Routine workplace safety checklists
Short first-line checks for supervisors and operators. Each two-page form has twelve closed control questions, a findings and action register, and review fields.
Answer Yes or No against approved local criteria. Explain N/A exclusions. Escalate critical failures immediately. These forms do not replace a detailed audit, specialist inspection or statutory examination.
Download all Word and PDF forms · Proactive monitoring guidance
| Routine checklist | Industry | Checks | Download |
|---|---|---|---|
| Abrasive wheel tool pre-use Before use or wheel change | ![]() | 12 | Word · PDF |
| Asbestos information before disturbance Before maintenance or refurbishment | ![]() | 12 | Word · PDF |
| Bandsaw task set-up check Before each set-up or operator change | ![]() | 12 | Word · PDF |
| Battery charging area readiness Before charging | ![]() | 12 | Word · PDF |
| Biological laboratory start controls At the start of a work session | ![]() | 12 | Word · PDF |
| Brushcutter area and equipment check Before cutting and when the work area changes | ![]() | 12 | Word · PDF |
| Care-area frontline safety check At the start of the care shift | ![]() | 12 | Word · PDF |
| Chemical decanting start check Before each transfer | ![]() | 12 | Word · PDF |
| Chemical process shift handover Each shift | ![]() | 12 | Word · PDF |
| Chemical store routine walk-round Daily or after deliveries | ![]() | 12 | Word · PDF |
| Cleaning task readiness Before each cleaning task | ![]() | 12 | Word · PDF |
| Cold environment work readiness Before and during cold exposure | ![]() | 12 | Word · PDF |
| Commercial dishwasher task controls Before service and chemical replenishment | ![]() | 12 | Word · PDF |
| Compressed air tool and hose check Before use | ![]() | 12 | Word · PDF |
| Concrete and wet cement task checks Before mixing or placing | ![]() | 12 | Word · PDF |
| Confined space entry control check For each planned entry | ![]() | 12 | Word · PDF |
| Construction supervisor shift walk-round Before each shift and after material change | ![]() | 12 | Word · PDF |
| Contractor task start controls Before each contractor task | ![]() | 12 | Word · PDF |
| Conveyor shift start controls Before operation | ![]() | 12 | Word · PDF |
| Crane lift start controls Before each planned lift | ![]() | 12 | Word · PDF |
| Demolition phase start check Before each planned phase | ![]() | 12 | Word · PDF |
| Display screen workstation set-up On set-up and after changes | ![]() | 12 | Word · PDF |
| Dockside task start check Before cargo or maintenance tasks | ![]() | 12 | Word · PDF |
| Electric vehicle task boundary check Before work on an EV or hybrid | ![]() | 12 | Word · PDF |
| Emergency drill preparation and follow-up Before a planned drill and at debrief | ![]() | 12 | Word · PDF |
| Engineering workshop shift readiness Before each shift | ![]() | 12 | Word · PDF |
| Evacuation assistance shift readiness At opening and when occupants or arrangements change | ![]() | 12 | Word · PDF |
| Event opening safety readiness Before admission | ![]() | 12 | Word · PDF |
| Excavation daily control check Before entry and after relevant events | ![]() | 12 | Word · PDF |
| Farm work shift readiness Before farm tasks | ![]() | 12 | Word · PDF |
| Fatigue-sensitive shift readiness Before safety-critical shifts | ![]() | 12 | Word · PDF |
| Fire-route and readiness check At opening or the agreed routine interval | ![]() | 12 | Word · PDF |
| First aid provision readiness At opening or each shift | ![]() | 12 | Word · PDF |
| Flammable atmosphere control readiness Before the relevant process | ![]() | 12 | Word · PDF |
| Food production shift safety check Before production | ![]() | 12 | Word · PDF |
| Forklift operator pre-use check Before each operator shift | ![]() | 12 | Word · PDF |
| Fryer use and oil-change readiness Before use or a planned oil change | ![]() | 12 | Word · PDF |
| Gas appliance user safety check At opening or before operation | ![]() | 12 | Word · PDF |
| Ground disturbance service checks Before breaking ground | ![]() | 12 | Word · PDF |
| Ground-level chainsaw task readiness Before each ground-level cutting task | ![]() | 12 | Word · PDF |
| Grounds mower pre-use and route check Before mowing and after conditions change | ![]() | 12 | Word · PDF |
| Health surveillance follow-through At the scheduled management review | ![]() | 12 | Word · PDF |
| Hire depot handover readiness Each dispatch or return inspection | ![]() | 12 | Word · PDF |
| Homeworking task and workstation review At set-up and when the work arrangement changes | ![]() | 12 | Word · PDF |
| Hot work environment readiness Before and during hot conditions | ![]() | 12 | Word · PDF |
| Hot-work start and finish check Before hot work and after the specified fire watch | ![]() | 12 | Word · PDF |
| Incident reporting and escalation check After an incident or near miss | ![]() | 12 | Word · PDF |
| Indoor engine exhaust control check Before running an engine indoors | ![]() | 12 | Word · PDF |
| Kitchen and hospitality opening check Before service | ![]() | 12 | Word · PDF |
| Kitchen knife preparation and storage Before food preparation and at handover | ![]() | 12 | Word · PDF |
| Ladder pre-use and positioning Before each ladder use | ![]() | 12 | Word · PDF |
| Lathe operator start check Before each operator shift | ![]() | 12 | Word · PDF |
| Lead exposure task controls Before the lead-related task | ![]() | 12 | Word · PDF |
| Lifting accessory pre-use check Before each use | ![]() | 12 | Word · PDF |
| Lifting-task readiness check Before each planned lifting task | ![]() | 12 | Word · PDF |
| Loading bay departure controls Each loading operation | ![]() | 12 | Word · PDF |
| Local exhaust ventilation user check Before each use | ![]() | 12 | Word · PDF |
| Lone worker start and return check Each lone-working assignment | ![]() | 12 | Word · PDF |
| Machinery operator pre-use check Before use or each operator shift | ![]() | 12 | Word · PDF |
| Maintenance isolation verification Each isolation task | ![]() | 12 | Word · PDF |
| Manual handling task readiness Before the handling task | ![]() | 12 | Word · PDF |
| Mobile elevating platform pre-use Before use and after relocation | ![]() | 12 | Word · PDF |
| Nitrogen and inert-gas task boundary check Before inert-gas use and after conditions change | ![]() | 12 | Word · PDF |
| Noise and vibrating-tool shift check Before the exposure task and at shift end | ![]() | 12 | Word · PDF |
| Outdoor ultraviolet exposure controls Before outdoor shifts | ![]() | 12 | Word · PDF |
| Pallet truck movement readiness Before use and each changed load | ![]() | 12 | Word · PDF |
| Person hoist transfer readiness Before each assisted transfer | ![]() | 12 | Word · PDF |
| Personal protective equipment start check Before each relevant task | ![]() | 12 | Word · PDF |
| Pesticide application start controls Before each planned application | ![]() | 12 | Word · PDF |
| Pillar drill workpiece set-up Before each set-up | ![]() | 12 | Word · PDF |
| Portable electrical equipment visual check Before use; visual check only | ![]() | 12 | Word · PDF |
| Portable power tool start check Before each use | ![]() | 12 | Word · PDF |
| Pregnancy work adjustment follow-through At agreed review intervals and after changes | ![]() | 12 | Word · PDF |
| Press machine safeguarding check Before the shift | ![]() | 12 | Word · PDF |
| Pressure system operator readiness Before operation | ![]() | 12 | Word · PDF |
| Process change implementation readiness Before releasing a plant or procedural change | ![]() | 12 | Word · PDF |
| Process line-breaking permit readiness Before opening the identified process system | ![]() | 12 | Word · PDF |
| Process shutdown and handover check Before shutdown and at each defined hold point | ![]() | 12 | Word · PDF |
| Process start-up hold-point check Before the authorised start-up stage | ![]() | 12 | Word · PDF |
| Public-facing violence prevention check Before opening or a visit | ![]() | 12 | Word · PDF |
| Quarry operating area readiness Before each shift | ![]() | 12 | Word · PDF |
| Radiation controlled task readiness Before an authorised task | ![]() | 12 | Word · PDF |
| Respiratory protection wearer check Before each use | ![]() | 12 | Word · PDF |
| Retail opening safety check Before opening | ![]() | 12 | Word · PDF |
| Return-to-work task adjustment follow-through Before return and at the agreed review interval | ![]() | 12 | Word · PDF |
| Roadwork shift protection check Before work and after layout changes | ![]() | 12 | Word · PDF |
| Roof access and fragile surface check Before roof work | ![]() | 12 | Word · PDF |
| Safety arrangements shift handover Each shift | ![]() | 12 | Word · PDF |
| Scaffold user access check Before use and after changes | ![]() | 12 | Word · PDF |
| School premises daily safety check Before occupancy | ![]() | 12 | Word · PDF |
| Sharps task and disposal check Before procedures and at shift end | ![]() | 12 | Word · PDF |
| Silica-generating task start check Before cutting drilling or grinding | ![]() | 12 | Word · PDF |
| Simultaneous task interface check Before overlapping tasks and when permits change | ![]() | 12 | Word · PDF |
| Solvent cleaning task readiness Before each cleaning task | ![]() | 12 | Word · PDF |
| Spray process control readiness Before each spraying session | ![]() | 12 | Word · PDF |
| Substance-task start check Before each substance task | ![]() | 12 | Word · PDF |
| Task briefing and supervision check Before the shift task | ![]() | 12 | Word · PDF |
| Task risk assessment start check Before a new or changed task | ![]() | 12 | Word · PDF |
| Temporary works use readiness Before loading or each shift | ![]() | 12 | Word · PDF |
| Tree work site start controls Before each task | ![]() | 12 | Word · PDF |
| Tyre inflation task readiness For each inflation operation | ![]() | 12 | Word · PDF |
| Vehicle lift positioning and release Before raising each vehicle | ![]() | 12 | Word · PDF |
| Vehicle workshop daily readiness Before the workshop shift | ![]() | 12 | Word · PDF |
| Vibrating tool daily exposure check Before use and at shift end | ![]() | 12 | Word · PDF |
| Warehouse order-picking task check At shift start and when the pick changes | ![]() | 12 | Word · PDF |
| Warehouse racking visual check Daily walk-round | ![]() | 12 | Word · PDF |
| Warehouse shift readiness Before each shift | ![]() | 12 | Word · PDF |
| Waste and spill-control walk-round Daily and after deliveries or severe weather | ![]() | 12 | Word · PDF |
| Waste handling shift readiness Before each shift | ![]() | 12 | Word · PDF |
| Wastewater contact task readiness Before the task | ![]() | 12 | Word · PDF |
| Water system routine control record At the written control scheme interval | ![]() | 12 | Word · PDF |
| Welding fume and arc controls Before each welding task | ![]() | 12 | Word · PDF |
| Wet-work skin protection check Before wet work and at shift review | ![]() | 12 | Word · PDF |
| Wood dust task control check Before machining or sanding | ![]() | 12 | Word · PDF |
| Woodworking shop shift readiness Before each shift | ![]() | 12 | Word · PDF |
| Work journey start check Before each work journey | ![]() | 12 | Word · PDF |
| Work near overhead lines readiness Before plant movement or raised work near lines | ![]() | 12 | Word · PDF |
| Work-at-height task readiness Before use and after conditions change | ![]() | 12 | Word · PDF |
| Worker consultation follow-through Weekly or after a change | ![]() | 12 | Word · PDF |
| Workload and support check Weekly team review | ![]() | 12 | Word · PDF |
| Workplace opening walk-round Before opening or each shift | ![]() | 12 | Word · PDF |
| Workplace transport route check Before vehicle movements each shift | ![]() | 12 | Word · PDF |
| Workplace welfare and environment check Daily | ![]() | 12 | Word · PDF |
| Young worker first task check Before task allocation and after changes | ![]() | 12 | Word · PDF |












































































