Tank integrity inspection and examination plan
Crownway Fuels Ltd. CWF-PLN-TANK-01. Version 1.0. Prepared 10 November 2026.
COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.
Provide the site/task-specific tank integrity inspection and examination plan and retain its controlled output.
Purpose scope and accountable roles
BULK; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.
Engineering and asset integrity manager owns delivery of this plan. Operations secures staffing and resources; engineering, the HSE lead and relevant competent specialists confirm technical and legal prerequisites. The board resolves constraints affecting critical controls.
Planned arrangements
Engineering identifies tanks, pipework, vents, containment, level systems and overfill protection by stable asset references. Obtain the actual design basis, safe working capacity, degradation mechanisms and inspection history.
Set competent inspection and proof-test requirements from risk, design and applicable duties. Control bund drainage, penetrations and changes; assess vapour and liquid consequences separately. Never fill to an example quantity.
Required planning outputs
Risk-based intervals: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Methods: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Acceptance criteria: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Competent inspector and repair/fitness-for-service approval: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Delivery verification and review
Trace a test to the actual sensor, logic, final element and response criteria, including bypasses and restoration. Record failures and restrictions. Visual cleanliness of a bund is not proof of integrity or adequate firewater capacity.
| Stage | Example management arrangement |
| Before the activity | Owner confirms the scope, competent people, current information and permissions. Open critical prerequisites prevent release. |
| At implementation | Site supervisor verifies the physical arrangement and understanding. Engineering checks the accepted technical criteria for the affected equipment. |
| After change or failure | Suspend the affected scope, assess the changed risk, update information and brief people before a new decision. |
| Planned review | Owner reviews at a justified risk-based interval. Area management challenges evidence and independent assurance samples effectiveness. |
Stop escalation and return
Remove affected tank/transfer from service for failed high-level protection, integrity loss, unassessed defects, unsuitable containment or an overdue safety-critical test without a competent approved safe basis.
The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.
Worked decision
A tank test record names the instrument but gives no result for the final shutdown element. Engineering declines the complete-loop test claim and retains the relevant receiving restriction until a competent test and controlled restoration provide the missing evidence.
This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.
Guidance and related arrangements
Primary guidance 1
Primary guidance 2
Asset integrity and mechanical integrity
Crownway document overview
Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.
Primary references: hsg176 | prevent groundwater pollution from underground fuel storage tanks