Pollution prevention and environmental permits procedure
Crownway Fuels Ltd. CWF-PRO-ENV. Version 1.0. Prepared 10 November 2026.
COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.
Explain who does what, in what sequence, the control rationale, evidence, escalation and safe restart conditions.
Scope and responsibility
BULK; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.
| Responsible role | Required action |
| Environmental lead | Own the arrangement, its current scope and escalation. |
| Site manager and shift supervisor | Verify worksite conditions, coordination, briefing and authorised limits. |
| Engineering and competent specialists | Resolve technical uncertainties, verify protection and retain acceptance evidence. |
| Workers and contractor performing authority | Check the agreed method, report change, stop loss of control and provide safe handback. |
Information before release
Review current site and equipment information, assessments, permissions, competence, contractor interfaces and emergency readiness. The branch records identify the detailed evidence fields. Missing technical values are resolved from competent site information; do not copy values from teaching models.
Preparation and operation
1 Prepare the activity
Identify fuel and chemical sources, drains, interceptors, groundwater, surface water, neighbours and sensitive receptors. Determine the actual operator and separate environmental authorisations for emissions, water, waste and other triggered activities.
2 Carry out and control the work
Maintain containment and drainage information, control bund or interceptor contents and use authorised waste routes. Verify whether a discharge needs sewerage-undertaker consent or an environmental permit; never assume a drain is an authorised disposal route.
Control rationale
Fuel, contaminated water and vapour can affect groundwater, surface water, neighbours and air even without an injury.
Stop escalation and return
Stop the source when safe for an uncontrolled release/discharge, failed containment/vapour control or operation outside a permit; isolate drains safely and escalate to the environmental lead/regulator as required.
The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.
Verification and follow through
Inspect permit conditions and monitoring against the installed activity and reporting dates. For petroleum storage certification, retain approved storage arrangements and change duties separately; the certificate is not an environmental permit.
Worked decision
A contractor proposes pumping interceptor contents to a surface-water drain. The environmental lead refuses discharge, confirms contents and drainage destination and arranges the appropriate authorised route. Work remains held until evidence supports that route.
This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.
Connected documents
| Reference | Use in this branch |
| CWF-REG-ENV-01 | Environmental aspects receptors and obligations register (Register) |
| CWF-REG-ENV-02 | Permits certificates and conditions compliance register (Register) |
| CWF-PLN-ENV-01 | Drainage interceptor and pollution prevention plan (Plan) |
| CWF-CHK-ENV-01 | Vapour recovery and emissions condition check (Checklist) |
| CWF-CHK-ENV-02 | Environmental site inspection and authorised bund drainage (Checklist) |
| CWF-FRM-ENV-01 | Environmental incident and regulator notification record (Form) |
Retain stable record IDs, actual site or asset, template revision, competent author, date and time, findings, actions, owner, due date and evidence. Set the applicable record-specific retention and access rules before operational use. A review date does not authorise deletion; preserve legal holds.
Guidance and related arrangements
Primary guidance 1
Primary guidance 2
Health and Safety Management Systems
Crownway document overview
Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.
Primary references: pollution prevention for businesses | prevent groundwater pollution from underground fuel storage tanks