CWF-PRO-SCOPE · Completed fictional example · Owner role: Health safety and environmental lead
Site inventory and regulatory applicability procedure
Crownway Fuels Ltd. CWF-PRO-SCOPE. Version 1.0. Prepared 10 November 2026.
COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.
Explain who does what, in what sequence, the control rationale, evidence, escalation and safe restart conditions.
Scope and responsibility
BULK; HQ; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.
| Responsible role | Required action |
| Health safety and environmental lead | Own the arrangement, its current scope and escalation. |
| Site manager and shift supervisor | Verify worksite conditions, coordination, briefing and authorised limits. |
| Engineering and competent specialists | Resolve technical uncertainties, verify protection and retain acceptance evidence. |
| Workers and contractor performing authority | Check the agreed method, report change, stop loss of control and provide safe handback. |
Information before release
Review current site and equipment information, assessments, permissions, competence, contractor interfaces and emergency readiness. The branch records identify the detailed evidence fields. Missing technical values are resolved from competent site information; do not copy values from teaching models.
Preparation and operation
1 Prepare the activity
Build a site-by-site inventory of the operator, activities, nation, maximum dangerous-substance holdings and wastes. Use classifications from current safety data and competent advice; sales throughput is not the COMAH inventory.
2 Carry out and control the work
The environmental, engineering and process-safety leads determine independent permission routes. Record petroleum certification, environmental permitting, planning and hazardous-substances consent separately, including changes and pre-start requirements.
Control rationale
Hazards and legal thresholds attach to actual substances, quantities, activities and establishment boundaries, not the company name.
Stop escalation and return
No new fuel, capacity increase, boundary change or activity starts with an unresolved tier, permit, certificate or material-change notification decision.
The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.
Verification and follow through
Reconcile the inventory against purchase limits, tank capacity, process holdings and credible temporary storage. Have a competent reviewer check Schedule 1 classification and aggregation before assigning any COMAH tier.
Worked decision
The bulk teaching scenario is described as lower tier but its product maxima are absent. The process-safety lead records an unresolved applicability decision and holds design and operating decisions that depend on the tier. A label in the catalogue does not establish the legal outcome.
This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.
Connected documents
| Reference | Use in this branch |
| CWF-REG-SCOPE-01 | Site and establishment applicability register (Register) |
| CWF-REG-SCOPE-02 | Dangerous substances inventory and safety data register (Register) |
| CWF-RA-SCOPE-01 | COMAH threshold and aggregation assessment (Risk assessment) |
| CWF-CHK-SCOPE-01 | Forecourt petroleum certificate and permitted activity screen (Checklist) |
| CWF-FRM-SCOPE-01 | Regulatory notification and consent change decision (Form) |
| CWF-PLN-SCOPE-01 | Site layout drainage receptors and emergency access plan (Plan) |
Retain stable record IDs, actual site or asset, template revision, competent author, date and time, findings, actions, owner, due date and evidence. Set the applicable record-specific retention and access rules before operational use. A review date does not authorise deletion; preserve legal holds.
Guidance and related arrangements
Primary guidance 1
Primary guidance 2
UK Legal Framework
Crownway document overview
Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.
Primary references: comah15 | owner petrol station