Explain who does what, in what sequence, the control rationale, evidence, escalation and safe restart conditions.
Scope and responsibility
BULK; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.
| Responsible role | Required action |
| Competent DSEAR and Ex specialist | Own the arrangement, its current scope and escalation. |
| Site manager and shift supervisor | Verify worksite conditions, coordination, briefing and authorised limits. |
| Engineering and competent specialists | Resolve technical uncertainties, verify protection and retain acceptance evidence. |
| Workers and contractor performing authority | Check the agreed method, report change, stop loss of control and provide safe handback. |
Information before release
Review current site and equipment information, assessments, permissions, competence, contractor interfaces and emergency readiness. The branch records identify the detailed evidence fields. Missing technical values are resolved from competent site information; do not copy values from teaching models.
Preparation and operation
1 Prepare the activity
Record the hazardous-area basis, equipment identity, protection concept, certification, environmental conditions and installation requirements. Distinguish explosion protection from electrical shock protection.
2 Carry out and control the work
Use competent people for design, installation, inspection and repair. Assess bonding and static-generating activities for the actual transfer system. Control temporary equipment and prevent unauthorised modifications or substitutions.
Control rationale
An ordinary electrical inspection does not by itself establish that equipment remains suitable for its hazardous area.
Stop escalation and return
Isolate defective or uncertified-for-purpose equipment, damaged Ex enclosures/glands, ineffective required earthing or unassessed temporary electrical equipment in a hazardous area.
The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.
Verification and follow through
Compare a selected asset, its marking, certificate conditions and inspection findings with the installed location. Resolve missing evidence and defects through engineering and the Ex specialist before relying on the equipment.
Worked decision
A replacement component fits mechanically but its explosion-protection suitability is not established. Procurement quarantines it and engineering checks compatibility, certification and installation conditions. Availability of a spare does not authorise its use.
This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.
Connected documents
| Reference | Use in this branch |
| CWF-REG-EX-01 | Explosion protected equipment and certification dossier (Register) |
| CWF-PLN-EX-01 | Hazardous area electrical inspection programme (Plan) |
| CWF-CHK-EX-01 | Ex equipment inspection and defect classification (Checklist) |
| CWF-CHK-EX-02 | Bonding earthing and lightning verification (Checklist) |
| CWF-PTW-EX-01 | Temporary electrical equipment approval (Permit) |
| CWF-RA-EX-01 | EV charging and fuel infrastructure interface assessment (Risk assessment) |
Retain stable record IDs, actual site or asset, template revision, competent author, date and time, findings, actions, owner, due date and evidence. Set the applicable record-specific retention and access rules before operational use. A review date does not authorise deletion; preserve legal holds.
Guidance and related arrangements
Primary guidance 1
Primary guidance 2
ATEX and explosive atmospheres
Crownway document overview
Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.
Primary references: dsear | electricity