CWF-PLN-WET-01 · Completed fictional example · Owner role: Engineering and asset integrity manager
Wetstock reconciliation and investigation plan
Crownway Fuels Ltd. CWF-PLN-WET-01. Version 1.0. Prepared 10 November 2026.
COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.
Provide the site/task-specific wetstock reconciliation and investigation plan and retain its controlled output.
Purpose scope and accountable roles
RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.
Engineering and asset integrity manager owns delivery of this plan. Operations secures staffing and resources; engineering, the HSE lead and relevant competent specialists confirm technical and legal prerequisites. The board resolves constraints affecting critical controls.
Planned arrangements
Record opening stock, deliveries, sales and closing stock on a consistent basis for each tank and grade. Check gauge quality, units, temperature basis and meter information; maintain traceable corrections.
Evaluate trends and unexplained loss promptly against site-specific triggers and leak-detection information. Investigate possible measurement errors without using that possibility to dismiss a credible release.
Required planning outputs
Data sources: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Timing: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Tolerances: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Competent review: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Alarm ownership and escalation times: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Delivery verification and review
The site manager checks exceptions every operating day in this example arrangement and escalates a credible leak immediately. Engineering and environmental leads verify containment, pollution pathways and safe return before a restriction is removed.
| Stage | Example management arrangement |
| Before the activity | Owner confirms the scope, competent people, current information and permissions. Open critical prerequisites prevent release. |
| At implementation | Site supervisor verifies the physical arrangement and understanding. Engineering checks the accepted technical criteria for the affected equipment. |
| After change or failure | Suspend the affected scope, assess the changed risk, update information and brief people before a new decision. |
| Planned review | Owner reviews at a justified risk-based interval. Area management challenges evidence and independent assurance samples effectiveness. |
Stop escalation and return
Suspend affected tank/line where a leak alarm or credible unexplained loss cannot be safely resolved; protect drains, control ignition and activate incident escalation.
The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.
Worked decision
Several reconciliations show unexplained loss and the gauge has intermittent faults. The site manager escalates both issues, restricts the affected system as assessed and obtains engineering and environmental investigation. The loss is not reset to zero by changing the spreadsheet.
This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.
Guidance and related arrangements
Primary guidance 1
Bulk storage and tank farm safety
Crownway document overview
Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.
Primary references: using an underground storage tank