Petrol tanker delivery and forecourt unloading procedure

CWF-PRO-DEL · Completed fictional example · Owner role: Site manager and shift supervisor

Fictional arrangement or blank working master. No actual approval, site authorisation or completed evidence is supplied.

Petrol tanker delivery and forecourt unloading procedure

Crownway Fuels Ltd. CWF-PRO-DEL. Version 1.0. Prepared 10 November 2026.

COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.

Explain who does what, in what sequence, the control rationale, evidence, escalation and safe restart conditions.

Scope and responsibility

RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.

Responsible roleRequired action
Site manager and shift supervisorOwn the arrangement, its current scope and escalation. Verify worksite conditions, coordination, briefing and authorised limits.
Engineering and competent specialistsResolve technical uncertainties, verify protection and retain acceptance evidence.
Workers and contractor performing authorityCheck the agreed method, report change, stop loss of control and provide safe handback.

Information before release

Review current site and equipment information, assessments, permissions, competence, contractor interfaces and emergency readiness. The branch records identify the detailed evidence fields. Missing technical values are resolved from competent site information; do not copy values from teaching models.

Preparation and operation

1 Prepare the activity

Site and carrier agree the unloading model, competence, responsibilities, delivery window and emergency communication. Verify the ordered grade, compartment quantity, receiving tank identity and available capacity using reliable current information.

2 Carry out and control the work

Before connection, confirm the receiving route, venting and recovery arrangements, equipment condition, safe tanker position and public segregation. Monitor transfer under the agreed attended or driver-controlled arrangements and stop on any loss of control.

Control rationale

Wrong-tank delivery, inadequate ullage, drive-away and poor site-driver coordination can cause a rapid vapour release and ignition.

Stop escalation and return

Do not connect or continue if tank identity/capacity is uncertain, safeguards or communications fail, there is leakage, vapour, ignition risk, unsafe public access, unexpected level change or an emergency.

The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.

Verification and follow through

Before departure, verify the transfer has ended safely, connections are correctly disconnected and secured, delivered quantities are reconciled and defects are communicated. The responsible parties retain the delivery and receiving evidence.

Worked decision

The delivery note and local tank label do not agree. The driver and site supervisor do not connect, segregate the delivery area and escalate to engineering and the carrier. Delivery remains held until identity and capacity are independently resolved and the parties repeat the pre-delivery checks.

This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.

Connected documents

ReferenceUse in this branch
CWF-RA-DEL-01Site specific tanker unloading assessment (Risk assessment)
CWF-PLN-DEL-01Tanker operator and site interface agreement (Plan)
CWF-CHK-DEL-01Pre delivery tank product and ullage check (Checklist)
CWF-CHK-DEL-02Unloading connection monitoring and completion check (Checklist)
CWF-FRM-DEL-01Rejected or aborted delivery record (Form)
CWF-FRM-DEL-02Delivery discrepancy and overfill near miss report (Form)

Retain stable record IDs, actual site or asset, template revision, competent author, date and time, findings, actions, owner, due date and evidence. Set the applicable record-specific retention and access rules before operational use. A review date does not authorise deletion; preserve legal holds.

Guidance and related arrangements

Primary guidance 1

Primary guidance 2

Standard Operating Procedures

Crownway document overview