CWF-PLN-COMAH-01 · Completed fictional example · Owner role: Process safety and COMAH lead
Lower tier COMAH MAPP and SMS implementation plan
Crownway Fuels Ltd. CWF-PLN-COMAH-01. Version 1.0. Prepared 10 November 2026.
COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.
Provide the site/task-specific lower tier comah mapp and sms implementation plan and retain its controlled output.
Purpose scope and accountable roles
BULK. Apply to the requested lower-tier scenario only; verify inventory, configuration and jurisdiction. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.
Process safety and COMAH lead owns delivery of this plan. Operations secures staffing and resources; engineering, the HSE lead and relevant competent specialists confirm technical and legal prerequisites. The board resolves constraints affecting critical controls.
Planned arrangements
For an establishment found in scope, the operator identifies major-accident scenarios affecting people and the environment, including domino and common-cause effects. The board sets prevention commitments and provides competent resources.
Implement the MAPP through proportionate arrangements for organisation, hazard evaluation, operating control, change, emergencies, monitoring, audit and review. Keep notification and public-information duties distinct from the additional upper-tier safety-report and emergency-plan duties.
Required planning outputs
MAPP commitments: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Roles/resources: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Major-accident scope: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
SMS arrangements and implementation evidence: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Statutory policy content: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Delivery verification and review
Challenge a representative loss-of-containment scenario from initiating event through every claimed barrier. Trace owners, performance criteria, independence, tests and impairment response. A low personal-injury rate does not demonstrate major-accident control.
| Stage | Example management arrangement |
| Before the activity | Owner confirms the scope, competent people, current information and permissions. Open critical prerequisites prevent release. |
| At implementation | Site supervisor verifies the physical arrangement and understanding. Engineering checks the accepted technical criteria for the affected equipment. |
| After change or failure | Suspend the affected scope, assess the changed risk, update information and brief people before a new decision. |
| Planned review | Owner reviews at a justified risk-based interval. Area management challenges evidence and independent assurance samples effectiveness. |
Stop escalation and return
Suspend the affected activity when a required major-accident barrier is unavailable without an approved, time-limited safe alternative; unresolved risk is escalated to the site accountable manager and board.
The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.
Worked decision
A proposed independent overfill trip shares an unverified power supply with the normal level instrument. Engineering records the dependency and holds acceptance of the independent-protection claim. The scenario stays open pending competent evaluation and tested design evidence.
This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.
Guidance and related arrangements
Primary guidance 1
Primary guidance 2
What Process Safety Management Is
Crownway document overview
Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.
Primary references: comah15 | official requirements