Hazardous area electrical inspection programme

CWF-PLN-EX-01 · Completed fictional example · Owner role: Competent DSEAR and Ex specialist

Fictional arrangement or blank working master. No actual approval, site authorisation or completed evidence is supplied.

Hazardous area electrical inspection programme

Crownway Fuels Ltd. CWF-PLN-EX-01. Version 1.0. Prepared 10 November 2026.

COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.

Provide the site/task-specific hazardous area electrical inspection programme and retain its controlled output.

Purpose scope and accountable roles

BULK; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.

Competent DSEAR and Ex specialist owns delivery of this plan. Operations secures staffing and resources; engineering, the HSE lead and relevant competent specialists confirm technical and legal prerequisites. The board resolves constraints affecting critical controls.

Planned arrangements

Record the hazardous-area basis, equipment identity, protection concept, certification, environmental conditions and installation requirements. Distinguish explosion protection from electrical shock protection.

Use competent people for design, installation, inspection and repair. Assess bonding and static-generating activities for the actual transfer system. Control temporary equipment and prevent unauthorised modifications or substitutions.

Required planning outputs

Initial/periodic inspection scope: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.

Competent persons: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.

Risk-based frequency and defect priority: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.

Delivery verification and review

Compare a selected asset, its marking, certificate conditions and inspection findings with the installed location. Resolve missing evidence and defects through engineering and the Ex specialist before relying on the equipment.

StageExample management arrangement
Before the activityOwner confirms the scope, competent people, current information and permissions. Open critical prerequisites prevent release.
At implementationSite supervisor verifies the physical arrangement and understanding. Engineering checks the accepted technical criteria for the affected equipment.
After change or failureSuspend the affected scope, assess the changed risk, update information and brief people before a new decision.
Planned reviewOwner reviews at a justified risk-based interval. Area management challenges evidence and independent assurance samples effectiveness.

Stop escalation and return

Isolate defective or uncertified-for-purpose equipment, damaged Ex enclosures/glands, ineffective required earthing or unassessed temporary electrical equipment in a hazardous area.

The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.

Worked decision

A replacement component fits mechanically but its explosion-protection suitability is not established. Procurement quarantines it and engineering checks compatibility, certification and installation conditions. Availability of a spare does not authorise its use.

This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.

Guidance and related arrangements

Primary guidance 1

Primary guidance 2

ATEX and explosive atmospheres

Crownway document overview

Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.

Primary references: dsear | electricity