Great Britain, PUWER 1998 provides the work-equipment baseline, LOLER 1998 adds lifting duties, and PSSR 2000 adds pressure-system duties where each applies; HSWA and Management Regulations support risk assessment and safe systems. Use current amended legal text and HSE guidance. L22, L113 and L122 are Approved Code of Practice (ACOP) and guidance with specific status; product-supply regimes are separate. Applicability and exceptions require a competent review. See Provision and Use of Work Equipment Regulations 1998. Sources: Provision and Use of Work Equipment Regulations 1998; Lifting Operations and Lifting Equipment Regulations 1998; Pressure Systems Safety Regulations 2000; HSE L22 Safe use of work equipment; HSE L113 Safe use of lifting equipment
Which Northern Ireland law applies to these decisions?
Source: work-equipment-lifting-equipment-and-pressure-systems--legal-ni-combined
In Northern Ireland, PUWER NI 1999, LOLER NI 1999 and PSSR NI 2004 are separate legal routes; HSENI approves L122 for use with NI pressure-system law, while product-supply questions must follow the applicable NI market rules. Do not label the GB regulations as UK-wide. Check current NI legal effects and HSENI guidance, identify the actual system and operation, and seek competent NI advice before operational use. See Provision and Use of Work Equipment Regulations Northern Ireland 1999. Sources: Provision and Use of Work Equipment Regulations Northern Ireland 1999; Lifting Operations and Lifting Equipment Regulations Northern Ireland 1999; Pressure Systems Safety Regulations Northern Ireland 2004; HSENI L122 approved for use in Northern Ireland; HSENI Work equipment and machinery guidance
How should management arrangements be checked?
Source: work-equipment-lifting-equipment-and-pressure-systems--standards-boundaries
Assign responsibility, assess the actual risk, implement controls, monitor whether they work and review after change or failure. HSE’s Plan, Do, Check, Act guidance supports management review. It does not replace topic-specific law, technical assessment or competent sign-off. Sources: HSE Managing for health and safety (HSG65)
How should work equipment be controlled across its life?
Source: work-equipment-lifting-equipment-and-pressure-systems--lifecycle
Control starts with need and specification, continues through purchase or hire, acceptance, installation, use, inspection, maintenance and change, and ends with safe decommissioning or disposal. Treat each transfer as an evidence gate. A check at purchase does not cover later deterioration, modification, relocation, new attachments, changed users or a different environment. Select. Critical question: Is this the right equipment and control concept?; Evidence: Specification and risk decision. Accept and install. Critical question: Is identity, condition and setup proven?; Evidence: Acceptance and commissioning. Use and maintain. Critical question: Does it remain safe in real work?; Evidence: Checks, defects, maintenance and inspection. Change or retire. Critical question: Has risk changed or energy been removed?; Evidence: Change review or decommission record.
Assess mechanical contact and ejection together with electrical, pressure, thermal, chemical, ergonomic, noise, vibration, fire, explosion, mobility, stability and work-at-height hazards that the equipment or task can create. Consider normal production, foreseeable abnormal events, clearing blockages, tool change, cleaning, testing, breakdown, maintenance and recovery after a stop. People nearby can be exposed even when they do not operate the equipment. Mechanical. Examples: Crushing, shearing, cutting, entanglement, drawing-in, ejection.; Control question: Can access or energy be prevented? Energy. Examples: Electricity, pressure, gravity, heat, stored motion.; Control question: Can every source be isolated and dissipated? Exposure. Examples: Dust, fume, noise, vibration, substances.; Control question: Which separate regime and source control apply? Context. Examples: Mobility, stability, falls, traffic, fire.; Control question: What environment and interface change the risk?
Select equipment that is suitable for the intended task, people, environment, loads and conditions, with risks controlled by design and compatible guards, controls, attachments and information. Prefer eliminating hazardous operations or choosing safer equipment before adding procedural controls. Include cleaning, maintenance, access, foreseeable misuse and emergency recovery in the selection decision. Task and capacity. Question: Can it do the work within maker limits?; Reject or hold when: Duty or attachment is unclear. People. Question: Can intended users operate and maintain it safely?; Reject or hold when: Access, reach or competence is unsuitable. Environment. Question: Is it suitable for wet, dusty, explosive or public conditions?; Reject or hold when: Protection or compatibility is unproven. Lifecycle.
Question: Can it be inspected, isolated and maintained?; Reject or hold when: Safe intervention cannot be achieved. A conformity mark supports the applicable product-supply process; it does not prove that equipment is suitable for a particular workplace, correctly installed, maintained, guarded for every task or safe after modification. In Great Britain, current guidance recognises UKCA and CE routes within their stated scope. In Northern Ireland, use the current CE or CE and UKNI route as applicable. Always check sector-specific rules and current dates. Declaration and marking. What it supports: Product-supply conformity route.; What it cannot replace: Task suitability and risk assessment. Instructions. What it supports: Intended use and residual risk information.; What it cannot replace: Safe local installation and supervision. Workplace acceptance.
What it supports: Condition and integration at the site.; What it cannot replace: Required ongoing maintenance and inspection. Verify identity, condition, documentation, correct market route where relevant, intended use, guards, controls, accessories, installation needs, inspection status and support before the equipment enters service. Record deviations and quarantine anything damaged, incomplete, unexpectedly modified or unsupported. Delivery paperwork alone is not a commissioning record. Identity and specification. Evidence: Model, serial or asset reference and intended duty.; Hold point: Mismatch or unknown origin. Condition and completeness. Evidence: Damage check, guards, accessories and instructions.; Hold point: Missing or damaged safety part. Legal and support route. Evidence: Applicable supplier documents and service support.; Hold point: Wrong market route or no critical information. Workplace readiness.
Evidence: Installation, risk assessment and training plan.; Hold point: Site prerequisites absent. Sources: HSE PUWER overview; HSE L22 Safe use of work equipment; HSE INDG291 Providing and using work equipment safely; Management of Health and Safety at Work Regulations 1999; Management of Health and Safety at Work Regulations Northern Ireland 2000
What belongs in a pre-use check?
What belongs in a pre-use check?
Source: work-equipment-lifting-equipment-and-pressure-systems--pre-use
A pre-use check should cover visible condition, correct setup and attachment, guards and protective devices, controls, cables or hoses, stability, work area and any equipment-specific indicator identified by the assessment or manufacturer. A quick user check is not a substitute for a formal inspection. Its content and record depend on risk, equipment and the organisation's system; do not invent a universal checklist or sign-off interval. Condition. Example observation: Damage, wear, leakage or loose part.; Action: Stop and report if safety may be affected. Safeguards. Example observation: Guard or device missing, open or defeated.; Action: Do not use; quarantine. Controls. Example observation: Start, stop or indication abnormal.; Action: Hold pending competent decision. Area and task.
Example observation: Wrong attachment, unstable base or people exposed.; Action: Correct conditions before start. Use equipment only for the assessed task and conditions, keep safeguards in place, maintain exclusion and stability, watch for abnormal sound, movement, heat, vibration, leakage or control response, and stop before investigating a change. Do not reach through a guard, defeat a device, clear a blockage live or rely on familiarity. A change in material, attachment, operator, environment or production method can invalidate the starting decision. Unexpected movement or ejection. Immediate response: Stop from a safe position.; Next decision: Quarantine and investigate. Guard or device changes state. Immediate response: Stop work and keep clear.; Next decision: Competent safeguarding review. Abnormal noise, heat or vibration.
Immediate response: Stop without close diagnosis.; Next decision: Maintenance assessment. Task or environment changes. Immediate response: Pause the job.; Next decision: Reassess method and suitability. Stop the equipment through the defined sequence, leave moving and stored energy controlled, clean without entering danger, record defects or restrictions, and hand back the equipment and area in a known state. Completion is not permission for maintenance. Any intervention requiring access to danger or stored energy needs its own isolation and authorised method. Normal stop. Expected state: Movement ceases through intended control.; Evidence: User observation. Secure and clean. Expected state: No unintended access, restart or unsafe residue.; Evidence: Task completion check. Report. Expected state: Defects and restrictions are visible to the next user.; Evidence: Tag, log or handover.
Hand back. Expected state: Named owner accepts status.; Evidence: Release or continued hold. Sources: HSE Inspection of work equipment; HSE INDG229 Using work equipment safely; HSE L22 Safe use of work equipment; HSE PUWER guidance and topic index; HSENI machinery safety devices safety alert
What is the guarding hierarchy?
Source: work-equipment-lifting-equipment-and-pressure-systems--guarding
Prevent access to dangerous parts with fixed guards where practicable, then use other guards or protection devices, then jigs, holders or push-sticks, with information, instruction, training, supervision and PPE only for remaining risk. A guard must be suitable, effective, maintained, not easily bypassed and not create a new hazard. Guard design and safe distance are equipment-specific engineering decisions, not values to copy from this guide. Protective devices must be selected for the risk, correctly installed, effective, maintained and used; a bypassed, defeated, poorly aligned or unreliable device is a stop and quarantine condition. Do not tape, wedge, bridge, override or programme around a device to maintain production. Diagnostic or test modes require a designed safe method, restricted authority and equipment-specific controls. Device functions normally.
Meaning: Only evidence for the tested safeguard function.; Response: Continue within assessed use. Intermittent trip. Meaning: Possible fault or changing condition.; Response: Stop, quarantine and diagnose safely. Bypass found. Meaning: Safeguard no longer reliable.; Response: Isolate as needed and escalate. Reset restores operation. Meaning: Does not explain cause.; Response: Investigate before release. Controls should be identifiable, appropriate, reachable from a safe position, protected against unintended operation where needed, and arranged so starting occurs only through deliberate action and stopping brings equipment to a safe state. The operator must understand normal stop, emergency response, reset and restart. A reset should not itself create hazardous movement unless the assessed control design specifically provides safe conditions. Start.
Expected behaviour: Deliberate action with danger zone clear.; Verification: Commissioning and user check. Normal stop. Expected behaviour: Brings operation to intended safe state.; Verification: Functional test. Mode or selector. Expected behaviour: Controls access and authority for the chosen mode.; Verification: Restricted setting and instruction. Restart. Expected behaviour: No unexpected movement after interruption or reset.; Verification: Cause and safe-state check. An emergency stop is additional rapid protection, not normal stopping or full isolation. After use, move clear, warn and report, exclude people and control connected equipment; do not reset, enter or investigate until authorised people apply equipment-specific energy isolation. The named operating owner releases only after cause, repair, safeguard and controlled-test evidence is accepted.
After use, keep people clear, establish the plant state and investigate the event. Releasing or resetting an emergency stop does not prove the machine is safe and must not by itself restart hazardous motion. When is it used? Answer: For an emergency requiring rapid stop.; Boundary: Not the routine production stop. What does it do? Answer: Acts with priority as designed.; Boundary: May not remove every energy source. Does it isolate? Answer: Not necessarily.; Boundary: Apply the full isolation procedure. Can it be reset and run? Answer: Only after cause and safe state are verified.; Boundary: Named return-to-service authority governs. Sources: HSE L22 Safe use of work equipment; HSE PUWER overview; HSENI machinery safety devices safety alert; HSE INDG291 Providing and using work equipment safely
How should equipment be isolated?
How should equipment be isolated?
Source: work-equipment-lifting-equipment-and-pressure-systems--isolation
Identify every energy source, stop and separate the equipment, prevent reconnection or release, dissipate or restrain stored energy, verify the safe state, control the work and restore only through the authorised sequence. Electrical isolation alone may leave hydraulic, pneumatic, pressure, thermal, gravity, spring, rotational or process energy. The actual isolation points, verification method and lock-off arrangements must come from competent equipment-specific planning. Plan maintenance as work in its own right: define scope, condition, isolation, access, competence, tools, parts, coordination, testing, safeguards and handback before intervention begins. Maintain equipment in an efficient state and good repair. Where maintenance cannot be done at rest, use an equipment-specific safe method and protection designed for that task; routine production pressure never supplies the justification. Prepare.
Control: Scope, hazards, safe state and people.; Evidence: Work order or task plan. Intervene. Control: Isolation, access, tools and coordination.; Evidence: Permit or maintenance record. Test. Control: Controlled test with restricted exposure.; Evidence: Functional and safeguard results. Hand back. Control: Covers, guards and settings restored.; Evidence: Named acceptance and release. Inspect after installation where safety depends on installation, after assembly at a new site where applicable, and at suitable risk-based intervals or after exceptional circumstances that may jeopardise safety. Frequency depends on the equipment, use, conditions, deterioration, manufacturer information and experience. This guide sets no blanket daily, weekly, annual or other interval. Installation or assembly. Purpose: Prove safe installation before use.; Decision basis: Equipment and installation dependency. Deterioration risk.
Purpose: Detect safety-relevant decline in time.; Decision basis: Risk, use, conditions and experience. Exceptional event. Purpose: Assess damage or loss of integrity.; Decision basis: Accident, modification, long disuse or severe condition. User check. Purpose: Identify obvious immediate defects.; Decision basis: Separate from formal inspection where required. Stop use where safety may be affected, bring the equipment to a controlled state, prevent further use, identify the defect, protect others, report it and keep it quarantined until competent evidence supports release. Do not remove a tag, swap a guard, clear a jam or press reset as an informal return to service. The severity, affected equipment and connected systems must be understood first. Immediate danger.
Action: Stop, keep clear and isolate if safe and trained.; Release condition: Emergency or competent recovery route. Safety device or guard defect. Action: Quarantine equipment.; Release condition: Repair and safeguarding verification. Condition uncertain. Action: Treat as held.; Release condition: Competent inspection and evidence. Minor non-safety issue. Action: Record and manage under local system.; Release condition: Decision still documented. Sources: HSE Maintenance of work equipment; HSE L22 Safe use of work equipment; HSE Electrical safety at work; HSE PUWER overview; HSE Inspection of work equipment
What must each role learn and demonstrate?
Source: work-equipment-lifting-equipment-and-pressure-systems--role-competence
Competence must match the decision and consequence of error. Attendance alone does not show that a worker, manager or specialist can recognise a stop condition, select a control and verify it in practice. Use observed tasks and scenario questions. Reassess after change, defect, incident or a materially different role, and seek a specialist for technical or legal decisions outside local competence. Sources: HSE Planning and organising lifting operations; HSE Thorough examinations and inspections of lifting equipment; HSE L122 Safety of pressure systems
How should modification and change be controlled?
Source: work-equipment-lifting-equipment-and-pressure-systems--modification-change
Keep modified, relocated, integrated or reprogrammed equipment out of normal work until the affected scope and product-supply duties are resolved, safeguards restored, applicable inspection or examination and controlled tests pass, and the named operating owner records release. A diagnostic or commissioning test under a separate controlled plan is not production permission. A change that appears to improve output can alter stability, access, stopping, control logic, load, exposure or maintenance. Keep the equipment held until technical, operational and legal boundaries are resolved. New attachment or duty. Workplace-use question: Is equipment still suitable and guarded?; Product-supply question: Does intended use or conformity scope change? Control or software change. Workplace-use question: Are modes, stops and restart safe?; Product-supply question: Who now takes manufacturer responsibility? Refurbishment.
Workplace-use question: Is condition and performance demonstrated?; Product-supply question: Is it substantially changed or newly supplied? Integration. Workplace-use question: Are whole-system risks controlled?; Product-supply question: Does an assembly become a new product? Users, supervisors and those who manage, inspect, maintain or modify equipment need adequate information, instruction and training for their role, with competence demonstrated for the actual equipment and task. Simple equipment may be covered by suitable in-house instruction; complex or high-risk work may need specialist training and supervised experience. There is no universal certificate or refresher expiry. User. Competence content: Normal use, checks, limits, defects and emergency response.; Review trigger: New equipment, task or performance concern. Supervisor. Competence content: Authorisation, observation, stop and release.; Review trigger: Change or control failure. Maintainer or inspector.
Competence content: Technical method, isolation and judgement.; Review trigger: Design change or scope extension. Manager or purchaser. Competence content: Suitability, interfaces and assurance.; Review trigger: New process, supplier or regime. Supervision should verify authorised people, correct equipment and setup, guards and controls, the actual method, conditions during use, defect response and handback, with closer oversight where competence or risk requires it. Supervision is an active control, not a signature. It should detect drift such as routine bypassing, wrong attachments, informal repairs, missed checks or production pressure overriding a hold. Start. Observation: Identity, setup, guards and people.; Response: Permit or hold. Work. Observation: Real behaviour and machine response.; Response: Coach, correct or stop. Change. Observation: New material, mode or environment.; Response: Pause and reassess. Finish.
Observation: Defects, state and handback.; Response: Release or quarantine. Hiring does not remove workplace-use duties: the supplier or hirer may have supply and maintenance obligations, while the employer or person controlling use must still ensure suitability, safe condition, inspection evidence, competence and safe operation. Agree in writing who selects, delivers, inspects, maintains, responds to defects and removes the equipment. Verify the agreement against what arrives and how it will actually be used. Supplier or hire company. Question: What is supplied, maintained and documented?; Evidence: Specification, instructions and inspection evidence. Hiring organisation. Question: Is it suitable for the actual workplace and task?; Evidence: Acceptance and risk assessment. User and supervisor. Question: Are setup, competence and daily condition controlled?; Evidence: Briefing, checks and defect route.
Breakdown or return. Question: Who makes safe and who authorises movement?; Evidence: Call-out, isolation and handover. The host and contractor should exchange task, site, equipment, competence, inspection, maintenance, isolation, emergency and defect information, then agree who controls each decision before work starts. A contractor-owned machine is not automatically acceptable, and a host permit does not prove its condition. Shared or connected systems need one coordinated safe state and clear release authority. Verify equipment and documents. During work: Coordinate exclusions and site conditions.; Handback: Report defects and restrictions. Agree isolation and emergency interfaces. During work: Stop on mismatch or unsafe change.; Handback: Jointly confirm equipment and area state. Name decision owners. During work: Protect other employers and the public.; Handback: Retain required evidence.
Sources: HSENI Refurbished and modified machinery; HSE Introduction to work equipment and machinery; GOV.UK placing UKCA or CE marked products on the Great Britain market; GOV.UK placing CE or CE and UKNI marked products on the Northern Ireland market; HSE Training and competence for work equipment
Which specialised regimes may also apply?
Which specialised regimes may also apply?
Source: work-equipment-lifting-equipment-and-pressure-systems--specialised-regimes
PUWER is not a complete answer where equipment lifts loads or people, contains pressure, uses electricity, supports work at height, creates substances, noise or vibration, or can ignite a dangerous atmosphere. Determine applicability for the real equipment and task in the correct jurisdiction. Sector regimes for construction, mines, quarries, agriculture, rail or merchant shipping may also change duties and enforcement routes. Lifting loads or people. Additional route: LOLER or NI equivalent as applicable.; Boundary: Separate thorough-examination and planning decisions. Pressure or electricity. Additional route: Pressure-systems or electrical-safety law.; Boundary: Specialist integrity and isolation. Work at height. Additional route: Work-at-height law.; Boundary: Access selection and fall prevention. Dust, fume, noise, vibration or flammables.
Additional route: COSHH, DSEAR, noise or vibration law.; Boundary: Separate exposure and ignition decisions. Raise the alarm, stop or isolate only through trained actions that are safe from the person's position, keep people out of danger, call the site emergency route and preserve the equipment state for competent recovery and investigation. Do not approach moving, energised, pressurised, hot, unstable or damaged equipment to diagnose it. Rescue, firefighting and first-aid actions must follow the site plan and trained roles. Person in danger. Immediate action: Raise alarm and use designed emergency control if safe.; Prohibited assumption: Do not enter the danger zone. Unexpected movement or release. Immediate action: Keep clear and stop connected work.; Prohibited assumption: Emergency stop is not full isolation. Fire, pressure or electrical event.
Immediate action: Use the site emergency plan.; Prohibited assumption: Do not improvise specialist response. After the event. Immediate action: Maintain exclusion and control evidence.; Prohibited assumption: No restart because conditions appear normal. The named operating owner should authorise return only after the cause is understood, repairs and safeguards are complete, inspection or testing matches the defect and risk, people are clear, documentation is updated and restrictions are communicated. Repair completion, a reset, a replaced fuse, an inspection sticker or production need is not enough by itself. Serious events or modifications may require engineering, safeguarding, electrical, pressure, lifting or legal review. Cause. Required evidence: Defect or event understood.; Owner: Competent investigator or specialist. Restoration. Required evidence: Repair and safeguards verified.; Owner: Maintainer and tester. Readiness.
Required evidence: Method, competence, area and interfaces ready.; Owner: Supervisor and affected parties. Authorisation. Required evidence: Signed or recorded release.; Owner: Named operating owner. Sources: HSE LOLER overview; HSE Pressure systems; HSE Electrical safety at work; HSE Work at height; HSE Dangerous substances and explosive atmospheres
Who owns each work-equipment decision?
Source: work-equipment-lifting-equipment-and-pressure-systems--roles
Assign owners for specification, acceptance, use, inspection, maintenance, isolation, modification, quarantine, emergency control and return to service; do not let responsibility disappear between departments or companies. One person may hold several roles, but the evidence and competence requirements remain distinct. Emergency command and later operational release are separate decisions. Specification and acceptance. Typical owner: Purchaser and technical owner.; Interface: User and maintenance input. Use and supervision. Typical owner: Operating manager or supervisor.; Interface: Worker and nearby people. Inspection and maintenance. Typical owner: Competent person and asset owner.; Interface: Defect and isolation system. Return to service. Typical owner: Named operating owner.; Interface: Technical evidence and affected parties.
Sources: HSE PUWER overview; HSE Work equipment and machinery FAQs; Management of Health and Safety at Work Regulations 1999; Management of Health and Safety at Work Regulations Northern Ireland 2000
How should work-equipment control be assured?
Source: work-equipment-lifting-equipment-and-pressure-systems--assurance
Assurance should test whether equipment is suitable, safeguards work, defects are controlled, inspections and maintenance match risk, competence is real, contractor interfaces work and return-to-service decisions are evidence based. Use field observation and equipment sampling, not record presence alone. Trend repeated guard damage, bypasses, emergency stops, overdue actions, recurring faults and differences between shifts or sites. Is the inventory complete? Evidence: Assets, location, owner and status.; Escalation: Unknown equipment held. Do safeguards work in practice? Evidence: Observed use and functional evidence.; Escalation: Bypass or drift quarantined. Are defects closed? Evidence: Traceable report, repair and release.; Escalation: Repeat or overdue issue reviewed. Are people competent? Evidence: Demonstration and supervision.; Escalation: Restriction or refresher based on need.
Missing or defeated guards, unexpected movement, unreliable controls, recurring trips, damaged cables or hoses, leaks, unstable equipment, unknown modifications, expired required evidence or informal repairs require a stop, hold or competent review. Also treat emergency-stop use, reports that workers must reach into danger, and workarounds that have become normal as control failures rather than operator inconvenience. Guard opened or removed for production. Likely weakness: Safeguarding and workflow conflict.; Action: Stop and redesign or restore. Frequent reset or emergency stop. Likely weakness: Unresolved fault or process instability.; Action: Quarantine and investigate. Temporary tape, wedge or bridge. Likely weakness: Device defeated.; Action: Prevent use and escalate. Inspection or modification unclear. Likely weakness: Evidence gap.; Action: Hold pending competent decision.
Sources: HSE Inspection of work equipment; HSE Training and competence for work equipment; HSE L22 Safe use of work equipment; HSENI machinery safety devices safety alert; HSE INDG229 Using work equipment safely
What do complete work-equipment decisions look like?
Source: work-equipment-lifting-equipment-and-pressure-systems--operational-examples
Four complete fictional BuildOut Ltd cases cover routine guarded-drill work, hired mobile equipment, an overhead-hoist evidence mismatch and a changed compressed-air system. The four scenario-type summaries are decision prompts, not ten worked cases. Actual equipment, jurisdiction, examination evidence and named authorisation govern. BuildOut Ltd could use one asset lifecycle with risk-based gates for specification, acceptance, authorisation, use, defects, maintenance, inspection, change and release, while applying the correct GB or NI and specialist regime at each site. The fictional model keeps operations, engineering, procurement and contractors connected. It does not replace equipment-specific instructions, examinations, limits or site authority. Specify. BuildOut owner: Procurement plus technical and user leads.; Minimum evidence: Task, environment and safeguard requirements. Accept.
BuildOut owner: Asset owner and competent installer.; Minimum evidence: Identity, condition, documentation and commissioning. Operate. BuildOut owner: Supervisor and authorised user.; Minimum evidence: Checks, competence and method. Hold and release. BuildOut owner: Operating owner with technical evidence.; Minimum evidence: Defect closure and recorded authorisation. Each example is a training pattern, not an equipment permission. Replace every fictional detail with the real machine, manufacturer instructions, energy sources, people, environment, inspection status and named authority.
Sources: HSE PUWER overview; Management of Health and Safety at Work Regulations 1999; Management of Health and Safety at Work Regulations Northern Ireland 2000; HSE PUWER guidance and topic index; HSE Inspection of work equipment The previously advertised hired-MEWP report mismatch and unexpected autoclave vent remain useful discussion prompts, rather than completed additional cases here. A report mismatch holds the equipment pending identity/scope resolution; an unexpected vent requires the site’s safe stop or emergency route and competent pressure-system investigation before a separately authorised return. General guarding, maintenance, unknown modification and emergency-stop interfaces remain in the existing scenario summaries and main guidance; none supplies permission for the actual equipment.
Acronyms and terms
Acronyms and terms
Source: work-equipment-lifting-equipment-and-pressure-systems--terms
Keep work equipment, use, guard, protection device, emergency stop, isolation, inspection, maintenance, competent person, quarantine and return to service distinct. Sources: Provision and Use of Work Equipment Regulations 1998; Provision and Use of Work Equipment Regulations Northern Ireland 1999; HSE L22 Safe use of work equipment
Routine guarded pillar-drill task
Source: work-equipment-lifting-equipment-and-pressure-systems--example--routine-guarded-drill
Task Material And Setting: Fictional training only, not authorisation for a real drill. An authorised user checks the task, material, workholding, guard, controls and area before use. Stop and hold for a loose workpiece, damaged bit, guard or control defect, unusual response or intrusion; never adjust while moving. Use the normal stop, wait for movement to cease and record defects. The workshop supervisor accepts the pre-use, briefing, defect-closure and safe handback evidence before release under the applicable GB or NI PUWER route. People And Prerequisites: Authorised user and workshop supervisor; suitable drill, correct workholding and bit, current local assessment, functioning guard and controls, safe area and known defect route.
Before: Confirm the task and material, inspect the drill, guard, workholding and emergency control, remove loose items, set the work securely and keep others outside the operating space. During: Keep the guard and workholding in position, use the intended controls, observe sound, movement and swarf, and stop before any adjustment or clearing. Hold Or Stop: Do not start or continue for a loose workpiece, damaged bit, missing or defeated guard, unreliable control, unusual movement, unexpected material response or unauthorised person in the area. Completion And Hand Back: Stop through the normal control, wait for movement to cease, leave the machine and area clean through the safe method, record any defect and hand back in a known state.
Evidence: Authorisation, pre-use check, task briefing, any defect report and supervisor release. Source boundary: Fictional training only, not equipment permission. Apply the actual GB or NI PUWER, LOLER or PSSR route as appropriate, with task-specific manufacturer information, competent assessment, evidence and named release.
Hired mobile equipment arrives on site
Source: work-equipment-lifting-equipment-and-pressure-systems--example--hired-mobile-platform
Task Material And Setting: Fictional training only, not permission to operate hired plant. Keep the platform out of service while identity, condition, instructions, applicable PUWER inspection and LOLER examination evidence, ground, route, weather, rescue plan and competence are checked. Reject or quarantine any mismatch or uncertainty; obtain supplier and competent site clarification. The site supervisor accepts use only on the actual evidence and records defects and return handover. People And Prerequisites: Hire supplier, site logistics lead, competent equipment assessor, authorised operator and supervisor; agreed specification, delivery evidence, site assessment, ground and route plan, rescue and defect arrangements, and any specialised examination evidence required.
Before: Match the delivered machine to the order, inspect condition and documentation, verify inspection or examination evidence applicable to the machine, confirm ground, access, weather and interface controls, and brief the authorised operator. During: Use only within manufacturer and site limits, maintain route and people controls, observe stability and machine response, and stop for changed ground, weather, load, alarm or condition. Hold Or Stop: Reject or quarantine the equipment for identity mismatch, damage, missing safety information, uncertain inspection or examination status, wrong attachment, unsuitable ground, unavailable rescue arrangements or unverified operator competence. Completion And Hand Back: Park and secure through the agreed method, record condition and defects, prevent further use where held, and complete a joint handover to the supplier or site owner.
Evidence: Hire specification, delivery and acceptance record, applicable inspection or examination evidence, operator authorisation, daily checks, defect history and return handover. Source boundary: Fictional training only, not equipment permission. Apply the actual GB or NI PUWER, LOLER or PSSR route as appropriate, with task-specific manufacturer information, competent assessment, evidence and named release.
Overhead hoist: accessory identity does not match the report
Source: work-equipment-lifting-equipment-and-pressure-systems--example--overhead-hoist-evidence
Task Material And Setting: Fictional workshop lift of a fabricated frame. The planned sling identity differs from the available examination report; no load is lifted. People And Prerequisites: Lifting planner, competent examiner and operating owner; actual load/configuration, suitable equipment, lift plan and applicable GB or NI examination route. Before: Match hoist and accessory identities, capacity/configuration and required reports to the planned lift; check site conditions and operator competence. During: Keep the lift on hold while the supplier and competent examiner resolve the mismatch. Do not trial the lift to prove the sling is sound. Hold Or Stop: Missing identity, scope mismatch, unresolved defect or changed configuration prevents lifting.
Completion And Hand Back: The operating owner releases only after matching accepted evidence, any required examination/defect closure, a checked lift plan and team briefing. Evidence: Asset/accessory identities, relevant examination report, defect disposition, plan and named release record. Source boundary: Fictional teaching application of the cited regulator guidance; actual equipment, jurisdiction, competent examination and authorisation govern. Not a work instruction.
Changed compressed-air system: scheme coverage unresolved
Source: work-equipment-lifting-equipment-and-pressure-systems--example--changed-air-system
Task Material And Setting: Fictional installed compressed-air receiver with changed connected pipework and protection. The existing written scheme has not been confirmed to cover the changed system; pressure operation is held. People And Prerequisites: Installed-system user, competent pressure-system person and authorised engineering team; fluid, boundary, modifications and applicable GB or NI PSSR scope established. Before: Compare actual system identity, relevant fluid, protective devices and change record with safe-limit and scheme documentation. During: Keep pressure operation prohibited while the competent person reviews scheme coverage, examination needs and protection evidence. Control maintenance energy through the approved system-specific method. Hold Or Stop: Unknown scope, absent required scheme/examination evidence, unresolved protection or limits prevents use; no generic pressure setting is supplied.
Completion And Hand Back: The responsible user authorises operation only after accepted safe-limit evidence, a suitable written scheme, required completed examination, closed defects and operator briefing. Evidence: System boundary/change record, scheme version, examination findings, protection verification, instructions and named user release. Source boundary: Fictional teaching application of the cited regulator guidance; actual equipment, jurisdiction, competent examination and authorisation govern. Not a work instruction.
Source tables and records 1
How can lifting or pressure failures harm people? decision table
Table ID: work-equipment-lifting-equipment-and-pressure-systems-harm-mechanisms
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html
Row 1
- Column 1
Load or attachment exceeds rated configuration
- Column 2
Collapse or dropped load can crush people below.
- Column 3
Use a planned lift, marked safe working load and verified configuration; stop when rating or ground is uncertain.
Row 2
- Column 1
Defective lifting accessory
- Column 2
A sling or hook fails and the load swings or falls.
- Column 3
Pre-use check plus competent thorough examination; withdraw a dangerous defect.
Row 3
- Column 1
Pressure system exceeds safe limit
- Column 2
Rupture or release causes blast, scald or toxic exposure.
- Column 3
Defined safe limits, protective devices and written-scheme examination; isolate on abnormal pressure.
Read the complete comparison table
| Row | Column 1 | Column 2 | Column 3 |
|---|---|---|---|
| 1 | Load or attachment exceeds rated configuration | Collapse or dropped load can crush people below. | Use a planned lift, marked safe working load and verified configuration; stop when rating or ground is uncertain. |
| 2 | Defective lifting accessory | A sling or hook fails and the load swings or falls. | Pre-use check plus competent thorough examination; withdraw a dangerous defect. |
| 3 | Pressure system exceeds safe limit | Rupture or release causes blast, scald or toxic exposure. | Defined safe limits, protective devices and written-scheme examination; isolate on abnormal pressure. |
How do PUWER, LOLER and pressure-system law fit together?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-three-regime-decision-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain|Northern Ireland: How do PUWER, LOLER and pressure-system law fit together?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Question
Is equipment used at work?
- Route
GB or NI PUWER baseline.
- Evidence
Task and equipment assessment.
Row 2
- Question
Does it lift or lower a load?
- Route
GB or NI LOLER applicability review.
- Evidence
Lift plan, marking and examination evidence.
Row 3
- Question
Does it meet pressure-system scope?
- Route
GB PSSR 2000 or NI PSSR 2004 applicability review.
- Evidence
System boundary, fluid, limits and written scheme decision.
Row 4
- Question
Is it being placed on a market?
- Route
Current sector product-supply law.
- Evidence
Conformity evidence, separate from workplace acceptance.
Read the complete comparison table
| Row | Question | Route | Evidence |
|---|---|---|---|
| 1 | Is equipment used at work? | GB or NI PUWER baseline. | Task and equipment assessment. |
| 2 | Does it lift or lower a load? | GB or NI LOLER applicability review. | Lift plan, marking and examination evidence. |
| 3 | Does it meet pressure-system scope? | GB PSSR 2000 or NI PSSR 2004 applicability review. | System boundary, fluid, limits and written scheme decision. |
| 4 | Is it being placed on a market? | Current sector product-supply law. | Conformity evidence, separate from workplace acceptance. |
Apply task-specific ERICPD and HSE control hierarchy
Table ID: work-equipment-lifting-equipment-and-pressure-systems-control-hierarchy-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html
Row 1
- Column 1
Eliminate
- Column 2
Elimination
- Column 3
Avoid an unnecessary suspended lift or pressure-dependent step by redesigning flow or assembling at a safe accessible position. Check whether gravity, stored energy or manual handling creates a new hazard in the alternative.
- Column 4
Process and engineering owners verify the revised task and residual energy. Hold the original operation until feasible avoidance and the alternative’s risks are assessed. Basis: HSE Planning and organising lifting operations; HSE Using pressure systems
Row 2
- Column 1
Reduce, including substitution
- Column 2
Substitution or safer design
- Column 3
Choose a lifting or process method with suitable capacity and controlled interfaces for the actual load, radius, pressure and substance. Do not assume a lower pressure, different lifting device or powered aid is suitable without assessing the full task.
- Column 4
Competent lift planner or pressure-system engineer verifies design limits, stability, compatibility and foreseeable use. Reject a substitute with unverified capacity or new trapping/pressure hazards. Basis: HSE Planning and organising lifting operations; HSE L122 Safety of pressure systems
Row 3
- Column 1
Isolate
- Column 2
Engineering where physical or technical separation is feasible
- Column 3
Provide designed physical safeguards: separation from suspended loads, suitable lifting installation and pressure-system protective devices. Intrusive work needs verified isolation and safe control of stored pressure under an approved method.
- Column 4
Engineering owner verifies installation and protective performance; authorised task owner confirms the safe state. Stop when lifting support, separation, pressure protection or isolation is uncertain. Basis: HSE L113 Safe use of lifting equipment; HSE L122 Safety of pressure systems; HSE Maintenance of work equipment
Row 4
- Column 1
Control
- Column 2
Administrative or organisational controls
- Column 3
Plan and supervise lifting to its complexity and define pressure-system operating limits and required written scheme/examination arrangements. Keep the distinct PUWER, LOLER and pressure decisions; a pre-use check is not a substitute for a required competent examination.
- Column 4
Lift planner, user/owner and competent examiner fulfil their separate roles. Hold a lift or qualifying system use when critical planning, limits or required examination are unresolved. Basis: HSE Planning and organising lifting operations; HSE Thorough examinations and inspections of lifting equipment; HSE Using pressure systems
Row 5
- Column 1
PPE
- Column 2
Personal protective equipment for residual exposure
- Column 3
Select PPE for remaining handling, splash or other task exposure, checking fit and compatibility. It does not protect a person from an uncontrolled suspended load or establish that a pressurised vessel is safe.
- Column 4
Competent task owner verifies protection and safe position. Stop if required residual protection fails and keep people outside uncontrolled load or release zones. Basis: HSE hierarchy of control; HSE L113 Safe use of lifting equipment; HSE L122 Safety of pressure systems
Row 6
- Column 1
Discipline
- Column 2
Sustain and improve all levels
- Column 3
Maintain equipment and protective devices, complete required examinations and close defects through competent decisions. Reassess after modifications, changed service, new loads or repeated failures.
- Column 4
Owner and competent specialists verify repair, examination and release evidence. Hold use for a serious defect or unclear authorised return-to-service decision. Basis: HSE Thorough examinations and inspections of lifting equipment; HSE L122 Safety of pressure systems; HSE Maintenance of work equipment
Read the complete comparison table
| Row | Column 1 | Column 2 | Column 3 | Column 4 |
|---|---|---|---|---|
| 1 | Eliminate | Elimination | Avoid an unnecessary suspended lift or pressure-dependent step by redesigning flow or assembling at a safe accessible position. Check whether gravity, stored energy or manual handling creates a new hazard in the alternative. | Process and engineering owners verify the revised task and residual energy. Hold the original operation until feasible avoidance and the alternative’s risks are assessed. Basis: HSE Planning and organising lifting operations; HSE Using pressure systems |
| 2 | Reduce, including substitution | Substitution or safer design | Choose a lifting or process method with suitable capacity and controlled interfaces for the actual load, radius, pressure and substance. Do not assume a lower pressure, different lifting device or powered aid is suitable without assessing the full task. | Competent lift planner or pressure-system engineer verifies design limits, stability, compatibility and foreseeable use. Reject a substitute with unverified capacity or new trapping/pressure hazards. Basis: HSE Planning and organising lifting operations; HSE L122 Safety of pressure systems |
| 3 | Isolate | Engineering where physical or technical separation is feasible | Provide designed physical safeguards: separation from suspended loads, suitable lifting installation and pressure-system protective devices. Intrusive work needs verified isolation and safe control of stored pressure under an approved method. | Engineering owner verifies installation and protective performance; authorised task owner confirms the safe state. Stop when lifting support, separation, pressure protection or isolation is uncertain. Basis: HSE L113 Safe use of lifting equipment; HSE L122 Safety of pressure systems; HSE Maintenance of work equipment |
| 4 | Control | Administrative or organisational controls | Plan and supervise lifting to its complexity and define pressure-system operating limits and required written scheme/examination arrangements. Keep the distinct PUWER, LOLER and pressure decisions; a pre-use check is not a substitute for a required competent examination. | Lift planner, user/owner and competent examiner fulfil their separate roles. Hold a lift or qualifying system use when critical planning, limits or required examination are unresolved. Basis: HSE Planning and organising lifting operations; HSE Thorough examinations and inspections of lifting equipment; HSE Using pressure systems |
| 5 | PPE | Personal protective equipment for residual exposure | Select PPE for remaining handling, splash or other task exposure, checking fit and compatibility. It does not protect a person from an uncontrolled suspended load or establish that a pressurised vessel is safe. | Competent task owner verifies protection and safe position. Stop if required residual protection fails and keep people outside uncontrolled load or release zones. Basis: HSE hierarchy of control; HSE L113 Safe use of lifting equipment; HSE L122 Safety of pressure systems |
| 6 | Discipline | Sustain and improve all levels | Maintain equipment and protective devices, complete required examinations and close defects through competent decisions. Reassess after modifications, changed service, new loads or repeated failures. | Owner and competent specialists verify repair, examination and release evidence. Hold use for a serious defect or unclear authorised return-to-service decision. Basis: HSE Thorough examinations and inspections of lifting equipment; HSE L122 Safety of pressure systems; HSE Maintenance of work equipment |
How is lifting equipment selected and rated?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-lifting-selection-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain|Northern Ireland: How is lifting equipment selected and rated?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Decision
Load and attachment
- Evidence
Known mass, shape, balance and compatible device.
- Stop
Unknown or mismatched load.
Row 2
- Decision
Strength and stability
- Evidence
Rated configuration, support and siting.
- Stop
Unverified ground or configuration.
Row 3
- Decision
Lift path
- Evidence
Clear route, exclusions and communication.
- Stop
People or obstruction in danger path.
Read the complete comparison table
| Row | Decision | Evidence | Stop |
|---|---|---|---|
| 1 | Load and attachment | Known mass, shape, balance and compatible device. | Unknown or mismatched load. |
| 2 | Strength and stability | Rated configuration, support and siting. | Unverified ground or configuration. |
| 3 | Lift path | Clear route, exclusions and communication. | People or obstruction in danger path. |
Who plans and supervises lifting operations?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-lifting-plan-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain|Northern Ireland: Who plans and supervises lifting operations?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Stage
Plan
- Decision
Match equipment, load, people, place and sequence.
- Hold
Unknown facts or unresolved interface.
Row 2
- Stage
Brief
- Decision
Check who directs, operates, attaches and stops.
- Hold
Conflicting roles or signals.
Row 3
- Stage
Execute
- Decision
Monitor load and conditions against plan.
- Hold
Unexpected movement or changed condition.
Read the complete comparison table
| Row | Stage | Decision | Hold |
|---|---|---|---|
| 1 | Plan | Match equipment, load, people, place and sequence. | Unknown facts or unresolved interface. |
| 2 | Brief | Check who directs, operates, attaches and stops. | Conflicting roles or signals. |
| 3 | Execute | Monitor load and conditions against plan. | Unexpected movement or changed condition. |
How is LOLER thorough examination different from inspection?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-lifting-examination-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain|Northern Ireland: How is LOLER thorough examination different from inspection?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Activity
User check
- Purpose
Spot obvious current defect before use.
- Who decides
Trained user and local method.
Row 2
- Activity
PUWER inspection
- Purpose
Detect installation or deterioration issues.
- Who decides
Risk assessment and competent inspector.
Row 3
- Activity
LOLER thorough examination
- Purpose
Statutory safety assessment and report.
- Who decides
Competent examiner and law or scheme.
Row 4
- Activity
Maintenance
- Purpose
Keep equipment safe and functional.
- Who decides
Equipment owner and competent maintainer.
Read the complete comparison table
| Row | Activity | Purpose | Who decides |
|---|---|---|---|
| 1 | User check | Spot obvious current defect before use. | Trained user and local method. |
| 2 | PUWER inspection | Detect installation or deterioration issues. | Risk assessment and competent inspector. |
| 3 | LOLER thorough examination | Statutory safety assessment and report. | Competent examiner and law or scheme. |
| 4 | Maintenance | Keep equipment safe and functional. | Equipment owner and competent maintainer. |
When does pressure-system law apply?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-pressure-scope-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain|Northern Ireland: When does pressure-system law apply?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Question
What is the relevant fluid?
- Evidence
Fluid and operating conditions.
- Do not infer
Every pressurised liquid is PSSR.
Row 2
- Question
What is the system boundary?
- Evidence
Vessels, pipework, pipeline and protection.
- Do not infer
One label covers every component.
Row 3
- Question
Is an exception relevant?
- Evidence
Current GB or NI Schedule and competent review.
- Do not infer
An exemption from one duty removes all safety duties.
Read the complete comparison table
| Row | Question | Evidence | Do not infer |
|---|---|---|---|
| 1 | What is the relevant fluid? | Fluid and operating conditions. | Every pressurised liquid is PSSR. |
| 2 | What is the system boundary? | Vessels, pipework, pipeline and protection. | One label covers every component. |
| 3 | Is an exception relevant? | Current GB or NI Schedule and competent review. | An exemption from one duty removes all safety duties. |
What is a written scheme of examination?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-pressure-written-scheme-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain|Northern Ireland: What is a written scheme of examination?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Element
Scope
- Decision
Which vessels, pipelines, pipework and protective devices?
- Evidence
Identified boundary and exclusions.
Row 2
- Element
Method and timing
- Decision
How and when each part is examined?
- Evidence
Competent-person certified scheme.
Row 3
- Element
Preparation
- Decision
How is examination made safe?
- Evidence
Isolation, access and special measures.
Row 4
- Element
Change
- Decision
Does modified use require revision?
- Evidence
Scheme review and certification.
Read the complete comparison table
| Row | Element | Decision | Evidence |
|---|---|---|---|
| 1 | Scope | Which vessels, pipelines, pipework and protective devices? | Identified boundary and exclusions. |
| 2 | Method and timing | How and when each part is examined? | Competent-person certified scheme. |
| 3 | Preparation | How is examination made safe? | Isolation, access and special measures. |
| 4 | Change | Does modified use require revision? | Scheme review and certification. |
How does pressure-system examination work?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-pressure-examination-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain|Northern Ireland: How does pressure-system examination work?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Step
Before
- Evidence
Current suitable written scheme and safe preparation.
- Hold
No scheme or unsafe access.
Row 2
- Step
Examine
- Evidence
Competent examination to scheme.
- Hold
Unexamined required part.
Row 3
- Step
Report and act
- Evidence
Findings, due dates and danger action.
- Hold
Unsafe finding not closed.
Read the complete comparison table
| Row | Step | Evidence | Hold |
|---|---|---|---|
| 1 | Before | Current suitable written scheme and safe preparation. | No scheme or unsafe access. |
| 2 | Examine | Competent examination to scheme. | Unexamined required part. |
| 3 | Report and act | Findings, due dates and danger action. | Unsafe finding not closed. |
Can one inspection or certificate cover every duty?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-examination-comparison-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain|Northern Ireland: Can one inspection or certificate cover every duty?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Record
Pre-use check
- What it proves
Current obvious condition.
- What it does not prove
Statutory examination.
Row 2
- Record
PUWER inspection
- What it proves
Relevant installation or deterioration findings.
- What it does not prove
LOLER or PSSR compliance by itself.
Row 3
- Record
LOLER report
- What it proves
Competent lifting examination.
- What it does not prove
Safe lift plan or maintenance.
Row 4
- Record
Pressure written scheme
- What it proves
Examination plan and scope.
- What it does not prove
Completed examination or repair.
Row 5
- Record
Pressure report
- What it proves
Findings to the scheme.
- What it does not prove
Product conformity or operation within limits.
Row 6
- Record
Product declaration
- What it proves
Applicable supply assessment.
- What it does not prove
Safe workplace use.
Read the complete comparison table
| Row | Record | What it proves | What it does not prove |
|---|---|---|---|
| 1 | Pre-use check | Current obvious condition. | Statutory examination. |
| 2 | PUWER inspection | Relevant installation or deterioration findings. | LOLER or PSSR compliance by itself. |
| 3 | LOLER report | Competent lifting examination. | Safe lift plan or maintenance. |
| 4 | Pressure written scheme | Examination plan and scope. | Completed examination or repair. |
| 5 | Pressure report | Findings to the scheme. | Product conformity or operation within limits. |
| 6 | Product declaration | Applicable supply assessment. | Safe workplace use. |
How do lifting and pressure controls change across settings? decision table
Table ID: work-equipment-lifting-equipment-and-pressure-systems-sector-transfer
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html
Row 1
- Column 1
Warehouse lift truck
- Column 2
Elevated load can fall while steering or brakes also fail.
- Column 3
Check lifting parts under LOLER and other safety parts under PUWER; segregate pedestrians.
Row 2
- Column 1
Care setting hoist
- Column 2
Person can fall or be injured by wrong sling or attachment.
- Column 3
Match person, sling and hoist, plan the transfer and verify current examination.
Row 3
- Column 1
Construction lift
- Column 2
Ground, reach and wind can exceed configuration.
- Column 3
Competent lift plan, rated setup and exclusion zone.
Row 4
- Column 1
Boiler or autoclave
- Column 2
Pressure, heat or failed protection can release energy.
- Column 3
Safe limits, written scheme and competent examination before operation.
Read the complete comparison table
| Row | Column 1 | Column 2 | Column 3 |
|---|---|---|---|
| 1 | Warehouse lift truck | Elevated load can fall while steering or brakes also fail. | Check lifting parts under LOLER and other safety parts under PUWER; segregate pedestrians. |
| 2 | Care setting hoist | Person can fall or be injured by wrong sling or attachment. | Match person, sling and hoist, plan the transfer and verify current examination. |
| 3 | Construction lift | Ground, reach and wind can exceed configuration. | Competent lift plan, rated setup and exclusion zone. |
| 4 | Boiler or autoclave | Pressure, heat or failed protection can release energy. | Safe limits, written scheme and competent examination before operation. |
Which Great Britain law applies to these decisions?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-legal-gb-combined-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain: Which Great Britain law applies to these decisions?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Gb route
PUWER 1998
- Decision
Safe work-equipment use.
- Source
SI 1998/2306 and L22. See Provision and Use of Work Equipment Regulations 1998.
Row 2
- Gb route
LOLER 1998
- Decision
Lifting plan, equipment and examination.
- Source
SI 1998/2307 and L113. See Lifting Operations and Lifting Equipment Regulations 1998.
Row 3
- Gb route
PSSR 2000
- Decision
Safe limits, written scheme and examination.
- Source
SI 2000/128 and L122. See Pressure Systems Safety Regulations 2000.
Row 4
- Gb route
Product supply
- Decision
Market placement and conformity.
- Source
Current sector guidance. See GOV.UK placing UKCA or CE marked products on the Great Britain market.
Read the complete comparison table
| Row | Gb route | Decision | Source |
|---|---|---|---|
| 1 | PUWER 1998 | Safe work-equipment use. | SI 1998/2306 and L22. See Provision and Use of Work Equipment Regulations 1998. |
| 2 | LOLER 1998 | Lifting plan, equipment and examination. | SI 1998/2307 and L113. See Lifting Operations and Lifting Equipment Regulations 1998. |
| 3 | PSSR 2000 | Safe limits, written scheme and examination. | SI 2000/128 and L122. See Pressure Systems Safety Regulations 2000. |
| 4 | Product supply | Market placement and conformity. | Current sector guidance. See GOV.UK placing UKCA or CE marked products on the Great Britain market. |
Which Northern Ireland law applies to these decisions?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-legal-ni-combined-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Northern Ireland: Which Northern Ireland law applies to these decisions?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Ni route
PUWER NI 1999
- Decision
Safe work-equipment use.
- Source
SR 1999/305. See Provision and Use of Work Equipment Regulations Northern Ireland 1999.
Row 2
- Ni route
LOLER NI 1999
- Decision
Lifting planning and examination.
- Source
SR 1999/304. See Lifting Operations and Lifting Equipment Regulations Northern Ireland 1999.
Row 3
- Ni route
PSSR NI 2004
- Decision
Safe limits and written scheme.
- Source
SR 2004/222. See Pressure Systems Safety Regulations Northern Ireland 2004.
Row 4
- Ni route
L122 in NI
- Decision
ACOP approval context.
- Source
HSENI approval page. See HSENI L122 approved for use in Northern Ireland.
Read the complete comparison table
| Row | Ni route | Decision | Source |
|---|---|---|---|
| 1 | PUWER NI 1999 | Safe work-equipment use. | SR 1999/305. See Provision and Use of Work Equipment Regulations Northern Ireland 1999. |
| 2 | LOLER NI 1999 | Lifting planning and examination. | SR 1999/304. See Lifting Operations and Lifting Equipment Regulations Northern Ireland 1999. |
| 3 | PSSR NI 2004 | Safe limits and written scheme. | SR 2004/222. See Pressure Systems Safety Regulations Northern Ireland 2004. |
| 4 | L122 in NI | ACOP approval context. | HSENI approval page. See HSENI L122 approved for use in Northern Ireland. |
What is the guarding hierarchy?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-guarding-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain|Northern Ireland: What is the guarding hierarchy?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Priority
1
- Control
Fixed guard.
- Boundary
Use where practicable and compatible with necessary access.
Row 2
- Priority
2
- Control
Other guard or protection device.
- Boundary
Must fail or act to a safe condition as designed.
Row 3
- Priority
3
- Control
Jig, holder, push-stick or similar aid.
- Boundary
Keeps the person from danger where higher controls cannot fully apply.
Row 4
- Priority
4
- Control
Information, training, supervision and PPE.
- Boundary
Residual layer, not a substitute for practicable safeguarding.
Read the complete comparison table
| Row | Priority | Control | Boundary |
|---|---|---|---|
| 1 | 1 | Fixed guard. | Use where practicable and compatible with necessary access. |
| 2 | 2 | Other guard or protection device. | Must fail or act to a safe condition as designed. |
| 3 | 3 | Jig, holder, push-stick or similar aid. | Keeps the person from danger where higher controls cannot fully apply. |
| 4 | 4 | Information, training, supervision and PPE. | Residual layer, not a substitute for practicable safeguarding. |
How should equipment be isolated?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-isolation-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain|Northern Ireland: How should equipment be isolated?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Energy or stage
Identify
- Control question
What can move, energise, pressurise, heat or release?
- Evidence
Energy map and instructions.
Row 2
- Energy or stage
Separate and secure
- Control question
Can reconnection or release be prevented?
- Evidence
Isolation and lock-off record.
Row 3
- Energy or stage
Dissipate or restrain
- Control question
What stored energy remains?
- Evidence
Verified zero or safely restrained state.
Row 4
- Energy or stage
Restore
- Control question
Are people clear and safeguards restored?
- Evidence
Controlled handback and release.
Read the complete comparison table
| Row | Energy or stage | Control question | Evidence |
|---|---|---|---|
| 1 | Identify | What can move, energise, pressurise, heat or release? | Energy map and instructions. |
| 2 | Separate and secure | Can reconnection or release be prevented? | Isolation and lock-off record. |
| 3 | Dissipate or restrain | What stored energy remains? | Verified zero or safely restrained state. |
| 4 | Restore | Are people clear and safeguards restored? | Controlled handback and release. |
What must each role learn and demonstrate? decision table
Table ID: work-equipment-lifting-equipment-and-pressure-systems-role-competence
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html
Row 1
- Column 1
Worker or operator
- Column 2
Explain the task risk, pre-use check and when to stop.
- Column 3
New task, equipment or unsafe event.
Row 2
- Column 1
Supervisor or manager
- Column 2
Select and verify controls, allocate resources and act on reports.
- Column 3
Work pattern, staffing, process or equipment change.
Row 3
- Column 1
Maintainer or specialist
- Column 2
Show the technical basis, safe state, examination or referral within own competence.
- Column 3
Modified system, failed test or new evidence.
Row 4
- Column 1
Safety adviser or auditor
- Column 2
Trace law, hazard, control and field evidence without substituting a checklist for judgement.
- Column 3
Regulatory or technical change.
Read the complete comparison table
| Row | Column 1 | Column 2 | Column 3 |
|---|---|---|---|
| 1 | Worker or operator | Explain the task risk, pre-use check and when to stop. | New task, equipment or unsafe event. |
| 2 | Supervisor or manager | Select and verify controls, allocate resources and act on reports. | Work pattern, staffing, process or equipment change. |
| 3 | Maintainer or specialist | Show the technical basis, safe state, examination or referral within own competence. | Modified system, failed test or new evidence. |
| 4 | Safety adviser or auditor | Trace law, hazard, control and field evidence without substituting a checklist for judgement. | Regulatory or technical change. |
What do complete work-equipment decisions look like?
Table ID: work-equipment-lifting-equipment-and-pressure-systems-operational-examples-table
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html Scope: Great Britain|Northern Ireland: What do complete work-equipment decisions look like?. Decide actual equipment, operating or intervention mode, load/configuration or relevant fluid/system boundary, evidence, energy and named stop or release authority; do not infer values or permission.
Row 1
- Scenario type
Routine use
- Primary decision
Start only after suitability, safeguards and checks pass.
- End state
Controlled completion.
Row 2
- Scenario type
Hire or contractor
- Primary decision
Accept only after duties and evidence align.
- End state
Accepted, rejected or held.
Row 3
- Scenario type
Defect or emergency
- Primary decision
Stop and prevent restart.
- End state
Quarantine or authorised return.
Row 4
- Scenario type
Maintenance or change
- Primary decision
Control energy and evidence.
- End state
Verified handback.
Read the complete comparison table
| Row | Scenario type | Primary decision | End state |
|---|---|---|---|
| 1 | Routine use | Start only after suitability, safeguards and checks pass. | Controlled completion. |
| 2 | Hire or contractor | Accept only after duties and evidence align. | Accepted, rejected or held. |
| 3 | Defect or emergency | Stop and prevent restart. | Quarantine or authorised return. |
| 4 | Maintenance or change | Control energy and evidence. | Verified handback. |
Source tables and records 2
Official source and decision register
Table ID: work-equipment-lifting-equipment-and-pressure-systems-official-links
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html
Row 1
- Column 1
HSE
- Column 2
HSE PUWER overview
- Column 3
Great Britain guidance
- Column 4
Primary overview of suitability, maintenance, inspection, competence, guarding, controls and other PUWER duties in Great Britain.; Updated 21 November 2024; checked 23 September 2026
Row 2
- Column 1
HSENI
- Column 2
HSENI PUWER 1999
- Column 3
Northern Ireland guidance
- Column 4
Northern Ireland PUWER route and regulator guidance.; Publisher publication/update date not stated; current page checked 23 September 2026
Row 3
- Column 1
HSE
- Column 2
HSE L22 Safe use of work equipment
- Column 3
Great Britain ACOP and guidance
- Column 4
Detailed PUWER ACOP and guidance. Product-law wording must be read with current GOV.UK market guidance.; Fourth edition 2014, amended 2018; retained copy inspected
Row 4
- Column 1
HSE
- Column 2
HSE INDG229 Using work equipment safely
- Column 3
Great Britain worker guidance
- Column 4
Worker-level use, defects and controls. Dated examples are not universal limits or frequencies.; Revision 2, November 2012; retained copy inspected
Row 5
- Column 1
HSE
- Column 2
HSE PUWER guidance and topic index
- Column 3
Great Britain guidance
- Column 4
Practical Great Britain route for selecting, installing, using and controlling work equipment.; Updated 16 March 2023; checked 23 September 2026
Row 6
- Column 1
legislation.gov.uk
- Column 2
Provision and Use of Work Equipment Regulations 1998
- Column 3
Great Britain
- Column 4
Great Britain work-equipment duties; check current effects and application.; SI 1998/2306, as amended
Row 7
- Column 1
legislation.gov.uk
- Column 2
Provision and Use of Work Equipment Regulations Northern Ireland 1999
- Column 3
Northern Ireland
- Column 4
Separate Northern Ireland work-equipment duties; check current effects and application.; SR 1999/305, as amended
Row 8
- Column 1
HSE
- Column 2
HSE Introduction to work equipment and machinery
- Column 3
Great Britain guidance
- Column 4
Boundary between safe workplace use, machinery safety and product supply.; Updated 19 November 2024; checked 23 September 2026
Row 9
- Column 1
GOV.UK
- Column 2
GOV.UK placing UKCA or CE marked products on the Great Britain market
- Column 3
Great Britain product supply
- Column 4
Current GB market route. A conformity mark does not prove suitability or safe workplace use.; Published 31 March 2026; updated 21 August 2026
Row 10
- Column 1
GOV.UK
- Column 2
GOV.UK placing CE or CE and UKNI marked products on the Northern Ireland market
- Column 3
Northern Ireland product supply
- Column 4
Current NI market route under applicable Windsor Framework product rules; separate from workplace-use duties.; Published 31 March 2026; updated 8 April 2026
Row 11
- Column 1
GOV.UK
- Column 2
GOV.UK product regulations by sector and current marking approaches
- Column 3
United Kingdom product supply
- Column 4
Sector table for identifying the applicable current product regime; it does not authorise workplace use.; Published 31 March 2026
Row 12
- Column 1
legislation.gov.uk
- Column 2
Lifting Operations and Lifting Equipment Regulations 1998
- Column 3
Great Britain
- Column 4
Great Britain lifting equipment, operations, examination, reporting and record duties.; SI 1998/2307, as amended
Row 13
- Column 1
legislation.gov.uk
- Column 2
Lifting Operations and Lifting Equipment Regulations Northern Ireland 1999
- Column 3
Northern Ireland
- Column 4
Northern Ireland lifting-equipment regime; do not present GB LOLER as UK-wide.; SR 1999/304, as amended
Row 14
- Column 1
legislation.gov.uk
- Column 2
Pressure Systems Safety Regulations 2000
- Column 3
Great Britain
- Column 4
Great Britain pressure-system duties, including safe operating limits and written schemes where applicable.; SI 2000/128, as amended
Row 15
- Column 1
legislation.gov.uk
- Column 2
Pressure Systems Safety Regulations Northern Ireland 2004
- Column 3
Northern Ireland
- Column 4
Northern Ireland pressure-system duties; check applicable scope and current effects.; SR 2004/222, as amended
Row 16
- Column 1
HSE
- Column 2
HSE Pressure Equipment Safety Regulations guidance
- Column 3
Great Britain pressure product supply guidance
- Column 4
Product-supply boundary for pressure equipment; not approval for workplace use.; Updated 9 December 2024; checked 23 September 2026
Row 17
- Column 1
HSE
- Column 2
HSE LOLER overview
- Column 3
Great Britain guidance
- Column 4
Separate lifting-equipment regime where applicable; PUWER alone is not the complete legal route.; Updated 22 January 2026; checked 23 September 2026
Row 18
- Column 1
HSE
- Column 2
HSE L113 Safe use of lifting equipment
- Column 3
Great Britain ACOP and guidance
- Column 4
Detailed LOLER ACOP and guidance; apply to actual equipment, task and jurisdiction.; Second edition 2014, amended 2018; retained copy inspected
Row 19
- Column 1
HSENI
- Column 2
HSENI Work equipment and machinery guidance
- Column 3
Northern Ireland guidance
- Column 4
NI PUWER and LOLER routes, including lifting-specific examination.; Publisher publication/update date not stated; current page checked 23 September 2026
Row 20
- Column 1
HSE
- Column 2
HSE Planning and organising lifting operations
- Column 3
Great Britain guidance
- Column 4
Risk-proportionate competent planning, supervision, strength, siting and load control.; Updated 29 October 2024; checked 23 September 2026
Row 21
- Column 1
HSE
- Column 2
HSE Magnetic lifting devices
- Column 3
Great Britain specialist lifting guidance
- Column 4
Load and attachment compatibility illustration; do not generalise device-specific technical values.; Updated 29 October 2024; checked 23 September 2026
Row 22
- Column 1
HSE
- Column 2
HSE Vacuum lifting equipment
- Column 3
Great Britain specialist lifting guidance
- Column 4
Vacuum-lifting compatibility and failure-mode route; equipment-specific controls remain local.; Updated 21 November 2024; checked 23 September 2026
Row 23
- Column 1
HSE
- Column 2
HSE Thorough examinations and inspections of lifting equipment
- Column 3
Great Britain guidance
- Column 4
Distinguishes pre-use checks, risk-based inspections, statutory thorough examination and maintenance; specific intervals require the applicable law or competent scheme.; Updated 29 October 2024; checked 23 September 2026
Row 24
- Column 1
HSE
- Column 2
HSE GEIS6 MEWP selection management and use
- Column 3
Great Britain MEWP guidance
- Column 4
MEWP specialist selection and work-at-height route alongside lifting duties.; 2014; retained copy inspected
Row 25
- Column 1
HSE
- Column 2
HSE Work at height
- Column 3
Great Britain guidance
- Column 4
Separate work-at-height duties where equipment is used for access or positioning.; Current portal checked 23 September 2026
Row 26
- Column 1
HSE
- Column 2
HSE Inspection of work equipment
- Column 3
Great Britain guidance
- Column 4
Risk-based inspection, records and evidence; does not set a universal inspection interval.; Updated 29 October 2024; checked 23 September 2026
Row 27
- Column 1
HSE
- Column 2
HSE Maintenance of work equipment
- Column 3
Great Britain guidance
- Column 4
Planning, competence, safe maintenance, isolation and protection of maintainers and others.; Updated 19 November 2024; checked 23 September 2026
Row 28
- Column 1
HSE
- Column 2
HSE Work equipment and machinery FAQs
- Column 3
Great Britain guidance
- Column 4
Official answers on responsibilities, hire, inspection, training and equipment supplied for use.; Updated 7 May 2026; checked 23 September 2026
Row 29
- Column 1
HSE
- Column 2
HSE Pressure Systems Safety Regulations overview
- Column 3
Great Britain guidance
- Column 4
Pressure-system applicability, written schemes, competent persons and user or owner duties.; Updated 9 December 2025; checked 23 September 2026
Row 30
- Column 1
HSE
- Column 2
HSE Using pressure systems
- Column 3
Great Britain guidance
- Column 4
Safe equipment, limits, protective devices, maintenance, training, written scheme and competent examination.; Updated 10 October 2024; checked 23 September 2026
Row 31
- Column 1
HSE
- Column 2
HSE L122 Safety of pressure systems
- Column 3
Great Britain ACOP and guidance
- Column 4
Detailed PSSR scope, written-scheme content, competent-person role, examinations, defects and records.; 2014; retained copy inspected
Row 32
- Column 1
HSENI
- Column 2
HSENI L122 approved for use in Northern Ireland
- Column 3
Northern Ireland ACOP approval
- Column 4
Confirms L122 ACOP approval in NI alongside NI PSSR 2004; apply NI legislation.; Published 20 May 2004; checked 23 September 2026
Row 33
- Column 1
HSE
- Column 2
HSE HSG221 Offshore lifting equipment
- Column 3
Great Britain offshore lifting guidance
- Column 4
Offshore-specific lifting route, not a generic workplace rule.; Second edition 2007; retained copy inspected
Row 34
- Column 1
HSE
- Column 2
HSE PM73 Safety requirements for autoclaves
- Column 3
Great Britain industrial autoclave guidance
- Column 4
Autoclave-specific safeguarding, maintenance and pressure-system context.; Revision 3, 2012; retained copy inspected
Row 35
- Column 1
HSE
- Column 2
HSE INDG291 Providing and using work equipment safely
- Column 3
Great Britain guidance
- Column 4
Broad practical PUWER guide; current HSE and GOV.UK pages control later legal or product-supply changes.; Revision 1, March 2013; retained copy inspected
Row 36
- Column 1
legislation.gov.uk
- Column 2
Management of Health and Safety at Work Regulations 1999
- Column 3
Great Britain
- Column 4
Great Britain risk assessment, preventive arrangements, coordination, emergency and competent-assistance route.; SI 1999/3242, as amended
Row 37
- Column 1
legislation.gov.uk
- Column 2
Management of Health and Safety at Work Regulations Northern Ireland 2000
- Column 3
Northern Ireland
- Column 4
Separate Northern Ireland risk assessment, coordination, emergency and competent-assistance route.; SR 2000/388, as amended
Row 38
- Column 1
HSENI
- Column 2
HSENI machinery safety devices safety alert
- Column 3
Northern Ireland safety alert
- Column 4
Current warning on bypassed safety devices; apply to the equipment and conditions within scope.; Published 4 March 2026; checked 23 September 2026
Row 39
- Column 1
HSE
- Column 2
HSE Electrical safety at work
- Column 3
Great Britain guidance
- Column 4
Separate electrical risk, isolation and competence route where applicable.; Current portal checked 23 September 2026
Row 40
- Column 1
HSENI
- Column 2
HSENI Refurbished and modified machinery
- Column 3
Northern Ireland guidance
- Column 4
Refurbishment and modification boundaries, including possible manufacturer and product-supply consequences.; Publisher publication/update date not stated; current page checked 23 September 2026
Row 41
- Column 1
HSE
- Column 2
HSE Training and competence for work equipment
- Column 3
Great Britain guidance
- Column 4
Task- and person-specific competence; no generic certificate or expiry period.; Updated 6 June 2025; checked 23 September 2026
Row 42
- Column 1
HSENI
- Column 2
HSENI Supplier, importer or hirer of equipment
- Column 3
Northern Ireland product and hire guidance
- Column 4
Duties that can arise from supply, import or hire; separate from workplace-use control.; Publisher publication/update date not stated; current page checked 23 September 2026
Row 43
- Column 1
HSE
- Column 2
HSE Pressure systems
- Column 3
Great Britain guidance
- Column 4
Separate pressure-systems route where applicable.; Current portal checked 23 September 2026
Row 44
- Column 1
HSE
- Column 2
HSE Dangerous substances and explosive atmospheres
- Column 3
Great Britain guidance
- Column 4
Separate dangerous-substance and explosive-atmosphere route where equipment can ignite or handle dangerous substances.; Updated 14 October 2024; checked 23 September 2026
Row 45
- Column 1
HSE
- Column 2
HSE Mobile work equipment
- Column 3
Great Britain guidance
- Column 4
Additional mobile-equipment considerations; equipment-specific limits and permissions remain local.; Updated 29 October 2024; checked 23 September 2026
Row 46
- Column 1
HSE
- Column 2
HSE INDG242 Control back-pain risks from whole-body vibration
- Column 3
Great Britain sector guidance
- Column 4
Mobile-machinery and whole-body-vibration context, not a generic PUWER design authority.; Revision 1, June 2005; retained copy inspected
Row 47
- Column 1
HSENI
- Column 2
HSENI Working safely with farm equipment and vehicles
- Column 3
Northern Ireland sector guidance
- Column 4
Sector examples for guards, maintenance and safe use; transfer only where conditions match.; Publisher publication/update date not stated; current page checked 23 September 2026
Row 48
- Column 1
legislation.gov.uk
- Column 2
Health and Safety at Work etc Act 1974
- Column 3
Great Britain
- Column 4
Great Britain foundation for safe plant, systems, information, training, supervision and protection of others.; 1974 c.37, as amended
Row 49
- Column 1
legislation.gov.uk
- Column 2
Health and Safety at Work Northern Ireland Order 1978
- Column 3
Northern Ireland
- Column 4
Northern Ireland foundation for safe plant, systems, information, training, supervision and protection of others.; SI 1978/1039, as amended
Row 50
- Column 1
HSE
- Column 2
HSE INDG474 Lifting equipment at work
- Column 3
Great Britain lifting guidance
- Column 4
Current brief LOLER guide; supersedes the withdrawn retained INDG290 and INDG422 leaflets.; Published April 2017; checked 23 September 2026
Row 51
- Column 1
HSE
- Column 2
HSE Managing risk using PPE
- Column 3
Great Britain
- Column 4
Five-level control hierarchy and PPE boundary; Current page; date not displayed
Row 52
- Column 1
HSE
- Column 2
HSE Managing for health and safety (HSG65)
- Column 3
Great Britain
- Column 4
Current source at verification date; Live source; check the linked page for updates
Read the complete comparison table
| Row | Column 1 | Column 2 | Column 3 | Column 4 |
|---|---|---|---|---|
| 1 | HSE | HSE PUWER overview | Great Britain guidance | Primary overview of suitability, maintenance, inspection, competence, guarding, controls and other PUWER duties in Great Britain.; Updated 21 November 2024; checked 23 September 2026 |
| 2 | HSENI | HSENI PUWER 1999 | Northern Ireland guidance | Northern Ireland PUWER route and regulator guidance.; Publisher publication/update date not stated; current page checked 23 September 2026 |
| 3 | HSE | HSE L22 Safe use of work equipment | Great Britain ACOP and guidance | Detailed PUWER ACOP and guidance. Product-law wording must be read with current GOV.UK market guidance.; Fourth edition 2014, amended 2018; retained copy inspected |
| 4 | HSE | HSE INDG229 Using work equipment safely | Great Britain worker guidance | Worker-level use, defects and controls. Dated examples are not universal limits or frequencies.; Revision 2, November 2012; retained copy inspected |
| 5 | HSE | HSE PUWER guidance and topic index | Great Britain guidance | Practical Great Britain route for selecting, installing, using and controlling work equipment.; Updated 16 March 2023; checked 23 September 2026 |
| 6 | legislation.gov.uk | Provision and Use of Work Equipment Regulations 1998 | Great Britain | Great Britain work-equipment duties; check current effects and application.; SI 1998/2306, as amended |
| 7 | legislation.gov.uk | Provision and Use of Work Equipment Regulations Northern Ireland 1999 | Northern Ireland | Separate Northern Ireland work-equipment duties; check current effects and application.; SR 1999/305, as amended |
| 8 | HSE | HSE Introduction to work equipment and machinery | Great Britain guidance | Boundary between safe workplace use, machinery safety and product supply.; Updated 19 November 2024; checked 23 September 2026 |
| 9 | GOV.UK | GOV.UK placing UKCA or CE marked products on the Great Britain market | Great Britain product supply | Current GB market route. A conformity mark does not prove suitability or safe workplace use.; Published 31 March 2026; updated 21 August 2026 |
| 10 | GOV.UK | GOV.UK placing CE or CE and UKNI marked products on the Northern Ireland market | Northern Ireland product supply | Current NI market route under applicable Windsor Framework product rules; separate from workplace-use duties.; Published 31 March 2026; updated 8 April 2026 |
| 11 | GOV.UK | GOV.UK product regulations by sector and current marking approaches | United Kingdom product supply | Sector table for identifying the applicable current product regime; it does not authorise workplace use.; Published 31 March 2026 |
| 12 | legislation.gov.uk | Lifting Operations and Lifting Equipment Regulations 1998 | Great Britain | Great Britain lifting equipment, operations, examination, reporting and record duties.; SI 1998/2307, as amended |
| 13 | legislation.gov.uk | Lifting Operations and Lifting Equipment Regulations Northern Ireland 1999 | Northern Ireland | Northern Ireland lifting-equipment regime; do not present GB LOLER as UK-wide.; SR 1999/304, as amended |
| 14 | legislation.gov.uk | Pressure Systems Safety Regulations 2000 | Great Britain | Great Britain pressure-system duties, including safe operating limits and written schemes where applicable.; SI 2000/128, as amended |
| 15 | legislation.gov.uk | Pressure Systems Safety Regulations Northern Ireland 2004 | Northern Ireland | Northern Ireland pressure-system duties; check applicable scope and current effects.; SR 2004/222, as amended |
| 16 | HSE | HSE Pressure Equipment Safety Regulations guidance | Great Britain pressure product supply guidance | Product-supply boundary for pressure equipment; not approval for workplace use.; Updated 9 December 2024; checked 23 September 2026 |
| 17 | HSE | HSE LOLER overview | Great Britain guidance | Separate lifting-equipment regime where applicable; PUWER alone is not the complete legal route.; Updated 22 January 2026; checked 23 September 2026 |
| 18 | HSE | HSE L113 Safe use of lifting equipment | Great Britain ACOP and guidance | Detailed LOLER ACOP and guidance; apply to actual equipment, task and jurisdiction.; Second edition 2014, amended 2018; retained copy inspected |
| 19 | HSENI | HSENI Work equipment and machinery guidance | Northern Ireland guidance | NI PUWER and LOLER routes, including lifting-specific examination.; Publisher publication/update date not stated; current page checked 23 September 2026 |
| 20 | HSE | HSE Planning and organising lifting operations | Great Britain guidance | Risk-proportionate competent planning, supervision, strength, siting and load control.; Updated 29 October 2024; checked 23 September 2026 |
| 21 | HSE | HSE Magnetic lifting devices | Great Britain specialist lifting guidance | Load and attachment compatibility illustration; do not generalise device-specific technical values.; Updated 29 October 2024; checked 23 September 2026 |
| 22 | HSE | HSE Vacuum lifting equipment | Great Britain specialist lifting guidance | Vacuum-lifting compatibility and failure-mode route; equipment-specific controls remain local.; Updated 21 November 2024; checked 23 September 2026 |
| 23 | HSE | HSE Thorough examinations and inspections of lifting equipment | Great Britain guidance | Distinguishes pre-use checks, risk-based inspections, statutory thorough examination and maintenance; specific intervals require the applicable law or competent scheme.; Updated 29 October 2024; checked 23 September 2026 |
| 24 | HSE | HSE GEIS6 MEWP selection management and use | Great Britain MEWP guidance | MEWP specialist selection and work-at-height route alongside lifting duties.; 2014; retained copy inspected |
| 25 | HSE | HSE Work at height | Great Britain guidance | Separate work-at-height duties where equipment is used for access or positioning.; Current portal checked 23 September 2026 |
| 26 | HSE | HSE Inspection of work equipment | Great Britain guidance | Risk-based inspection, records and evidence; does not set a universal inspection interval.; Updated 29 October 2024; checked 23 September 2026 |
| 27 | HSE | HSE Maintenance of work equipment | Great Britain guidance | Planning, competence, safe maintenance, isolation and protection of maintainers and others.; Updated 19 November 2024; checked 23 September 2026 |
| 28 | HSE | HSE Work equipment and machinery FAQs | Great Britain guidance | Official answers on responsibilities, hire, inspection, training and equipment supplied for use.; Updated 7 May 2026; checked 23 September 2026 |
| 29 | HSE | HSE Pressure Systems Safety Regulations overview | Great Britain guidance | Pressure-system applicability, written schemes, competent persons and user or owner duties.; Updated 9 December 2025; checked 23 September 2026 |
| 30 | HSE | HSE Using pressure systems | Great Britain guidance | Safe equipment, limits, protective devices, maintenance, training, written scheme and competent examination.; Updated 10 October 2024; checked 23 September 2026 |
| 31 | HSE | HSE L122 Safety of pressure systems | Great Britain ACOP and guidance | Detailed PSSR scope, written-scheme content, competent-person role, examinations, defects and records.; 2014; retained copy inspected |
| 32 | HSENI | HSENI L122 approved for use in Northern Ireland | Northern Ireland ACOP approval | Confirms L122 ACOP approval in NI alongside NI PSSR 2004; apply NI legislation.; Published 20 May 2004; checked 23 September 2026 |
| 33 | HSE | HSE HSG221 Offshore lifting equipment | Great Britain offshore lifting guidance | Offshore-specific lifting route, not a generic workplace rule.; Second edition 2007; retained copy inspected |
| 34 | HSE | HSE PM73 Safety requirements for autoclaves | Great Britain industrial autoclave guidance | Autoclave-specific safeguarding, maintenance and pressure-system context.; Revision 3, 2012; retained copy inspected |
| 35 | HSE | HSE INDG291 Providing and using work equipment safely | Great Britain guidance | Broad practical PUWER guide; current HSE and GOV.UK pages control later legal or product-supply changes.; Revision 1, March 2013; retained copy inspected |
| 36 | legislation.gov.uk | Management of Health and Safety at Work Regulations 1999 | Great Britain | Great Britain risk assessment, preventive arrangements, coordination, emergency and competent-assistance route.; SI 1999/3242, as amended |
| 37 | legislation.gov.uk | Management of Health and Safety at Work Regulations Northern Ireland 2000 | Northern Ireland | Separate Northern Ireland risk assessment, coordination, emergency and competent-assistance route.; SR 2000/388, as amended |
| 38 | HSENI | HSENI machinery safety devices safety alert | Northern Ireland safety alert | Current warning on bypassed safety devices; apply to the equipment and conditions within scope.; Published 4 March 2026; checked 23 September 2026 |
| 39 | HSE | HSE Electrical safety at work | Great Britain guidance | Separate electrical risk, isolation and competence route where applicable.; Current portal checked 23 September 2026 |
| 40 | HSENI | HSENI Refurbished and modified machinery | Northern Ireland guidance | Refurbishment and modification boundaries, including possible manufacturer and product-supply consequences.; Publisher publication/update date not stated; current page checked 23 September 2026 |
| 41 | HSE | HSE Training and competence for work equipment | Great Britain guidance | Task- and person-specific competence; no generic certificate or expiry period.; Updated 6 June 2025; checked 23 September 2026 |
| 42 | HSENI | HSENI Supplier, importer or hirer of equipment | Northern Ireland product and hire guidance | Duties that can arise from supply, import or hire; separate from workplace-use control.; Publisher publication/update date not stated; current page checked 23 September 2026 |
| 43 | HSE | HSE Pressure systems | Great Britain guidance | Separate pressure-systems route where applicable.; Current portal checked 23 September 2026 |
| 44 | HSE | HSE Dangerous substances and explosive atmospheres | Great Britain guidance | Separate dangerous-substance and explosive-atmosphere route where equipment can ignite or handle dangerous substances.; Updated 14 October 2024; checked 23 September 2026 |
| 45 | HSE | HSE Mobile work equipment | Great Britain guidance | Additional mobile-equipment considerations; equipment-specific limits and permissions remain local.; Updated 29 October 2024; checked 23 September 2026 |
| 46 | HSE | HSE INDG242 Control back-pain risks from whole-body vibration | Great Britain sector guidance | Mobile-machinery and whole-body-vibration context, not a generic PUWER design authority.; Revision 1, June 2005; retained copy inspected |
| 47 | HSENI | HSENI Working safely with farm equipment and vehicles | Northern Ireland sector guidance | Sector examples for guards, maintenance and safe use; transfer only where conditions match.; Publisher publication/update date not stated; current page checked 23 September 2026 |
| 48 | legislation.gov.uk | Health and Safety at Work etc Act 1974 | Great Britain | Great Britain foundation for safe plant, systems, information, training, supervision and protection of others.; 1974 c.37, as amended |
| 49 | legislation.gov.uk | Health and Safety at Work Northern Ireland Order 1978 | Northern Ireland | Northern Ireland foundation for safe plant, systems, information, training, supervision and protection of others.; SI 1978/1039, as amended |
| 50 | HSE | HSE INDG474 Lifting equipment at work | Great Britain lifting guidance | Current brief LOLER guide; supersedes the withdrawn retained INDG290 and INDG422 leaflets.; Published April 2017; checked 23 September 2026 |
| 51 | HSE | HSE Managing risk using PPE | Great Britain | Five-level control hierarchy and PPE boundary; Current page; date not displayed |
| 52 | HSE | HSE Managing for health and safety (HSG65) | Great Britain | Current source at verification date; Live source; check the linked page for updates |
Acronyms and terms
Table ID: work-equipment-lifting-equipment-and-pressure-systems-terms
Source: https://www.sharehub.ltd/knowledge-hub/work-equipment-lifting-equipment-and-pressure-systems.html
Row 1
- Column 1
Work equipment
- Column 2
Machinery, appliance, apparatus, tool or installation used at work.
- Column 3
Scope depends on real use.
Row 2
- Column 1
Guard
- Column 2
Physical barrier preventing or restricting access to danger.
- Column 3
Design is equipment specific.
Row 3
- Column 1
Protection device
- Column 2
Control or sensing function that reduces risk.
- Column 3
Must not be bypassed.
Row 4
- Column 1
Emergency stop
- Column 2
Additional rapid stop function where appropriate.
- Column 3
Not full isolation.
Row 5
- Column 1
Isolation
- Column 2
Separation and control of all relevant energy.
- Column 3
Includes stored energy.
Row 6
- Column 1
Inspection
- Column 2
Competent check to detect safety-relevant deterioration or installation issues.
- Column 3
Not the same as maintenance.
Row 7
- Column 1
Quarantine
- Column 2
State preventing further use pending decision.
- Column 3
Release needs evidence and authority.
Row 8
- Column 1
Return to service
- Column 2
Recorded operational acceptance after restoration.
- Column 3
Repair alone is insufficient.
Row 9
- Column 1
PUWER
- Column 2
Provision and Use of Work Equipment Regulations; separate GB and NI instruments.
- Column 3
General workplace equipment duty route.
Row 10
- Column 1
LOLER
- Column 2
Lifting Operations and Lifting Equipment Regulations; separate GB and NI instruments.
- Column 3
Planning, safe use, marking and thorough examination of lifting equipment.
Row 11
- Column 1
PSSR
- Column 2
Pressure Systems Safety Regulations; separate GB and NI instruments.
- Column 3
Safe limits and written-scheme examination where applicable.
Row 12
- Column 1
WSE
- Column 2
Written scheme of examination for qualifying pressure systems.
- Column 3
A competent person defines the parts, nature and frequency of examination.
Row 13
- Column 1
SWL
- Column 2
Safe working load.
- Column 3
Check the actual equipment configuration and marked limit.
Row 14
- Column 1
ACOP
- Column 2
Approved Code of Practice.
- Column 3
Check approved edition and jurisdiction.
Row 15
- Column 1
ERICPD
- Column 2
Eliminate, Reduce including substitution, Isolate, Control, personal protective equipment, Discipline.
- Column 3
A SHARE decision prompt; sustain effective controls and learning.
Row 16
- Column 1
PPE
- Column 2
Personal protective equipment.
- Column 3
Use for assessed residual exposure; it does not replace stronger feasible controls.
Read the complete comparison table
| Row | Column 1 | Column 2 | Column 3 |
|---|---|---|---|
| 1 | Work equipment | Machinery, appliance, apparatus, tool or installation used at work. | Scope depends on real use. |
| 2 | Guard | Physical barrier preventing or restricting access to danger. | Design is equipment specific. |
| 3 | Protection device | Control or sensing function that reduces risk. | Must not be bypassed. |
| 4 | Emergency stop | Additional rapid stop function where appropriate. | Not full isolation. |
| 5 | Isolation | Separation and control of all relevant energy. | Includes stored energy. |
| 6 | Inspection | Competent check to detect safety-relevant deterioration or installation issues. | Not the same as maintenance. |
| 7 | Quarantine | State preventing further use pending decision. | Release needs evidence and authority. |
| 8 | Return to service | Recorded operational acceptance after restoration. | Repair alone is insufficient. |
| 9 | PUWER | Provision and Use of Work Equipment Regulations; separate GB and NI instruments. | General workplace equipment duty route. |
| 10 | LOLER | Lifting Operations and Lifting Equipment Regulations; separate GB and NI instruments. | Planning, safe use, marking and thorough examination of lifting equipment. |
| 11 | PSSR | Pressure Systems Safety Regulations; separate GB and NI instruments. | Safe limits and written-scheme examination where applicable. |
| 12 | WSE | Written scheme of examination for qualifying pressure systems. | A competent person defines the parts, nature and frequency of examination. |
| 13 | SWL | Safe working load. | Check the actual equipment configuration and marked limit. |
| 14 | ACOP | Approved Code of Practice. | Check approved edition and jurisdiction. |
| 15 | ERICPD | Eliminate, Reduce including substitution, Isolate, Control, personal protective equipment, Discipline. | A SHARE decision prompt; sustain effective controls and learning. |
| 16 | PPE | Personal protective equipment. | Use for assessed residual exposure; it does not replace stronger feasible controls. |