| Active permits and simultaneous operations board guide | | | | | | | | |
| Purpose | | Provide the site/task-specific active permits and simultaneous operations board and retain its controlled output. | | | | | | |
| Scope | | BULK; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved. | | | | | | |
| Responsibility | | Engineering and asset integrity manager maintains current entries, unresolved restrictions and supporting evidence. No named person is appointed by this example. | | | | | | |
| Required details | | Permit ID; Location; Task; Hazards; Interfaces; Isolations; Issuer; Acceptor and expiry | | | | | | |
| How to use | | Register is blank. Worked examples contains two invented open records, including missing details and a passed review date. Complete actual A:H inputs and retain the detailed technical record separately. | | | | | | |
| Preparing the activity | | Define the exact task, equipment boundary, hazards, isolation references, work party, other permits and validity. The issuer checks the worksite and confirms prerequisites with the performing authority. | | | | | | |
| Operating arrangement | | Coordinate hot work, line breaking, electrical work, entry and adjacent operations as one work picture. Brief the team and suspend when scope, personnel, protection or conditions change. A signature does not replace field verification. | | | | | | |
| Verification | | At handback, account for people and equipment, inspect the work, resolve test and reinstatement requirements and close linked permits in the correct sequence. Operations retains separate authority for return to service. | | | | | | |
| Worked decision | | A cleaning permit and a nearby ignition-producing task are individually documented but their boundaries overlap. The permit coordinator suspends the conflict, reviews simultaneous operations with both parties and issues fresh agreed conditions only after the conflict is resolved. | | | | | | |
| Stop and escalation | | Stop if scope, conditions, shifts or isolations change; if gas limits are exceeded, conflicting work starts or any permit condition is not met. Revalidate before restarting. | | | | | | |
| Record alerts | | Alerts identify gaps A=ID, B=scope/subject, C=required detail, D=decision/action, E=evidence/owner, F=review due, G=status. Validity checks support record quality only. Human decisions and genuine evidence remain necessary. | | | | | | |
| Date controls | | Set As at date on each working sheet. Dates must be numeric whole days from 1 to 73050. Text, zero, negatives and fractional dates remain invalid even if pasted. A passed review date prompts review; it is not an automatic legal expiry. | | | | | | |
| Status and verification | | Use the exact categories below. Verified effective also needs a specific H entry describing the competent verifier, test, evidence and limits. A populated field or an empty alert cell does not prove those claims. | | | | | | |
| Keeping and extending records | | Twenty rows are prepared. To extend, enlarge the table and all bounded A10:A29 and I10:I29 summaries/duplicate ranges, copy formulas, validation and conditional formatting, update the print area and test the new last row. Keep IDs and evidence together when sorting. | | | | | | |
| Privacy and retention | | Set the approved record-specific retention period before operational use, including applicable statutory minimum, permit conditions and legal holds; review is not permission to delete. Access class in the catalogue: Project team. Keep clinical and personal information in authorised restricted custody. | | | | | | |
| Primary guidance checked 10 November 2026. Legal and permission registers retain their own detailed review dates, territories and unresolved decisions. | | | | | | | | |
| Permit-to-work Systems | | | | | | | | |
| Allowed action status values | | | | | | | | |
| Open | | Official guidance 1 from www.hse.gov.uk | | | | | | |
| Implemented | | | | | | | | |
| Awaiting verification | | | | | | | | |
| Verified effective | | | | | | | | |
| Reopened | | | | | | | | |
| Not applicable | | | | | | | | |
| SHARE home | | | | | | | | |