Crownway Fuels Ltd. CWF-PRO-WET. Version 1.0. Prepared 10 November 2026.

COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.

Explain who does what, in what sequence, the control rationale, evidence, escalation and safe restart conditions.

Scope and responsibility

RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.

Responsible roleRequired action
Engineering and asset integrity managerOwn the arrangement, its current scope and escalation.
Site manager and shift supervisorVerify worksite conditions, coordination, briefing and authorised limits.
Engineering and competent specialistsResolve technical uncertainties, verify protection and retain acceptance evidence.
Workers and contractor performing authorityCheck the agreed method, report change, stop loss of control and provide safe handback.

Information before release

Review current site and equipment information, assessments, permissions, competence, contractor interfaces and emergency readiness. The branch records identify the detailed evidence fields. Missing technical values are resolved from competent site information; do not copy values from teaching models.

Preparation and operation

1 Prepare the activity

Record opening stock, deliveries, sales and closing stock on a consistent basis for each tank and grade. Check gauge quality, units, temperature basis and meter information; maintain traceable corrections.

2 Carry out and control the work

Evaluate trends and unexplained loss promptly against site-specific triggers and leak-detection information. Investigate possible measurement errors without using that possibility to dismiss a credible release.

Control rationale

An underground leak may be invisible at the surface while contaminating soil or groundwater and creating vapour migration paths.

Stop escalation and return

Suspend affected tank/line where a leak alarm or credible unexplained loss cannot be safely resolved; protect drains, control ignition and activate incident escalation.

The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.

Verification and follow through

The site manager checks exceptions every operating day in this example arrangement and escalates a credible leak immediately. Engineering and environmental leads verify containment, pollution pathways and safe return before a restriction is removed.

Worked decision

Several reconciliations show unexplained loss and the gauge has intermittent faults. The site manager escalates both issues, restricts the affected system as assessed and obtains engineering and environmental investigation. The loss is not reset to zero by changing the spreadsheet.

This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.

Connected documents

ReferenceUse in this branch
CWF-PLN-WET-01Wetstock reconciliation and investigation plan (Plan)
CWF-FRM-WET-01Daily wetstock balance and exception log (Form)
CWF-CHK-WET-01Tank and line leak detection functional check (Checklist)
CWF-FRM-WET-02Suspected leak investigation and tank isolation record (Form)
CWF-REG-WET-01Underground tank and pipework monitoring history (Register)

Retain stable record IDs, actual site or asset, template revision, competent author, date and time, findings, actions, owner, due date and evidence. Set the applicable record-specific retention and access rules before operational use. A review date does not authorise deletion; preserve legal holds.

Guidance and related arrangements

Primary guidance 1

Bulk storage and tank farm safety

Crownway document overview

Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.

Primary references: using an underground storage tank

Related resources

Primary guidance