| Pressure system and lifting examination applicability register guide | | | | | | | | |
| Purpose | | Provide the site/task-specific pressure system and lifting examination applicability register and retain its controlled output. | | | | | | |
| Scope | | BULK; HQ; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved. | | | | | | |
| Responsibility | | Engineering and asset integrity manager maintains current entries, unresolved restrictions and supporting evidence. No named person is appointed by this example. | | | | | | |
| Required details | | Relevant fluid/system or lifting equipment; Written scheme/examination need; Competent person; Report and defect action | | | | | | |
| How to use | | Register is blank. Worked examples contains two invented open records, including missing details and a passed review date. Complete actual A:H inputs and retain the detailed technical record separately. | | | | | | |
| Preparing the activity | | Engineering identifies assets and degradation modes, assigns criticality and defines competent inspection, maintenance, examination and proof-test requirements. Distinguish each activity and its evidence. | | | | | | |
| Operating arrangement | | Schedule work with isolation, permits, spares and competent contractors available. Track overdue safety-critical tasks and impairments with risk review and restrictions; do not silently roll the due date forward. | | | | | | |
| Verification | | Record as-found defects, work performed, test acceptance and as-left status. Confirm whether pressure-system or lifting-equipment duties are triggered by the actual equipment. A fuel tank is not automatically a qualifying pressure system. | | | | | | |
| Worked decision | | A safety-critical inspection is overdue and no justification supports continued operation. Engineering escalates the impairment to operations and the board, establishes restrictions and obtains competent examination. Closing the work order without results is refused. | | | | | | |
| Stop and escalation | | Take affected equipment out of use for danger, failed safety function or examination prohibition; escalate critical backlog with explicit operating restriction and authority. | | | | | | |
| Record alerts | | Alerts identify gaps A=ID, B=scope/subject, C=required detail, D=decision/action, E=evidence/owner, F=review due, G=status. Validity checks support record quality only. Human decisions and genuine evidence remain necessary. | | | | | | |
| Date controls | | Set As at date on each working sheet. Dates must be numeric whole days from 1 to 73050. Text, zero, negatives and fractional dates remain invalid even if pasted. A passed review date prompts review; it is not an automatic legal expiry. | | | | | | |
| Status and verification | | Use the exact categories below. Verified effective also needs a specific H entry describing the competent verifier, test, evidence and limits. A populated field or an empty alert cell does not prove those claims. | | | | | | |
| Keeping and extending records | | Twenty rows are prepared. To extend, enlarge the table and all bounded A10:A29 and I10:I29 summaries/duplicate ranges, copy formulas, validation and conditional formatting, update the print area and test the new last row. Keep IDs and evidence together when sorting. | | | | | | |
| Privacy and retention | | Set the approved record-specific retention period before operational use, including applicable statutory minimum, permit conditions and legal holds; review is not permission to delete. Access class in the catalogue: Project team. Keep clinical and personal information in authorised restricted custody. | | | | | | |
| Primary guidance checked 10 November 2026. Legal and permission registers retain their own detailed review dates, territories and unresolved decisions. | | | | | | | | |
| Health and Safety Management Systems | | | | | | | | |
| Allowed action status values | | | | | | | | |
| Open | | Official guidance 1 from www.hse.gov.uk | | | | | | |
| Implemented | | Official guidance 2 from www.hse.gov.uk | | | | | | |
| Awaiting verification | | | | | | | | |
| Verified effective | | | | | | | | |
| Reopened | | | | | | | | |
| Not applicable | | | | | | | | |