Drainage interceptor and pollution prevention plan
Crownway Fuels Ltd. CWF-PLN-ENV-01. Version 1.0. Prepared 10 November 2026.
COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.
Provide the site/task-specific drainage interceptor and pollution prevention plan and retain its controlled output.
Purpose scope and accountable roles
BULK; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.
Environmental lead owns delivery of this plan. Operations secures staffing and resources; engineering, the HSE lead and relevant competent specialists confirm technical and legal prerequisites. The board resolves constraints affecting critical controls.
Planned arrangements
Identify fuel and chemical sources, drains, interceptors, groundwater, surface water, neighbours and sensitive receptors. Determine the actual operator and separate environmental authorisations for emissions, water, waste and other triggered activities.
Maintain containment and drainage information, control bund or interceptor contents and use authorised waste routes. Verify whether a discharge needs sewerage-undertaker consent or an environmental permit; never assume a drain is an authorised disposal route.
Required planning outputs
Drain ownership/routes: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Discharge consent: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Interceptors: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Isolation: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Inspection and maintenance: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Delivery verification and review
Inspect permit conditions and monitoring against the installed activity and reporting dates. For petroleum storage certification, retain approved storage arrangements and change duties separately; the certificate is not an environmental permit.
| Stage | Example management arrangement |
| Before the activity | Owner confirms the scope, competent people, current information and permissions. Open critical prerequisites prevent release. |
| At implementation | Site supervisor verifies the physical arrangement and understanding. Engineering checks the accepted technical criteria for the affected equipment. |
| After change or failure | Suspend the affected scope, assess the changed risk, update information and brief people before a new decision. |
| Planned review | Owner reviews at a justified risk-based interval. Area management challenges evidence and independent assurance samples effectiveness. |
Stop escalation and return
Stop the source when safe for an uncontrolled release/discharge, failed containment/vapour control or operation outside a permit; isolate drains safely and escalate to the environmental lead/regulator as required.
The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.
Worked decision
A contractor proposes pumping interceptor contents to a surface-water drain. The environmental lead refuses discharge, confirms contents and drainage destination and arranges the appropriate authorised route. Work remains held until evidence supports that route.
This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.
Guidance and related arrangements
Primary guidance 1
Primary guidance 2
Health and Safety Management Systems
Crownway document overview
Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.
Primary references: pollution prevention for businesses | prevent groundwater pollution from underground fuel storage tanks