| Environmental aspects receptors and obligations register guide | | | | | | | | |
| Purpose | | Provide the site/task-specific environmental aspects receptors and obligations register and retain its controlled output. | | | | | | |
| Scope | | BULK; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved. | | | | | | |
| Responsibility | | Environmental lead maintains current entries, unresolved restrictions and supporting evidence. No named person is appointed by this example. | | | | | | |
| Required details | | Fuel/air/water/land risks; Sensitive receptors; Permit triggers; Owners and controls | | | | | | |
| How to use | | Register is blank. Worked examples contains two invented open records, including missing details and a passed review date. Complete actual A:H inputs and retain the detailed technical record separately. | | | | | | |
| Preparing the activity | | Identify fuel and chemical sources, drains, interceptors, groundwater, surface water, neighbours and sensitive receptors. Determine the actual operator and separate environmental authorisations for emissions, water, waste and other triggered activities. | | | | | | |
| Operating arrangement | | Maintain containment and drainage information, control bund or interceptor contents and use authorised waste routes. Verify whether a discharge needs sewerage-undertaker consent or an environmental permit; never assume a drain is an authorised disposal route. | | | | | | |
| Verification | | Inspect permit conditions and monitoring against the installed activity and reporting dates. For petroleum storage certification, retain approved storage arrangements and change duties separately; the certificate is not an environmental permit. | | | | | | |
| Worked decision | | A contractor proposes pumping interceptor contents to a surface-water drain. The environmental lead refuses discharge, confirms contents and drainage destination and arranges the appropriate authorised route. Work remains held until evidence supports that route. | | | | | | |
| Stop and escalation | | Stop the source when safe for an uncontrolled release/discharge, failed containment/vapour control or operation outside a permit; isolate drains safely and escalate to the environmental lead/regulator as required. | | | | | | |
| Record alerts | | Alerts identify gaps A=ID, B=scope/subject, C=required detail, D=decision/action, E=evidence/owner, F=review due, G=status. Validity checks support record quality only. Human decisions and genuine evidence remain necessary. | | | | | | |
| Date controls | | Set As at date on each working sheet. Dates must be numeric whole days from 1 to 73050. Text, zero, negatives and fractional dates remain invalid even if pasted. A passed review date prompts review; it is not an automatic legal expiry. | | | | | | |
| Status and verification | | Use the exact categories below. Verified effective also needs a specific H entry describing the competent verifier, test, evidence and limits. A populated field or an empty alert cell does not prove those claims. | | | | | | |
| Keeping and extending records | | Twenty rows are prepared. To extend, enlarge the table and all bounded A10:A29 and I10:I29 summaries/duplicate ranges, copy formulas, validation and conditional formatting, update the print area and test the new last row. Keep IDs and evidence together when sorting. | | | | | | |
| Privacy and retention | | Set the approved record-specific retention period before operational use, including applicable statutory minimum, permit conditions and legal holds; review is not permission to delete. Access class in the catalogue: Project team. Keep clinical and personal information in authorised restricted custody. | | | | | | |
| Primary guidance checked 10 November 2026. Legal and permission registers retain their own detailed review dates, territories and unresolved decisions. | | | | | | | | |
| Health and Safety Management Systems | | | | | | | | |
| Allowed action status values | | | | | | | | |
| Open | | Official guidance 1 from www.gov.uk | | | | | | |
| Implemented | | Official guidance 2 from www.gov.uk | | | | | | |
| Awaiting verification | | | | | | | | |
| Verified effective | | | | | | | | |
| Reopened | | | | | | | | |
| Not applicable | | | | | | | | |