CWF-PLN-DEL-01 · Completed fictional example · Owner role: Site manager and shift supervisor
Tanker operator and site interface agreement
Crownway Fuels Ltd. CWF-PLN-DEL-01. Version 1.0. Prepared 10 November 2026.
COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.
Provide the site/task-specific tanker operator and site interface agreement and retain its controlled output.
Purpose scope and accountable roles
RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.
Site manager and shift supervisor owns delivery of this plan. Operations secures staffing and resources; engineering, the HSE lead and relevant competent specialists confirm technical and legal prerequisites. The board resolves constraints affecting critical controls.
Planned arrangements
Site and carrier agree the unloading model, competence, responsibilities, delivery window and emergency communication. Verify the ordered grade, compartment quantity, receiving tank identity and available capacity using reliable current information.
Before connection, confirm the receiving route, venting and recovery arrangements, equipment condition, safe tanker position and public segregation. Monitor transfer under the agreed attended or driver-controlled arrangements and stop on any loss of control.
Required planning outputs
Responsibilities: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Competent persons: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Arrival checks: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Attendance model: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Communication: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Alarms and emergency actions: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Delivery verification and review
Before departure, verify the transfer has ended safely, connections are correctly disconnected and secured, delivered quantities are reconciled and defects are communicated. The responsible parties retain the delivery and receiving evidence.
| Stage | Example management arrangement |
| Before the activity | Owner confirms the scope, competent people, current information and permissions. Open critical prerequisites prevent release. |
| At implementation | Site supervisor verifies the physical arrangement and understanding. Engineering checks the accepted technical criteria for the affected equipment. |
| After change or failure | Suspend the affected scope, assess the changed risk, update information and brief people before a new decision. |
| Planned review | Owner reviews at a justified risk-based interval. Area management challenges evidence and independent assurance samples effectiveness. |
Stop escalation and return
Do not connect or continue if tank identity/capacity is uncertain, safeguards or communications fail, there is leakage, vapour, ignition risk, unsafe public access, unexpected level change or an emergency.
The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.
Worked decision
The delivery note and local tank label do not agree. The driver and site supervisor do not connect, segregate the delivery area and escalate to engineering and the carrier. Delivery remains held until identity and capacity are independently resolved and the parties repeat the pre-delivery checks.
This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.
Guidance and related arrangements
Primary guidance 1
Primary guidance 2
Standard Operating Procedures
Crownway document overview
Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.
Primary references: l133 | owner petrol station