Crownway Fuels

SHAREhub · Company management system · v1.0

← All Crownway resources

Fuel emergency response and recovery procedure

CWF-PRO-EMERG · Completed fictional example · Owner role: Operations director and area manager

Fictional arrangement or blank working master. No actual approval, site authorisation or completed evidence is supplied.

Fuel emergency response and recovery procedure

Crownway Fuels Ltd. CWF-PRO-EMERG. Version 1.0. Prepared 10 November 2026.

COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.

Explain who does what, in what sequence, the control rationale, evidence, escalation and safe restart conditions.

Scope and responsibility

BULK; HQ; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.

Responsible roleRequired action
Operations director and area managerOwn the arrangement, its current scope and escalation.
Site manager and shift supervisorVerify worksite conditions, coordination, briefing and authorised limits.
Engineering and competent specialistsResolve technical uncertainties, verify protection and retain acceptance evidence.
Workers and contractor performing authorityCheck the agreed method, report change, stop loss of control and provide safe handback.

Information before release

Review current site and equipment information, assessments, permissions, competence, contractor interfaces and emergency readiness. The branch records identify the detailed evidence fields. Missing technical values are resolved from competent site information; do not copy values from teaching models.

Preparation and operation

1 Prepare the activity

Plan for credible fuel releases, fire, exposure, vehicle incidents, utility failures and adverse weather. Establish alarm, safe withdrawal, customer evacuation, accountability, responder access and communication for every operating period.

2 Carry out and control the work

People raise the alarm and summon emergency assistance promptly. Isolate or contain only within their training and from a safe position. Prevent re-entry and unplanned rescue; give responders current substance and site information.

Control rationale

A release can escalate before external responders arrive; safe shutdown, evacuation and containment require rehearsed site-specific decisions.

Stop escalation and return

Raise the alarm, stop operations remotely if safe, keep people away/upwind as appropriate and call emergency services; do not enter vapour/fire zones or attempt response beyond training and equipment.

The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.

Verification and follow through

Exercise representative scenarios and check night-shift and contractor arrangements. Recovery requires engineering, environmental and operational checks for the actual damage, contamination and failed protection before a separate restart decision.

Worked decision

A night-shift exercise shows that the nominated controller is unavailable and the access gate key cannot be located. Operations retains the readiness gap, provides a workable interim arrangement and repeats the access and communication exercise before accepting cover.

This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.

Connected documents

ReferenceUse in this branch
CWF-PLN-EMERG-01Site fuel emergency response plan (Plan)
CWF-PLN-EMERG-02Lower tier COMAH major accident emergency arrangements (Plan)
CWF-PLN-EMERG-03Spill drainage isolation and firewater response plan (Plan)
CWF-CHK-EMERG-01Emergency equipment and communication readiness check (Checklist)
CWF-FRM-EMERG-01Exercise drill and responder liaison record (Form)
CWF-CHK-EMERG-02Incident stabilisation and authorised restart review (Checklist)

Retain stable record IDs, actual site or asset, template revision, competent author, date and time, findings, actions, owner, due date and evidence. Set the applicable record-specific retention and access rules before operational use. A review date does not authorise deletion; preserve legal holds.

Guidance and related arrangements

Primary guidance 1

Primary guidance 2

Health and Safety Management Systems

Crownway document overview

Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.

Primary references: comah | fireandexplosion

Related resources

Primary guidance