| Safety critical elements and performance standards register guide | | | | | | | | |
| Purpose | | Provide the site/task-specific safety critical elements and performance standards register and retain its controlled output. | | | | | | |
| Scope | | BULK. Apply to the requested lower-tier scenario only; verify inventory, configuration and jurisdiction. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved. | | | | | | |
| Responsibility | | Process safety and COMAH lead maintains current entries, unresolved restrictions and supporting evidence. No named person is appointed by this example. | | | | | | |
| Required details | | Barrier owner; Function; Availability; Independence; Test criteria; Inspection intervals and impairment limits | | | | | | |
| How to use | | Register is blank. Worked examples contains two invented open records, including missing details and a passed review date. Complete actual A:H inputs and retain the detailed technical record separately. | | | | | | |
| Preparing the activity | | For an establishment found in scope, the operator identifies major-accident scenarios affecting people and the environment, including domino and common-cause effects. The board sets prevention commitments and provides competent resources. | | | | | | |
| Operating arrangement | | Implement the MAPP through proportionate arrangements for organisation, hazard evaluation, operating control, change, emergencies, monitoring, audit and review. Keep notification and public-information duties distinct from the additional upper-tier safety-report and emergency-plan duties. | | | | | | |
| Verification | | Challenge a representative loss-of-containment scenario from initiating event through every claimed barrier. Trace owners, performance criteria, independence, tests and impairment response. A low personal-injury rate does not demonstrate major-accident control. | | | | | | |
| Worked decision | | A proposed independent overfill trip shares an unverified power supply with the normal level instrument. Engineering records the dependency and holds acceptance of the independent-protection claim. The scenario stays open pending competent evaluation and tested design evidence. | | | | | | |
| Stop and escalation | | Suspend the affected activity when a required major-accident barrier is unavailable without an approved, time-limited safe alternative; unresolved risk is escalated to the site accountable manager and board. | | | | | | |
| Record alerts | | Alerts identify gaps A=ID, B=scope/subject, C=required detail, D=decision/action, E=evidence/owner, F=review due, G=status. Validity checks support record quality only. Human decisions and genuine evidence remain necessary. | | | | | | |
| Date controls | | Set As at date on each working sheet. Dates must be numeric whole days from 1 to 73050. Text, zero, negatives and fractional dates remain invalid even if pasted. A passed review date prompts review; it is not an automatic legal expiry. | | | | | | |
| Status and verification | | Use the exact categories below. Verified effective also needs a specific H entry describing the competent verifier, test, evidence and limits. A populated field or an empty alert cell does not prove those claims. | | | | | | |
| Keeping and extending records | | Twenty rows are prepared. To extend, enlarge the table and all bounded A10:A29 and I10:I29 summaries/duplicate ranges, copy formulas, validation and conditional formatting, update the print area and test the new last row. Keep IDs and evidence together when sorting. | | | | | | |
| Privacy and retention | | Set the approved record-specific retention period before operational use, including applicable statutory minimum, permit conditions and legal holds; review is not permission to delete. Access class in the catalogue: Project team. Keep clinical and personal information in authorised restricted custody. | | | | | | |
| Primary guidance checked 10 November 2026. Legal and permission registers retain their own detailed review dates, territories and unresolved decisions. | | | | | | | | |
| What Process Safety Management Is | | | | | | | | |
| Allowed action status values | | | | | | | | |
| Open | | Official guidance 1 from www.hse.gov.uk | | | | | | |
| Implemented | | Official guidance 2 from www.legislation.gov.uk | | | | | | |
| Awaiting verification | | | | | | | | |
| Verified effective | | | | | | | | |
| Reopened | | | | | | | | |
| Not applicable | | | | | | | | |